The invention relates to the field of numerical simulation of dam grouting in hydraulic and hydro-power engineering, and provides a numerical simulation method of grouting, which is capable of finely simulating geological information and fracture information and is tightly…
Wu Binping
The present invention discloses a kind of concrete structural surface and internal injury fine modeling method, and key step includes:Concrete structural surface after 3 D laser scanning destruction, obtains three dimensional point cloud, establishes threedimensional model and…
The present invention discloses a kind of compacting operation construction quality intelligent monitor system based on AR technologies, including sensing module, data transmission memory module and data analysis and visualization model;A kind of monitoring method based on above…
The present invention discloses a kind of Construction of Rolled Concrete Dam quality overall evaluation method for considering parameter uncertainty, and this method step includes:Construction of Rolled Concrete Dam quality evaluation system is built first, secondly, sets up…
The invention discloses a diffusion frontal surface curtain grouting numerical simulation method based on cement slurry thixotropy and VOF calculation. The method comprises the following steps: establishing a three-dimensional geological model and a grouting hole model, and…
The present invention discloses a kind of concrete dam compaction quality method for quick predicting for considering parameter uncertainty and influencing, and key step includes:Structure raw data set is established assessment indicator system, analysis and quantization…
The invention discloses a method for planning a group path of an unmanned rolling machine, which sequentially comprises the following steps: splitting a bin surface, planning an operation path in a sub-bin surface, planning a transition operation path between the sub-bin…
The invention discloses one kind rolling machine automatic drive system, including:Roller, the roller are the carriers of Unmanned Systems, and information Perception unit, vehicle carried driving brain and executive device and wireless communication unit are provided on the…
A method for real-timely monitoring construction interlayer bonding time of roller compacted concrete comprises the steps: GPS positioning devices and radio station differential devices are installed on a leveling machine and a rolling machine and used for acquiring real-time…
The invention discloses an intelligent rockfill-dam surface sprinkle water amount monitoring system and a monitoring method thereof. The intelligent rockfill-dam surface sprinkle water amount monitoring system comprises a sprinkler cart, a GPS (global position system)…
The present invention discloses a kind of unmanned method of vibrating roller press applied to construction of hydro project, and key step includes:Start roller;Module powers on;Obstacle avoidance module is observed by on-board controller and whether perception control module…
The invention relates to a dynamic visual simulation method for an earth-rock dam construction progress based on BIM, which comprises the following steps: 1) sensing real-time construction data of an earth and rockfill dam construction site through an earth and rockfill dam…
The invention belongs to the technical field of image recognition and geological modeling, and particularly relates to a borehole image fracture parameter automatic extraction method based on deep learning. According to the method, a deep learning technology is introduced into a…
The invention belongs to the technical field of geological modeling, and particularly relates to a BIM-based three-dimensional geological automatic modeling method which comprises the steps of obtaining multi-source geological exploration data, carrying out data fusion…
The invention discloses a BIM visualization technology-based dynamic simulation analysis method for the whole life cycle of high arch dam construction, which mainly comprises the following steps: 1) building a BIM system with unified construction information and simulation…
The invention discloses a kind of hybrid communication systems for Construction of Hydropower Engineering Real-time quality monitoring system, it include the common network using the public wireless data sending communication modes of telecom operators, work area has also been…
The invention discloses an intelligent compaction quality monitoring system based on an acceleration sensor, which comprises a data processing module, a grinding wheel vibration state acquisition module, a grinding machine pose acquisition module, an image acquisition module and…
The invention discloses a rock-fill dam earth and stone allocation optimization method based on improved interval multi-objective optimization, which comprises the following steps: (1) and acquiring rock-fill dam earth and rock allocation modeling information. (2) And…
The invention discloses a dam seepage parameter inversion method, which comprises the following steps: step 1: extracting sample points from the value range of seepage parameters to be inverted by adopting a Latin hypercube sampling method; step 2: calculating a response value…
Paved construction quality method for real-time monitoring the invention discloses a kind of core wall rockfill dam, comprised the following steps:(1) monitor terminal is installed on paver to obtain paver coordinate in real time;(2) revised paver coordinate is sent to remote…
The invention discloses it is a kind of based on laser scanner hydroelectric project the cubic metre of earth and stone fill out digging looks monitoring method, for backfill with excavation construction operation process in monitoring face three dimensional appearance and…
The invention discloses an intelligent paving monitoring system for an earth and rockfill dam and a monitoring method thereof, wherein the intelligent paving monitoring system comprises a differential base station, a relay station, a sub-control station, a bulldozer monitoring…
Gravel earth material is mixed the present invention relates to gravelly soil core wall rockfill dam core-wall to mix with quality monitoring technology, is mixed gravel earth material backhoe for the current gravelly soil core wall rockfill dam core-wall of solution and is…
The present invention is based on the CFRD Embankment construction overall process management-control method of roller compaction process real time monitoring and the mobile detection of PDA, includes the following steps: that the first step, target determine: construction…
The invention discloses a dam construction machinery state intelligent sensing and monitoring method based on a smart phone, which comprises the steps of arranging a smart phone APP, a cloud server and a computer client to an on-site machinery and a sub-control station;…