<P>PROBLEM TO BE SOLVED: To firmly connect a hollow pipe for forming a sand pile and perform expansion and contraction work for its connection, separation, and storage easily, safely, securely, and automatically by remote operation in a short time. <P>SOLUTION: This…
Yuguchi Daisuke
PROBLEM TO BE SOLVED: To ensure fixation at the time of the stretching and shortening of a leader by fixing a turning flange into the lower recessed section of an internal leader under a stretched state, erecting the tuning flange and lowering the internal leader. SOLUTION: When…
PURPOSE:To attain improvement of manufacturability, shortening a repair time, simplifying repair work and lightening weight, of a bow protruding bulb, relating to a spherical bow for a high speed ship. CONSTITUTION:In a bow protruding bulb 2 in a long scaled condition arranged…
PROBLEM TO BE SOLVED: To reduce a water height during shifting, to increase an improving depth, and desides, to ensure stability of work. SOLUTION: A sand pile driving barge comprises a pulley 8 supported on the upper part of an outer cylinder 5 and the lower part of an inner…
PURPOSE:To make it possible to economically enlarge a ship hold, by building up a bulk increasing part having a predetermined height on the coaming top of an existing hatch coaming to increase the capacity of the hatch coaming so that the amount of working and the amount of…