PROBLEM TO BE SOLVED: To construct an underground continuous all that is excellent in strength, rigidity, and toughness and does not require much construction work. SOLUTION: A perforated metallic plate 6 projecting to both sides and a rectilinear joint bar 8 passing through…
Uchii Eiji
<P>PROBLEM TO BE SOLVED: To provide a construction method for rationally arranging a sheet pile, which can reduce the used amount of sheet pile and achieve a reduction in construction cost, by arranging the optimum sheet pile coping with the depth-direction stress and…
PURPOSE:To fill a grout into all of a plurality of sleeves for mutually connecting reinforcements by the filling of the grout from one position. CONSTITUTION:A plurality of sleeves 13 to which reinforcements 11, 12 to be mutually connected are inserted are successively connected…
PROBLEM TO BE SOLVED: To provide a method for constructing a foundation by using a steel form, which dispenses with a concrete curing period, and form dismantling work by embedding the steel form in the ground without removing the same, can drastically reduce a construction…
PROBLEM TO BE SOLVED: To provide a structure of an underground section of a building capable of using an underground wall having a function for an earth retaining wall when the underground section of the building is constructed as an exterior wall in the ground of the building,…
PURPOSE: To construct an underground diaphragm wall having high characteristics of strength, rigidity and ductility. CONSTITUTION: Some of horizontal distribution bars 14, 14 protruding from the placing joint surface of a preconstructed wall 11 toward the side of a wall to be…
<P>PROBLEM TO BE SOLVED: To provide an underground pit formed of a post-cast concrete wall of firm structure with approximately uniform thickness on the whole surface with easy construction, and a suitable core material for a soil-cement column-row wall. <P>SOLUTION:…
<P>PROBLEM TO BE SOLVED: To provide a labor saving method for a core material in a soil cement column row wall reducing a construction cost by reducing stress bearing members used while maintaining required strength in constructing the soil cement column row wall.…
<P>PROBLEM TO BE SOLVED: To provide a bar arrangement structure which has high workability, which can realize cost reduction and the stabilization of quality without considerably decreasing structure bearing capacity at the connection between a pillar and a beam made of…