The invention discloses a port water area planning method and a system integrating AIS data mining, comprising the following steps of: s1, constructing a port water area sample matrix for quantitative simulation analysis of port water area planning; step S2, obtaining the…
Wang Dachuan
The invention relates to the technical field of port planning, in particular to a green port space planning method in the whole process, which comprises the following steps: determining environmental problems related to port space planning in the current state of port…
The invention discloses a navigation point dynamic replacement method based on personnel and facility selection preference in the field of people stream simulation, which comprises the following steps of importing a building drawing to construct a building simulation model,…
The invention discloses a method for planning an action path of personnel in a building, which belongs to the field of pedestrian flow simulation and comprises the steps of importing a building drawing and constructing a building data model based on a navigation grid; adding…
The utility model provides a binding clip and a clip applying clamp with the same, wherein the binding clip is matched with a ligation clamp and comprises two movably hinged binding clip arms, one opposite sides of the two binding clip arms are provided with accommodating…
The utility model provides a ligature clamp, the purpose is solved among the prior art ligature clamp and is not convenient for deformation at the centre gripping in-process, and imbeds the inside problem of blood vessel easily. There is provided a ligating clip comprising: the…