The invention provides a method and a system for monitoring engineering progress, which are characterized in that a BIM model of an engineering is established; associating the BIM model with the construction progress plan of the project to form plan progress data in a project…
Wang Sunjun
The present invention provides a kind of, and the tower crane based on BIM arranges methods of comparison and selection and system, the present invention is according to the weight of component to be lifted, the radius of clean-up of tower crane, single maximum hoisting weight…
The present invention provides a kind of construction methods and system based on virtual technology, the present invention can carry out the making and simulation of 3D construction model animations in 3DMax, so not only save the modeling time, and the difficulty of programming…
The invention provides application processes and system of a kind of BIM in precast concrete supply chain,The present invention is to adapt to precision construction visual management method and the system that PC is built,The information management decision-making designed…
The invention provides a fire-fighting spray model establishing method and a system, wherein a fire-fighting spray CAD drawing is obtained; marking parameters of the pipeline in a fire-fighting spray CAD drawing to obtain a marked fire-fighting spray CAD drawing; linking the…
The present invention provides a kind of three dimensional device monitoring methods and system based on BIM, the present invention is by generating the three-dimensional BIM monitoring models of the equipment to be monitored, the three-dimensional BIM monitoring models include…
The present invention relates to a kind of tilted cylindrical envelope template system and construction methods, belong to construction formwork technical field.The template system, it include the template spliced successively up and down by die plate base, template standard…
The present invention provides the creation methods and system of a kind of nested race of fire pump unit race block, the present invention carries out including fire pump in fire-fighting computer room design process with BIM, the creation of the pipeline section blocking…
The invention provides a method and a system for monitoring on-site fire safety, which can make clear the corresponding responsible person and implement the fire safety management responsibility by dividing the construction area in a BIM model; setting field fire-fighting…
The utility model relates to a tower crane collision device, including installing davit and the balance arm on the tower body, install first radar detection system on the davit for survey the region in davit the place ahead, install second radar detection system on the balance…
The present invention provides a kind of pipe installation method and system, pass through the sign of the mount message in the 3D mathematical models of pipeline, and the setting-out instrument for passing through erecting bed, 3D mathematical models after the corresponding…
The present invention provides a kind of bracket device, for installing overhanging unloading platform, including vertically side plate disposed in parallel, the side plate are symmetrically fixed in the two sides of base plate for base plate and two pieces, and the upper and…
The present invention relates to a kind of tower crane collision prevention devices, including the boom peace arm being mounted on tower body, first radar-probing system is installed on the boom, for detecting the region in front of boom, second radar-probing system is installed…
The invention provides a construction method of a BIM auxiliary inclined structure column, which aims to ensure the measurement and positioning accuracy of the inclined structure column and reduce the error rate of measurement and positioning of the inclined structure column.…
The application provides a storage battery state identification method and a storage battery state identification device, wherein the method comprises the following steps: acquiring the working voltage of a single battery in a storage battery pack, the maximum open-circuit…
The application provides a device monitoring method, apparatus, device, storage medium and program product. The monitoring equipment of the monitoring system is connected with each monitoring subsystem of the monitoring system and the plurality of collectors; the method is…
The embodiment of the application provides a data acquisition method, an edge computing host and a computer readable storage medium, relates to the technical field of industrial Internet of things, and can be applied to the edge computing host, wherein the edge computing host…
The application belongs to the field of Internet of things, and particularly relates to an equipment access method, device, equipment and storage medium for an edge computing host. The method comprises the steps that under the condition that equipment information of equipment to…
The application provides a device access method, a device and a storage medium, and relates to the technical field of industrial Internet of things, wherein the method comprises the following steps: receiving target information sent by a terminal through a device management…
The present invention provides a kind of construction material vertical transporting method and systems, including the BIM Building Information Model according to construction, statistical material type and quantity, the type and quantity of vertical transport tool;Material is…
The present invention provides a kind of modeling method and systems, the present invention to the figure layer of all items in the filter of Revit by carrying out unified establishment, it can be with the corresponding figure layer of Auto-matching and association attributes…
The present invention provides a kind of built-in fittings and installation method for curtain wall installation, belong to construction engineering technical field, are used for the elongated big embedded part in-site installation operation problem of solution framework column,…
The invention provides a building model checking method and system based on BIM, which is characterized in that based on each checking threshold value, a building BIM model is scanned, and each initial unreasonable position in the building BIM model can be automatically…
The method obtains equipment information and an access port of edge equipment sent by an edge host through a cloud server, and further determines a characteristic value of the edge equipment according to the equipment information and the access port, so that a target drive…
The application relates to the technical field of industrial Internet of things correlation, in particular to a data acquisition method, a device, a system and electronic equipment, which are applied to an acquisition host, wherein the acquisition host is used for being…