The invention discloses a method and system for intelligently controlling temperature of concretes of a dam under construction. The system comprises a control device which communicates with a heat exchanging device and a heat exchanging auxiliary device, wherein the heat…
Wang Renkun
The invention relates to the field of vibrating quality control in concrete casting construction of the hydraulic and hydroelectric engineering, in particular to an automatic monitoring method of a concrete casting vibrating blank layer obtained by a laying method or a step…
The invention relates to a method for monitoring the surrounding rock stability of an ultra-large underground cavern group in a construction period, in particular to a method for monitoring the surrounding rock stability of an ultra-large underground cavern group and used in a…
The present invention discloses a kind of arch dam safety evaluation method based on structural strength, basic antiskid and monolithic stability, is related to arch dam safety to control analysis and design field.Arch Dam Structure strength assurance coefficient K 1 Allow that…
The invention relates to a vibration quality control technology in hydraulic engineering concrete pouring construction, in particular to an instant messaging method for concrete vibration quality monitoring data. The instant messaging method mainly comprises the following steps…
The invention discloses a large-scale underground cavern group layout method applied to water conservancy and hydropower engineering and underground storage cavern engineering. The underground cavern group layout method can give overall consideration to major factors having…
The invention discloses a real-time online individualized heat-exchanging intelligent temperature control system of mass concretes, and relates to the control on concrete water cooling in a high concrete dam casting procedure, wherein significance is provided for constructions…
The invention relates to a method for monitoring the effective coverage of concrete vibration in real time, which includes the following steps: a vibrated area is divided into a regular virtual grid according to a set interval; the coordinates of vibrating equipment are acquired…
The invention relates to a quality monitoring method for concrete construction. The method comprises the following steps: (1) obtaining real-time state data of concrete construction equipment, wherein the real-time state data comprise the real-time position of a concrete truck,…
The invention discloses a soil-core-wall rock-fill dam with better burst resistance and a construction method thereof. The soil-core-wall rock-fill dam comprises a soil core wall, wherein one side of the upstream of the soil core wall is provided with an upstream rock-fill…
The invention discloses a layout design method of an underground cavern group applied to a water conservancy and hydropower project and an underground storage. According to the layout method, main factors influencing the stability of surrounding rock of the underground caverns,…
The invention relates to a vibration quality control technique in the concrete pouring construction of water conservancy projects, in particular to a concrete vibration quality monitoring and communication networking method. The method described by the invention mainly includes…
The present invention relates to Hydraulic and Hydro-Power Engineering field, it discloses a kind of Bayesian network model and construction method for step power station risk analysis, the various factors of step power station risk is considered, the identification and…
The invention discloses a kind of extra-high arch dam entirety Anti-crack Design Methods of complex foundation, are related to Arch Dam design field, and providing one kind being capable of the extra-high arch dam entirety Anti-crack Design Method of complex foundation.Method…
The invention discloses a large-scale underground cavern group arrangement design method applied to hydraulic and hydroelectric engineering and underground storage cavern engineering. According to the arrangement design method, principal factors, especially the essential factor…
The invention discloses a kind of equivalent stress analysis method of the full dam body of arch dam, belong to Arch Dam design field, there is provided a kind of equivalent stress analysis method that the quick full dam body of arch dam for calculating processing can be…
The invention discloses a reinforcement construction method and particularly relates to a construction method for reinforcing a large rock slope deep weak structural plane. The construction method comprises the following steps: A, excavating a main tunnel along the direction of…
The invention discloses a large-scale underground cavern group arrangement method applied to hydraulic and hydroelectric engineering and underground storage cavern engineering. According to the arrangement method, principal factors, especially the essential factor of the rock…
The invention provides an automobile jack. The automobile jack comprises a jack body (10) and a detachable jack head (20); the top of the jack body (10) is provided with a fixed jack head (14); the detachable jack head (20) is arranged on the fixed jack head (14) detachably. The…
The invention discloses a kind of recognition methods of step power station key risk factor and risk transmission critical path based on Bayes risk network, it is related to Hydraulic and Hydro-Power Engineering field, step power station risk has the characteristics of common…
The invention relates to a transformation technique of two coordinate systems, discloses a transformation method of GPS (global positioning system) coordinates and local coordinates and aims to quickly transform GPS coordinate data into local coordinate data required by…
The invention relates to a hydraulic engineering concrete pouring construction quality control technology, and discloses a real-time monitoring method for construction of a concrete spreading machine. The problems that reliability is low because the quality of concrete spreading…
The utility model discloses an arrangement system, especially discloses an emptying tunnel or non-normal spillway tunnel arrangement system. The arrangement system belongs to the technical field of hydraulic structure design and manufacture. The arrangement system can…
The invention discloses a full-automatic wall tile and floor tile laying machine. The full-automatic wall tile and floor tile laying machine comprises a blender, a slurry pump, a mobile lead rail, a guide post, an upper drive mechanism, a lower drive mechanism, a mounting base,…
The invention discloses a kind of skewback Against Sliding Stability degree of safety computational methods of arch dam, it is related to arch dam field of engineering technology, solution existing method is selected respectively by the rank of arch dam building cuts rub formula…