Method of repairing a leak in a well production string by milling a protective pipe string down between the conductor pipe and the production string, and cementing it in place at depths up to 500 feet.
Inventor / Author Profile
Sheffield Robert E
47Total Forward Citations
2Indexed Patents
2Patent H-Index
Frequent Co-Inventors: Chew Robert L Cutler Charles R
A process for optimizing the combustion of fuel in a furnace wherein the total weight of carbon and hydrogen in the fuel is determined and from the total weight of hydrogen and carbon the air required for combustion can be computed with the air flow to the furnace being adjusted…