A probe for inspecting a bore includes a housing dimensioned for insertion into the bore and a plurality of stabilization legs having a first end attached to the housing and a second end extendable from the housing. The stabilization legs are configured to contact the inner…
Smith Jarred
A probe for inspecting a bore includes a housing dimensioned for insertion into the bore and a plurality of stabilization legs having a first end attached to the housing and a second end extendable from the housing. The stabilization legs are configured to contact the inner…
An apparatus for delivering a tool into a nuclear reactor jet pump submerged in a reactor pool includes a frame, and a propulsion unit for controlling the movement of the tool delivery apparatus within a pool of liquid. A guide assembly provides for delivery and insertion of the…
An apparatus for delivering a tool into a nuclear reactor jet pump submerged in a reactor pool includes a frame, and a propulsion unit for controlling the movement of the tool delivery apparatus within a pool of liquid. A guide assembly provides for delivery and insertion of the…
A method for delivery of a tool into a submerged bore includes controlling the movement of a tool delivery device in the pool by operating at least one propulsion drive located on the tool delivery device. The tool delivery device is coupled to an inlet to the bore and a tool is…
A method for delivery of a tool into a submerged bore includes controlling the movement of a tool delivery device in the pool by operating at least one propulsion drive located on the tool delivery device. The tool delivery device is coupled to an inlet to the bore and a tool is…
<P>PROBLEM TO BE SOLVED: To provide an assembly for shortening time required for performing inspection by sending out an inspection tool into the interior of a jet pump. <P>SOLUTION: This device for sending out the tool 120 into the nuclear reactor jet pump immersed…
<P>PROBLEM TO BE SOLVED: To provide a method for conveying a tool into an underwater hole. <P>SOLUTION: The method for conveying a tool into an underwater hole includes a step for controlling the travel of a tool conveying apparatus in a pool by operating at least…
<P>PROBLEM TO BE SOLVED: To provide an inspection probe which can be inserted into a bore for inspection regardless of vertical and non-vertical bores. <P>SOLUTION: The probe (100) for inspecting the bore includes a housing (101) dimensioned for insertion into the…
Eine Sonde (100) zum Inspizieren einer Bohrung weist ein Gehäuse auf, das zum Einführen in die Bohrung abgemessen ist, sowie mehrere Stabilisierungsbeine (112), die ein erstes Ende (106), das an dem Gehäuse (101) angeordnet ist, und ein zweites Ende (108) aufweisen, das aus dem…
Ein Verfahren zum Einbringen eines Werkzeugs (120) in eine getauchte Bohrung umfasst das Steuern der Bewegung einer Werkzeugeinbringvorrichtung (100) in einem Becken durch das Bedienen von wenigstens einem Vorschubantrieb (108), der an der Werkzeugeinbringvorrichtung (100)…
An apparatus for delivering a tool into a nuclear reactor jet pump submerged in a reactor pool includes a frame, and a propulsion unit for controlling the movement of the tool delivery apparatus within a pool of liquid. A guide assembly provides for delivery and insertion of the…
Aparato para suministrar una herramienta dentro de una bomba de chorro de reactor nuclear sumergida. Un aparato para suministrar una herramienta (120) dentro de una bomba (326) de chorro de un reactor nuclear sumergida en una piscina (302) del reactor incluye un chasis (103), y…
A probe for inspecting a bore includes a housing dimensioned for insertion into the bore and a plurality of stabilization legs having a first end attached to the housing and a second end extendable from the housing. The stabilization legs are configured to contact the inner…
Sonda de inspección de tubería. Una sonda (100) para inspeccionar una tubería que incluye un alojamiento (101) dimensionado para su inserción dentro de la tubería y una pluralidad de patillas (112) estabilizadoras que tienen un primer extremo (106) fijado al alojamiento (101) y…
A method for delivery of a tool into a submerged bore includes controlling the movement of a tool delivery device in the pool by operating at least one propulsion drive located on the tool delivery device. The tool delivery device is coupled to an inlet to the bore and a tool is…
Procedimiento para suministrar una herramienta dentro de una bomba de chorro de reactor nuclear sumergida. Un procedimiento de suministro de una herramienta dentro de una tubería sumergida incluye el control del movimiento de un dispositivo de suministro de herramientas en una…
A probe (100) for inspecting a bore includes a housing (101) dimensioned for insertion into the bore and a plurality of stabilization legs (112) having a first end (106) attached to the housing (101) and a second end (108) extendable from the housing (101). The stabilization…
A method for delivery of a tool into a submerged bore includes controlling the movement of a tool delivery device in a pool by operating at least one propulsion drive located on the tool delivery device. The tool delivery device is coupled to an inlet to the bore and a tool is…
An apparatus for delivering a tool (120) into a nuclear reactor jet pump (326) submerged in a reactor pool (302) includes a frame (103), and a propulsion unit (108) for controlling the movement of the tool delivery apparatus (100) within a pool (302) of liquid. A guide assembly…