EP 1,544,376 A2#4113418 Most CitedPendingEuropean Patent Office (EPO)Application
Inner shuttering section for the erection of a construction section
20Forward Citations (#4113418 Global)
0.9/yrCitation Velocity (#7529094 Global)
5.34Citation PageRank (#2978762 Global)
5Prior Art Cited
0Structured Claims
0Drawings / Sheets
Abstract
In a concrete construction process to erect e.g. a wind turbine tower, the structure is erected as a stacked series of rings. The steel-reinforced concrete ring is formed between outer and inner shuttering. The inner shuttering is assembled from a series of upright vertical slats resting against an inner load-bearing ring (24). The ring and slats are linked by bolt clamps.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 20.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