Patents
WO 9,709,217 A2#7336913 Most Cited · 13 citations0.5/yr · PR 3.43PendingWO · Application
Control process for track-bound vehicles

Forecast delays (E(Vnk)) are found for track-bound vehicles (Fn) on the basis of predetermined routes and sections. A gradient descent process is used to minimise a target function (Γ) which quantifies the various aspects of causes of delay or aspects leading to the need to…

DE 102004041661 A1#9080270 Most Cited · 11 citations0.6/yr · PR 2.69PendingDE · Application
Pump stations and pumps control method in pipeline, involves total energy consumption of all pumps minimised at predetermined total flow and height

The method is for the control of pump stations and pumps in a pipeline and involves the total energy consumption of all pumps minimised at a predetermined total flow and height. The pipeline has a pump station PS1 with one pump (1), a pump station (PS2) with three pumps (2,3,4)…

DE 19,623,671 A1#8769413 Most Cited · 11 citations0.4/yr · PR 6.06PendingDE · Application
Temporal control of an installation of the basic materials industry

Temporal control of an installation of an integrated metallurgical plant, with processes which are critical with respect to a continuous material flow. Control of the material flow through the installation is exerted in such a way that its stoppage or interruption before entry…

DE 19,834,422 A1#9104360 Most Cited · 11 citations0.4/yr · PR 2.63PendingDE · Application
Design of a technical installation such as, e.g. a production plant or a metalworking plant involves calculation of the variables of a cost function by means of a predetermined algorithm
Inventors: Schoemig Ewald, Schief AndreasAssignee: Siemens AgFiled 1998-07-30

The method and arrangement for designing a technical installation with two work stations and an interposed storage facility involves determination of a cost function, calculation of the variables of the cost function by means of a predetermined algorithm (with auxiliary…

US 6,141,607 A#10055935 Most Cited · 10 citations0.4/yr · PR 2.70ExpiredUS · Utility
Control process for track-bound vehicles
Inventors: Hergert-mueckusch Ferdinand, Schief AndreasAssignee: Siemens AgFiled 1996-08-08 · Granted 2000-10-31

A method for controlling track-bound vehicles in which prescribed route networks and route for track-bound vehicles (F n ) are used to determine forecast delays E(V k n ) for the vehicles (F n ), a destination function (ψ) which quantifies the various aspects of causes of delay…

US 2008077008 A1#24977841 Most Cited · 4 citations0.2/yr · PR 1.35PendingUS · Application
Method to determine an acquisition sequence in an imaging method for generation of 2d slice images

In a method for determination of an acquisition sequence for acquisition of slice plane data of slice planes of an examination subject in an imaging method for generation of slice images (associated with the slice planes) of the examination subject, the slice plane data are…

US 6,029,097 A#29470937 Most Cited · 3 citations0.1/yr · PR 1.31ExpiredUS · Utility
Process and system for time control of a basic industry plant
Inventors: Branicky Michael, Buervenich Hans-peter, Hergert-mueckusch Ferd, Schief Andreas, Schoemig EwaldAssignee: Siemens AgFiled 1997-01-30 · Granted 2000-02-22

A process and a device for comprehensive control of a basic industry plant, such as a steel plant or an integrated iron works, which includes subprocesses that are critical with regard to continuous material flow, e.g., casting processes. The invention optimizes the material…

US 7,642,776 B2#41084878 Most Cited · 2 citations0.1/yr · PR 0.99ActiveUS · Utility
Method to determine an acquisition sequence in an imaging method for generation of 2D slice images
Inventors: Moll Christoph, Mueller Martin C, Schief AndreasAssignee: Siemens AgFiled 2007-09-27 · Granted 2010-01-05

In a method for determination of an acquisition sequence for slice plane data of slice planes of an examination subject, the slice plane data are acquired with measurement sequences that each includes a preparation phase and a measurement phase temporally separated from the…

WO 9,709,217 A3#48698828 Most Cited · 1 citations0.0/yr · PR 0.90ExpiredWO · Utility
Control process for track-bound vehicles

Forecast delays (E(Vnk)) are found for track-bound vehicles (Fn) on the basis of predetermined routes and sections. A gradient descent process is used to minimise a target function (Γ) which quantifies the various aspects of causes of delay or aspects leading to the need to…

DE 102004041661 B4#124279584 Most Cited · 0 citations0.0/yr · PR 0.56ExpiredDE · Utility
Pump stations and pumps control method in pipeline, involves total energy consumption of all pumps minimised at predetermined total flow and height
Inventors: Fige Peter, Johann Petra, Moll Christoph, Pirsing Andreas, Schief AndreasAssignee: Siemens AgFiled 2004-08-27 · Granted 2006-06-14

The method is for the control of pump stations and pumps in a pipeline and involves the total energy consumption of all pumps minimised at a predetermined total flow and height. The pipeline has a pump station PS1 with one pump (1), a pump station (PS2) with three pumps (2,3,4)…

DE 102015213302 A1#103661696 Most Cited · 0 citations0.0/yr · PR 0.56PendingDE · Application
System und Verfahren zur Optimierung einer Anordnung von aus wenigstens einem Gebilde gebildeten Objekten zur Nutzung derselben zur Gestaltung einer technischen Anlage

Die Erfindung betrifft ein System und ein Verfahren sowie ein zugehöriges Computerprogramm(produkt) ein System zur Optimierung einer Anordnung von aus wenigstens einem Gebilde gebildeten Objekten zur Nutzung derselben zur Gestaltung einer technischen Anlage. Das System weist…

EP 0,848,677 A2#87630908 Most Cited · 0 citations0.0/yr · PR 0.56PendingEP · Application
Control process for track-bound vehicles
Inventors: Hergert-mueckusch Ferdinand, Schief AndreasAssignee: Siemens AgFiled 1996-08-08

Forecast delays (E(Vnk)) are found for track-bound vehicles (Fn) on the basis of predetermined routes and sections. A gradient descent process is used to minimise a target function (Γ) which quantifies the various aspects of causes of delay or aspects leading to the need to…

EP 4,451,072 A1#133692784 Most Cited · 0 citations0.0/yr · PR 0.56PendingEP · Application
Method and data processing system for operating and simulating a production plant, and production plant

Zum Betreiben einer Fertigungsanlage (1) aufweisend eine Vielzahl von ersten Fertigungsstationen (3), die jeweils zur automatischen Durchführung einer Fertigungsaufgabe gemäß einer ersten Aufgabenklasse eingerichtet sind, wird eine Vielzahl von Aufträgen vorgegeben, wobei jeder…

US 2017017731 A1#121010735 Most Cited · 0 citations0.0/yr · PR 0.56PendingUS · Application
System and method for optimizing an arrangement of objects formed from at least one structure in order to use said objects to design a technical installation

A system, method, and an associated computer program (product) for optimizing an arrangement of objects formed from at least one structure in order to use objects to design a technical installation is provided. The system has: a selection device for selecting objects that are…

WO 2024/217815 A1#78937447 Most Cited · 0 citations0.0/yr · PR 0.56PendingWO · Application
Method and data processing system for operating and simulating a manufacturing system, and manufacturing system

The aim of the invention is to operate a manufacturing system (1) having a plurality of first manufacturing stations (3), each of which is designed to automatically carry out a manufacturing job according to a first job class. This is achieved in that a plurality of jobs are…