Forecast delays (E(Vnk)) are found for track-bound vehicles (Fn) on the basis of predetermined routes and sections. A gradient descent process is used to minimise a target function (Γ) which quantifies the various aspects of causes of delay or aspects leading to the need to…
Schief Andreas
The method is for the control of pump stations and pumps in a pipeline and involves the total energy consumption of all pumps minimised at a predetermined total flow and height. The pipeline has a pump station PS1 with one pump (1), a pump station (PS2) with three pumps (2,3,4)…
Temporal control of an installation of an integrated metallurgical plant, with processes which are critical with respect to a continuous material flow. Control of the material flow through the installation is exerted in such a way that its stoppage or interruption before entry…
The method and arrangement for designing a technical installation with two work stations and an interposed storage facility involves determination of a cost function, calculation of the variables of the cost function by means of a predetermined algorithm (with auxiliary…
A method for controlling track-bound vehicles in which prescribed route networks and route for track-bound vehicles (F n ) are used to determine forecast delays E(V k n ) for the vehicles (F n ), a destination function (ψ) which quantifies the various aspects of causes of delay…
In a method for determination of an acquisition sequence for acquisition of slice plane data of slice planes of an examination subject in an imaging method for generation of slice images (associated with the slice planes) of the examination subject, the slice plane data are…
A process and a device for comprehensive control of a basic industry plant, such as a steel plant or an integrated iron works, which includes subprocesses that are critical with regard to continuous material flow, e.g., casting processes. The invention optimizes the material…
In a method for determination of an acquisition sequence for slice plane data of slice planes of an examination subject, the slice plane data are acquired with measurement sequences that each includes a preparation phase and a measurement phase temporally separated from the…
Forecast delays (E(Vnk)) are found for track-bound vehicles (Fn) on the basis of predetermined routes and sections. A gradient descent process is used to minimise a target function (Γ) which quantifies the various aspects of causes of delay or aspects leading to the need to…
The method is for the control of pump stations and pumps in a pipeline and involves the total energy consumption of all pumps minimised at a predetermined total flow and height. The pipeline has a pump station PS1 with one pump (1), a pump station (PS2) with three pumps (2,3,4)…
Die Erfindung betrifft ein System und ein Verfahren sowie ein zugehöriges Computerprogramm(produkt) ein System zur Optimierung einer Anordnung von aus wenigstens einem Gebilde gebildeten Objekten zur Nutzung derselben zur Gestaltung einer technischen Anlage. Das System weist…
Forecast delays (E(Vnk)) are found for track-bound vehicles (Fn) on the basis of predetermined routes and sections. A gradient descent process is used to minimise a target function (Γ) which quantifies the various aspects of causes of delay or aspects leading to the need to…
Zum Betreiben einer Fertigungsanlage (1) aufweisend eine Vielzahl von ersten Fertigungsstationen (3), die jeweils zur automatischen Durchführung einer Fertigungsaufgabe gemäß einer ersten Aufgabenklasse eingerichtet sind, wird eine Vielzahl von Aufträgen vorgegeben, wobei jeder…
A system, method, and an associated computer program (product) for optimizing an arrangement of objects formed from at least one structure in order to use objects to design a technical installation is provided. The system has: a selection device for selecting objects that are…
The aim of the invention is to operate a manufacturing system (1) having a plurality of first manufacturing stations (3), each of which is designed to automatically carry out a manufacturing job according to a first job class. This is achieved in that a plurality of jobs are…