Prefabricated absorber elements for cladding EMC test chambers consist of absorbers (1) which are fitted on a carrier panel (2). The carrier panel (2) is suspended in a substructure (3) which is fastened to a wall or ceiling. <IMAGE>
Simonelli Alberto
An EMC measurement room is equipped with absorber panels (6) which are mounted on a substructure (4, 5). The absorber panels (6) have at least one central mounting hole (10) and are connected detachably to the substructure (4, 5) by means of a self-locking dowel (9).…
Prefabricated absorber elements for cladding EMC test chambers consist of absorbers (1) which are fitted on a carrier panel (2). The carrier panel (2) is suspended in a substructure (3) which is fastened to a wall or ceiling. <IMAGE>
Prefabricated absorber elements for cladding EMC test chambers consist of absorbers (1) which are fitted on a carrier panel (2). The carrier panel (2) is suspended in a substructure (3) which is fastened to a wall or ceiling. <IMAGE>
The measurement space has a plastics fixing part (1) which has a central region (2) introduced into the fixing hole of an absorber plate. An outer diameter (D1) of the central region is selected to enable the fixing part to enter the fixing hole. The upper portion of the fixing…
Prefabricated absorber elements for cladding EMC test chambers consist of absorbers (1) which are fitted on a carrier panel (2). The carrier panel (2) is suspended in a substructure (3) which is fastened to a wall or ceiling. <IMAGE>
Prefabricated absorber elements for cladding EMC test chambers consist of absorbers (1) which are fitted on a carrier panel (2). The carrier panel (2) is suspended in a substructure (3) which is fastened to a wall or ceiling. <IMAGE>