hottub.patents
Inventor / Author Profile

Yang Simou

0Total Forward Citations
2Indexed Patents
0Patent H-Index
CN 110,682,922 A#457402 Most Cited · 0 citations0.0/yr · PR 0.97ActiveCN · Utility
Implementation method for adding station in existing line section

The invention discloses an implementation method for adding stations in an existing line interval, which comprises the following steps: performing the first-stage safety enclosure and completing the implementation of the first-stage safety enclosure to form a first-stage…

CN 219,731,630 U#712702 Most Cited · 0 citations0.0/yr · PR 0.97ActiveCN · Utility
Supporting structure for tunnel crossing bridge pile
Inventors: Lin Yong'an, Yang Simou, Zeng Linhai, Chen Yong, He JianAssignee: Guangdong Zhonggong Architectural Design Inst Co LtdFiled 2023-05-10 · Granted 2023-09-22

The utility model relates to a supporting structure for a tunnel crossing bridge pile, which comprises a bridge span, a first bridge pile, a second bridge pile and a forming mechanism, wherein two ends of the bridge span are respectively arranged on the first bridge pile and the…