<P>PROBLEM TO BE SOLVED: To reduce time and labor for the bonding work of precast concrete column and wall, and to secure the bonding strength between the column and the wall. <P>SOLUTION: A column wall member 12 includes the precast concrete column 24 and the…
Urabe Ai
Provided is a tower-like structure made of concrete which is less susceptible to bending fracture, and also provided is a method for building a tower-like structure. Pre-stress is introduced in the vertical direction to a tower-like structure of reinforce concrete standing on a…
<P>PROBLEM TO BE SOLVED: To provide a corrugated earthquake-resistant structure adapted to special environmental conditions and required stress conditions. <P>SOLUTION: Steel is a functional construction material in a general building since it is highly strong,…
<P>PROBLEM TO BE SOLVED: To provide an earthquake-resisting wall hardly causing shear buckling in a steel plate, a building having the earthquake-resisting wall and a construction method of the earthquake-resisting wall. <P>SOLUTION: A reinforcing rigid member 34 is…
<P>PROBLEM TO BE SOLVED: To improve strength against bending fracture of a structural body to which vertical prestress is introduced. <P>SOLUTION: Both of the strength against bending tension fracture and the strength against bending compression fracture are improved…
PROBLEM TO BE SOLVED: To provide a concrete tower-like structure in which bending fracture is hardly caused, and a method for constructing the same.SOLUTION: Pre-stress is introduced to a reinforced-concrete tower-like structure erected on a foundation in a vertical direction,…
<P>PROBLEM TO BE SOLVED: To provide a seismic retrofitting method capable of reducing labor for work. <P>SOLUTION: To connect a corrugated steel earthquake-resisting wall 26 and a stiffening existing wall 40A together, the out-of-plane direction rigidity of the…
<P>PROBLEM TO BE SOLVED: To provide a seismic retrofitting method capable of reducing labor for work. <P>SOLUTION: While strength is decreased by forming slits 46A and 46B in an existing wall 40, the toughness of the whole frame 12 is increased by fixing a corrugated…
<P>PROBLEM TO BE SOLVED: To exhibit the base isolation effect even if large disturbance is added by a big earthquake. <P>SOLUTION: A PC steel material 104 supports a construction 20 in the vertical direction (the Z direction), and floats the structure 20. Thus, when…
<P>PROBLEM TO BE SOLVED: To provide an aseismatic structure and a building having improved freedom in a position of installation of an aseismatic member. <P>SOLUTION: The aseismatic structure 10 is provided with stud members 60, 62, 64, 66. Vertical rigidity is…
<P>PROBLEM TO BE SOLVED: To provide a brace capable of effectively resist a tensile force, an aseismatic structure having the brace, and a building having the brace. <P>SOLUTION: The brace 10 includes a brace body 12 formed of concrete, and a tendon 14. The brace…
PROBLEM TO BE SOLVED: To improve stiffening performance by stiffening ribs.SOLUTION: Earthquake resisting steel walls 10B, 10C are respectively mounted on vertically adjacent frames 12B, 12C. Vertically extending stiffening ribs 28 are mounted on plate surfaces of corrugated…
<P>PROBLEM TO BE SOLVED: To absorb a construction error at a joint part of end flanges. <P>SOLUTION: A filler 28 is filled between the end flanges 22A, 22B of steel members 18 adjoining in a vertical direction. The filler 28 is hardened to join the end flanges 22A,…
<P>PROBLEM TO BE SOLVED: To provide an aseismatic structure having a large degree of freedom in the installation position of an earthquake-resisting wall, a construction method of the aseismatic structure, and a building having the aseismatic structure. <P>SOLUTION:…
<P>PROBLEM TO BE SOLVED: To exert base isolation performance even when large disturbance is applied by a major earthquake etc. <P>SOLUTION: When a relative movement direction (a shaking direction) is along an X direction, a PC steel member 104X arranged in the X…
<P>PROBLEM TO BE SOLVED: To exhibit the base isolation effect, even if large disturbance is added by a big earthquake. <P>SOLUTION: When assuming that the relative movement direction (the rocking direction) runs along the X direction, a PC steel material 104X…
<P>PROBLEM TO BE SOLVED: To install to transmit compressive axial force to an earthquake-resisting stud before constructing the uppermost floor of a building structure. <P>SOLUTION: A member height P of a vibration control member is shorter than the inner size…
<P>PROBLEM TO BE SOLVED: To arrange a linear member on a structure without rotating the structure to be installed. <P>SOLUTION: A rotary member 12 movable in a peripheral direction of the erected structure 14 is arranged on a periphery of the structure 14. The rotary…
<P>PROBLEM TO BE SOLVED: To provide a structure member reduced in the emission amount of carbon dioxide. <P>SOLUTION: A column 16 includes a cured body 22 obtained by curing hydraulic cement through a hydration reaction, and an angular steel pipe 20 integrated with…
<P>PROBLEM TO BE SOLVED: To increase the stiffness of a flat slab against horizontal force. <P>SOLUTION: The flat slab 14 is used as a slab for partitioning the upper and lower floors of a building 18, and is supported by peripheral pillars 20, and pillars 12, 13…