A method for filling a terrain using bulk material, preferably excavating material from an ore mine. The method includes a) the terrain has at least three levels disposed parallel to each other; b) a conveyor system ( 1 ) by which the bulk material is conveyed is positioned on…
Inventor / Author Profile
Schroeder Delev
1Total Forward Citations
1Indexed Patents
1Patent H-Index