CN 203,808,015 U#1396904 Most Cited · 0 citations0.0/yr · PR 0.97ActiveCN · Utility
Rebar waterstop processing structure
Inventors: Yan Chengbin, Jin Jian, Wang MingAssignee: Guiyang Engineering Corp LtdFiled 2014-03-12 · Granted 2014-09-03

The utility model discloses a rebar waterstop processing structure which comprises reinforced concrete and an expansion and contraction joint arranged in the reinforced concrete. Two waterstops are buried in the expansion and contraction joint, a structural rebar is arranged on…

CN 206,768,986 U#1802525 Most Cited · 0 citations0.0/yr · PR 0.97ActiveCN · Utility
Improved cable trench structure serving as drainage trench
Inventors: Shi Wenjie, Li Gang, Yan Chengbin, Chen Xiaodong, Yuan QiangAssignee: Powerchina Guiyang Engineering Corp LtdFiled 2017-03-31 · Granted 2017-12-19

The utility model provides an improve cable pit and do escape canal structure concurrently, including cable pit and escape canal, the bottom plate elevation that one side of cable pit bottom plate was equipped with escape canal and escape canal should be less than the bottom…

CN 207,525,861 U#2136946 Most Cited · 0 citations0.0/yr · PR 0.97ActiveCN · Utility
Underground factory building lower floor drainage corridor
Inventors: Yang Man, Jin Jian, Xiang Xianjing, Yan Chengbin, Yuan QiangAssignee: Powerchina Guiyang Engineering Corp LtdFiled 2017-11-18 · Granted 2018-06-22

The utility model discloses an underground factory building lower floor's drainage corridor is done into the wind-tunnel section with drainage corridor simultaneously and is carried out full section concrete lining, buries the blind material of drainage underground in the…