Patents
JP 2009103087 A#14285659 Most Cited · 7 citations0.4/yr · PR 2.84ActiveJP · Utility
Gas turbine and its rotor

<P>PROBLEM TO BE SOLVED: To provide a gas turbine rotor in which varying stress acting on bolts for combining rotor discs is restrained to ensure strength required for the rotor discs. <P>SOLUTION: In the gas turbine rotor 12, the rotor discs 22, 31 to 39, 41 to 43,…

JP 2009167905 A#16836377 Most Cited · 6 citations0.3/yr · PR 2.04ActiveJP · Utility
Gas turbine combustor outlet seal structure
Inventors: Nagai Tomohito, Kato Eigo, Sendo RintaroAssignee: Mitsubishi Heavy Ind LtdFiled 2008-01-16

<P>PROBLEM TO BE SOLVED: To provide a gas turbine combustor outlet seal structure improving a sealing property at an outlet of a gas turbine combustor, reducing a leaked air amount, vibrations of an outer peripheral sealing member, and a frequency of changing parts, and…

JP 2010112316 A#30971983 Most Cited · 3 citations0.2/yr · PR 1.18ActiveJP · Utility
Rotor for gas turbine, and gas turbine

<P>PROBLEM TO BE SOLVED: To increase reliability by reducing stress applied to a fastening bolt, in a rotor for a gas turbine and the gas turbine. <P>SOLUTION: This rotor for the gas turbine is so configured that a plurality of rotor disks 32 is axially arranged, and…

JP 2015075460 A#31570634 Most Cited · 3 citations0.3/yr · PR 1.15ActiveJP · Utility
Detection device and detection method of state quantity
Inventors: Yamazaki Tomohito, Sendo RintaroAssignee: Mitsubishi Heavy Ind LtdFiled 2013-10-11

PROBLEM TO BE SOLVED: To provide a state quantity detection device that detects a state quantity of an inspected object by arranging a sensor inside the inspected object with an increased pressing force of the sensor to fix the sensor firmly onto the inspected object.SOLUTION: A…

JP 2015161222 A#28593879 Most Cited · 3 citations0.3/yr · PR 1.47ActiveJP · Utility
Clearance adjuster and turbine device

PROBLEM TO BE SOLVED: To provide a clearance adjuster capable of securing a sufficient clearance while suppressing power consumption.SOLUTION: A clearance adjuster 80 comprises: an electromagnet 81 moving a split ring 20 from an initial position to a separate position located…

JP 2011127536 A#40381583 Most Cited · 2 citations0.1/yr · PR 1.00ActiveJP · Utility
Diesel engine
Inventors: Sendo Rintaro, Kinoshita YoshihikoAssignee: Mitsubishi Heavy Ind LtdFiled 2009-12-18

<P>PROBLEM TO BE SOLVED: To provide a diesel engine including a frame capable of bearing an increase in a side thrust pressure load without increasing the thickness of a side plate. <P>SOLUTION: This diesel engine 22 includes a base plate part for storing a…

JP 2011169329 A#59441466 Most Cited · 1 citations0.1/yr · PR 0.77ActiveJP · Utility
Gas turbine including seal structure
Inventors: Uemi Takuya, Sendo RintaroAssignee: Mitsubishi Heavy Ind LtdFiled 2011-04-27

<P>PROBLEM TO BE SOLVED: To provide a seal structure preventing the relative movement of seal plates in grooved parts and reducing the breakage of the seal plates due to wear while allowing the replacement of the seal plates at a site. <P>SOLUTION: This gas turbine…

JP 2015161221 A#62591538 Most Cited · 0 citations0.0/yr · PR 0.56ActiveJP · Utility
Clearance adjuster and turbine device

PROBLEM TO BE SOLVED: To provide a clearance adjuster capable of efficiently adjusting a clearance and improving turbine performance.SOLUTION: A clearance adjuster 80 radially moves a split ring 20 arranged on a tip end of each turbine blade 8b via a clearance C in a casing of a…

JP 2016089705 A#80731223 Most Cited · 0 citations0.0/yr · PR 0.56ActiveJP · Utility
Reinforcing member, partition wall unit, engine frame and crosshead type internal combustion engine
Inventors: Sendo Rintaro, Iima SatoshiAssignee: Mitsubishi Heavy Ind LtdFiled 2014-11-04

PROBLEM TO BE SOLVED: To reduce a stress generated at a connecting part of a reinforcing member at a guide plate in the reinforcing member, a partition wall unit, an engine frame and a crosshead type internal combustion engine.SOLUTION: There is provided a horizontal rib 61 of…

JP 2017110494 A#126736099 Most Cited · 0 citations0.0/yr · PR 0.56ActiveJP · Utility
Structure support structure and gas turbine facility

PROBLEM TO BE SOLVED: To provide a structure support structure that can inhibit heat from inputting to a floor face from a structure, and to provide a gas turbine facility.SOLUTION: The structure support structure for fixing a foundation steel material 20 provided in a lower…

JP 2017120034 A#76484831 Most Cited · 0 citations0.0/yr · PR 0.56ActiveJP · Utility
Duct and gas turbine facility

PROBLEM TO BE SOLVED: To provide a duct which reduces heat stress locally caused at a duct body by a high temperature fluid rapidly passing therethrough to prevent damage of the duct body, and to provide a gas turbine facility including the duct.SOLUTION: A duct includes: a duct…

JP 2017137798 A#75746424 Most Cited · 0 citations0.0/yr · PR 0.56ActiveJP · Utility
Cooling system and nuclear power plant

PROBLEM TO BE SOLVED: To curb an increase in a temperature of foundation concrete with high temperature equipment installed thereon.SOLUTION: A cooling system comprises: a storage section 55 which stores a gas turbine 53 and a generator 54 driven by the gas turbine 53; a…

JP 2017150449 A#115945848 Most Cited · 0 citations0.0/yr · PR 0.56ActiveJP · Utility
Exhaust gas muffler, gas turbine facility, and nuclear plant

PROBLEM TO BE SOLVED: To suppress generation of heat stress between an external structure and an internal structure in an exhaust gas muffler including the external structure and the internal structure.SOLUTION: The exhaust gas muffler 1 includes: the cylindrical external…