hottub.patents
US 8,108,168 B2#1699454 Most Cited · 36 citations2.6/yr · PR 3.87ActiveUS · Utility
Managing non-destructive evaluation data
Inventors: Sharp Thomas D, Roth Ii Richard A, Liggett Uriah M, Kesler Joseph MAssignee: Sharp Thomas D, Roth Ii Richard AFiled 2009-03-12 · Granted 2012-01-31

A method, apparatus and program product manage non-destructive evaluation (“NDE”) data. NDE data and inspection information for at least a portion of an asset are received and at least one alignment algorithm to align the NDE data to a simulated model of the at least a portion…

US 2010235112 A1#3067752 Most Cited · 25 citations1.6/yr · PR 3.22PendingUS · Application
Managing non-destructive evaluation data

Embodiments of the invention include methods to manage non-destructive evaluation (“NDE”) data. The method includes receiving NDE data for at least a portion of an asset along with inspection information associated with the at least a portion of the asset, and determining at…

US 2014277662 A1#4510023 Most Cited · 19 citations1.6/yr · PR 3.63PendingUS · Application
Manufacture modeling and monitoring

Methods, apparatus, and computer program products for analyzing, monitoring, and/or modeling the manufacture of a type of part by a manufacturing process. Non-destructive evaluation data and/or quality related data collected from manufactured parts of the type of part may be…

US 2010235153 A1#5952893 Most Cited · 16 citations1.0/yr · PR 1.90PendingUS · Application
Managing non-destructive evaluation data

Methods manage non-destructive evaluation (“NDE”) data. NDE data for an asset is received and at least one alignment algorithm to align the NDE data to a simulated model associated therewith is determined. The NDE data is automatically aligned to the simulated model, a display…

US 2010235111 A1#10403064 Most Cited · 10 citations0.6/yr · PR 2.14PendingUS · Application
Managing non-destructive evaluation data

A method, apparatus and program product manage non-destructive evaluation (“NDE”) data. NDE data and inspection information for at least a portion of an asset are received and at least one alignment algorithm to align the NDE data to a simulated model of the at least a portion…

US 2008011100 A1#14903015 Most Cited · 7 citations0.4/yr · PR 1.94PendingUS · Application
In-Flow Determination Of Left And Right Eigenvectors In A Coriolis Flowmeter

A method and apparatus is disclosed that enables the periodic calculation of the relative phase of the left eigenvector for a vibrating conduit. During normal operation, two drivers are used in tandem to excite the main bending mode of the conduit ( 202 ). Periodically, first…

US 8,521,480 B2#17556106 Most Cited · 6 citations0.5/yr · PR 1.68ActiveUS · Utility
Managing non-destructive evaluation data
Inventors: Kesler Joseph M, Liggett Uriah M, Roth Ii Richard A, Sharp Thomas DAssignee: Kesler Joseph M, Liggett Uriah MFiled 2009-11-12 · Granted 2013-08-27

Embodiments of the invention include methods to manage non-destructive evaluation (“NDE”) data. The method includes receiving NDE data for at least a portion of an asset along with inspection information associated with the at least a portion of the asset, and determining at…

US 2013289943 A1#24889302 Most Cited · 4 citations0.3/yr · PR 1.37PendingUS · Application
Managing non-destructive evaluation data

Methods manage non-destructive evaluation (“NDE”) data. NDE data for an asset is received and at least one alignment algorithm to align the NDE data to a simulated model associated therewith is determined. The NDE data is automatically aligned to the simulated model, a display…

US 2019212721 A1#42498063 Most Cited · 2 citations0.3/yr · PR 0.95PendingUS · Application
Manufacture modeling and monitoring

Methods, apparatus, and computer program products for analyzing, monitoring, and/or modeling the manufacture of a type of part by a manufacturing process. Non-destructive evaluation data and/or quality related data collected from manufactured parts of the type of part may be…

US 8,473,236 B2#37195933 Most Cited · 2 citations0.1/yr · PR 1.12ActiveUS · Utility
Managing non-destructive evaluation data
Inventors: Kesler Joseph M, Liggett Uriah M, Roth Ii Richard A, Sharp Thomas DAssignee: Kesler Joseph M, Liggett Uriah MFiled 2009-09-10 · Granted 2013-06-25

Methods manage non-destructive evaluation (“NDE”) data. NDE data for an asset is received and at least one alignment algorithm to align the NDE data to a simulated model associated therewith is determined. The NDE data is automatically aligned to the simulated model, a display…

US 10,657,197 B2#61148315 Most Cited · 1 citations0.2/yr · PR 0.75ActiveUS · Utility
Managing non-destructive evaluation data
Inventors: Sharp Thomas D, Roth Ii Richard Allan, Ligget Uriah M, Kesler JoeAssignee: Etegent Tech LtdFiled 2017-10-31 · Granted 2020-05-19

Methods manage non-destructive evaluation (“NDE”) data. NDE data for an asset is received and at least one alignment algorithm to align the NDE data to a simulated model associated therewith is determined. The NDE data is automatically aligned to the simulated model, a display…

