A flue gas stream having passed a flue gas desulfurization plant 2 enters a reactor 6 flowing through an activated carbon bed. The flue gas entering the reactor continuously is discontinuously blended with ammonia, thereby achieving a low ammonia content of the flue gas leaving…
Weiler Helmut
NO x is removed from flue gases by contacting same in the presence of active coke/active carbon and a reducing agent, e.g. NH 3 , CO or H 2 . According to the invention, the adsorbent is precharged with the reducing agent, thereby increasing the surface area over which the…
Bel unserem Verfahren zur Abscheidung von NO X aus Gasen, insbesondere Rauchgasen. bei dem das NO X aus dem Rauchgas an einem festen Adsorptionsmittel, insbesondere Aktivkohle/Aktivkoks. unter Zugabe eines Reduktionsmittels, insbesondere Ammoniak, CO, Wasserstoff, katalytisch…
The flue gas to be denitrified, coming from a flue-gas desulphurization plant, is brought to a temperature of about 320 DEG C by a heat exchanger (4), charged with ammonia by a mixer (3) and fed to a fan burner (2). In the burner (2), the flue gas passes through a flame zone…
The storage block (1) consists of a nest of thermoplastic pipes. The pipes (3) are round in cross-section and form the heating surfaces of gas channels. The individual pipes are welded together at their outer surfaces. The novel storage block can reduce the rate of deposit of…
A process and appts. are claimed to separate solid reaction products from suspensions. The novelty is that the suspensions are alternately passed through two or more filter cartridges. Each filter is cleaned while the suspension filters through the other filter. The flow of…
In certain chemical processes, gypsum is formed in fine-particle form. Previously, the gypsum after dehydration by filtration always needed to be dried before the fine-particle gypsum could be compacted to give granules. To simplify the previous process, according to the…
1. A process for drying moist gypsum, in particular gypsum from a wet-chemical flue-gas desulphurisation unit, by means of flue gas from a furnace installation, in particular of a coal-fired power station, wherein heat is exchanged between the air, which at least in part is fed…
Ein Rauchgasstrom wird nach Durchlauf einer Rauchgasentschwefelungsanlage (2) durch ein Aktivkoksbett in einen Reaktor (6) geleitet. Dem kontinuierlich in den Reaktor eintretenden Rauchgasstrom wird Ammoniak diskontinuierlich in periodischen Intervallen zudosiert, wodurch bei…
Bei bestimmten chemischen Prozessen fällt Gips mit feinteiligen Körnern an. Bisher mußte nach einem filtrierenden Entwässern stets eine Trocknung des Gipses erfolgen, ehe eine Kompaktierung des feinteiligen Gipses zu Granulat möglich war. Zur Vereinfachung des bisherigen…
In a process for preparing the absorption agent solution for a flue gas scrubber, fine particulate absorption agent is brought together with water. This solution is stored in vessels and then supplied to the flue gas scrubber. In order to be able to handle more easily the…
From a finely divided gypsum, as is obtained, in particular, from flue-gas desulphurisation plants, a granular gypsum having sufficient strength for further processing at low cost in existing further processing plants is produced by thoroughly mixing the finely divided gypsum…
Hydrated lime is sprayed into the hot gas stream, whereupon the gas stream is cooled and freed from dust. Acid-forming gas components upon cooling below their dew point are converted to particulate easily separable alkaline earth metal salt. The process is energetically…
The storage block (1) consists of a nest of thermoplastic pipes. The pipes (3) are round in cross-section and form the heating surfaces of gas channels. The individual pipes are welded together at their outer surfaces. The novel storage block can reduce the rate of deposit of…
The storage block (1) consists of a nest of thermoplastic pipes. The pipes (3) are round in cross-section and form the heating surfaces of gas channels. The individual pipes are welded together at their outer surfaces. The novel storage block can reduce the rate of deposit of…
1. A process for drying moist gypsum, in particular gypsum from a wet-chemical flue-gas desulphurisation unit, by means of flue gas from a furnace installation, in particular of a coal-fired power station, wherein heat is exchanged between the air, which at least in part is fed…
1. A process for drying moist gypsum, in particular gypsum from a wet-chemical flue-gas desulphurisation unit, by means of flue gas from a furnace installation, in particular of a coal-fired power station, wherein heat is exchanged between the air, which at least in part is fed…
1. A process for drying moist gypsum, in particular gypsum from a wet-chemical flue-gas desulphurisation unit, by means of flue gas from a furnace installation, in particular of a coal-fired power station, wherein heat is exchanged between the air, which at least in part is fed…
The waste water is treated in two stages in the first of which the supersaturation gypsum is separated and in the second of which fine-clarification takes place especially through the addition of precipitating and flocculation agents. To precipitate heavy metals and their…