hottub.patents
US 12,208,397 B2#3626815 Most Cited · 0 citations0.0/yr · PR 0.00ActiveUS · Utility
Pipette tip disposal assembly
Inventors: Paul Courtney, Martin Reid, Stuart Jackson, John Lamont, Ivan McConnellAssignee: RANDOX LABORATORIES LTDFiled 2019-08-02 · Granted 2025-01-28

There is provided a pipette tip disposal assembly. The assembly comprises a receiving element adapted to support an end of at least one pipette tip, the at least one pipette tip being toppled in use from the receiving element along a first direction; and a container positioned…

US 12,440,589 B2#3423224 Most Cited · 0 citations0.0/yr · PR 0.00ActiveUS · Utility
Sterilisation assembly
Inventors: Peter Fitzgerald, David Sloan, Martin Reid, Stuart JacksonAssignee: RANDOX LABORATORIES LTDFiled 2020-04-09 · Granted 2025-10-14

There is provided a sterilisation assembly for a molecular diagnostic assay analyse. The assembly comprising: an enclosure having a passage therethrough, the passage being arranged in use to allow an assay sample set to pass through the enclosure, the enclosure defining a…

US 12,478,973 B2#3387546 Most Cited · 0 citations0.0/yr · PR 0.00ActiveUS · Utility
Pipette tip carrier assembly
Inventors: Proinnsias McGleenan, P Evans, Stuart Jackson, Martin Reid, Peter FitzgeraldAssignee: RANDOX LABORATORIES LTDFiled 2020-04-08 · Granted 2025-11-25

A pipette tip carrier assembly suitable for storing elongate pipette tips in a biochemical analyser is described. The pipette tip carrier assembly comprises one or more holding elements each adapted to hold, in use, a respective pipette tip oriented such that the elongate…

US 2025/0328379 A1#2770547 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
DYNAMIC UNRELATED PARALLEL MACHINE SCHEDULING (UPMS) WITH WEIGHTED JOBS AND BALANCED LOADS

Aspects of the subject disclosure may include, for example, receiving information regarding a plurality of jobs, assigning the plurality of jobs to a plurality of workers in accordance with a base schedule, wherein the base schedule is derived by solving an initial scheduling…