US 11,543,811 B2#55269529 Most Cited · 1 citations0.3/yr · PR 0.81ActiveUS · Utility
Manufacture modeling and monitoring
Inventors: Kesler Joseph M, Sharp Thomas D, Ligget Uriah M, Bahr Brian, Hodapp Chris MAssignee: Etegent Tech LtdFiled 2018-01-05 · Granted 2023-01-03

Methods, apparatus, and computer program products for analyzing, monitoring, and/or modeling the manufacture of a type of part by a manufacturing process. Non-destructive evaluation data and/or quality related data collected from manufactured parts of the type of part may be…

US 9,804,997 B2#56244340 Most Cited · 1 citations0.1/yr · PR 0.80ActiveUS · Utility
Managing non-destructive evaluation data
Inventors: Sharp Thomas D, Roth Ii Richard A, Liggett Uriah M, Kesler Joseph MAssignee: Etegent Tech LtdFiled 2013-06-25 · Granted 2017-10-31

Methods manage non-destructive evaluation (“NDE”) data. NDE data for an asset is received and at least one alignment algorithm to align the NDE data to a simulated model associated therewith is determined. The NDE data is automatically aligned to the simulated model, a display…

US 9,864,366 B2#55481307 Most Cited · 1 citations0.1/yr · PR 0.81ActiveUS · Utility
Manufacture modeling and monitoring
Inventors: Kesler Joseph M, Sharp Thomas D, Liggett Uriah M, Bahr Brian, Hodapp Chris MAssignee: Etegent Tech LtdFiled 2014-03-14 · Granted 2018-01-09

Methods, apparatus, and computer program products for analyzing, monitoring, and/or modeling the manufacture of a type of part by a manufacturing process. Non-destructive evaluation data and/or quality related data collected from manufactured parts of the type of part may be…

WO 2010/104614 A1#49605263 Most Cited · 1 citations0.1/yr · PR 0.88PendingWO · Application
Managing non-destructive evaluation data

A method, apparatus (10) and program product manage non-destructive evaluation ("NDE") data. NDE data (70) and inspection information (72) for at least a portion of an asset are received and at least one alignment algorithm (78) to align the NDE data to a simulated model…

EP 2,406,709 A1#131450979 Most Cited · 0 citations0.0/yr · PR 0.56PendingEP · Application
Managing non-destructive evaluation data

A method, apparatus (10) and program product manage non-destructive evaluation ("NDE") data. NDE data (70) and inspection information (72) for at least a portion of an asset are received and at least one alignment algorithm (78) to align the NDE data to a simulated model…

US 11,514,133 B2#65106808 Most Cited · 0 citations0.0/yr · PR 0.56ActiveUS · Utility
Managing non-destructive evaluation data
Inventors: Sharp Thomas D, Roth Ii Richard A, Liggett Uriah M, Kesler Joseph MAssignee: Etegent Tech LtdFiled 2020-05-15 · Granted 2022-11-29

Methods manage non-destructive evaluation (“NDE”) data. NDE data for an asset is received and at least one alignment algorithm to align the NDE data to a simulated model associated therewith is determined. The NDE data is automatically aligned to the simulated model, a display…

US 2018067897 A1#91691812 Most Cited · 0 citations0.0/yr · PR 0.56PendingUS · Application
Managing non-destructive evaluation data

Methods manage non-destructive evaluation (“NDE”) data. NDE data for an asset is received and at least one alignment algorithm to align the NDE data to a simulated model associated therewith is determined. The NDE data is automatically aligned to the simulated model, a display…

US 2020218242 A9#62257894 Most Cited · 0 citations0.0/yr · PR 0.56ActiveUS · Utility
Manufacture modeling and monitoring

Methods, apparatus, and computer program products for analyzing, monitoring, and/or modeling the manufacture of a type of part by a manufacturing process. Non-destructive evaluation data and/or quality related data collected from manufactured parts of the type of part may be…

US 2020387562 A1#140960135 Most Cited · 0 citations0.0/yr · PR 0.56PendingUS · Application
Managing Non-Destructive Evaluation Data

Methods manage non-destructive evaluation (“NDE”) data. NDE data for an asset is received and at least one alignment algorithm to align the NDE data to a simulated model associated therewith is determined. The NDE data is automatically aligned to the simulated model, a display…

US 2023091072 A1#118444483 Most Cited · 0 citations0.0/yr · PR 0.56PendingUS · Application
Managing Non-Destructive Evaluation Data

Methods manage non-destructive evaluation (“NDE”) data. NDE data for an asset is received and at least one alignment algorithm to align the NDE data to a simulated model associated therewith is determined. The NDE data is automatically aligned to the simulated model, a display…

US 2023134403 A1#122299377 Most Cited · 0 citations0.0/yr · PR 0.56PendingUS · Application
Manufacture Modeling And Monitoring

Methods, apparatus, and computer program products for analyzing, monitoring, and/or modeling the manufacture of a type of part by a manufacturing process. Non-destructive evaluation data and/or quality related data collected from manufactured parts of the type of part may be…