The invention relates to an operation control method of a broken line transportation type construction lifter, and belongs to the technical field of building hoisting transportation machinery. The invention comprises a broken line transportation type construction lifter, wherein…
Inventor / Author Profile
Wei Fuying
0Total Forward Citations
3Indexed Patents
0Patent H-Index
Frequent Co-Inventors: Chen Jianyang Chu Daokun Jin Hexiang Li Weibo Liu Chuang Meng Guoqing Miao Jinjin Wang Hanwei Wang Jiquan Xu Jinglu Yin Zhihao Zhang Jinchao
The utility model discloses an attachment frame convenient to adjust, which comprises a frame body, wherein the frame body is formed by splicing four folded frame beams which are connected end to end, two adjacent folded frame beams are connected through a fixing piece, the…
The utility model discloses a hoist construction elevator, include: the first winch is arranged at the top of the building and is electrically connected with the controller; the second winch is arranged at the top of the building and is electrically connected with the…