PROBLEM TO BE SOLVED: To provide a cable work apparatus capable of laying or removing an electric wire cable and the like without any trouble, and also an extra guiding sheave used on a road, even if a capstan winch on a cable work vehicle is far from a manhole on the…
sakoi
PROBLEM TO BE SOLVED: To exactly control a degree of settling of a case body by storing excavated sand and the like or water in a load chamber and adjusting settling force of the case body. SOLUTION: Excavated sand and the like or water is stored in a load chamber 112 composed…
PROBLEM TO BE SOLVED: To improve soil and sand discharging efficiency without the excavated soil and sand to get in contact with a excavating wheel again. SOLUTION: At an outer circumferential part of an excavating wheel 48, plural excavating parts 100 are formed at an interval…
PROBLEM TO BE SOLVED: To perform precisely as well as easily pressure velocity control and positioning control in a press, a rolling field and the like. SOLUTION: A hydraulic pump 6 is drivingly controlled in a manner to be variable in a number of revolutions by a driving motor…
PROBLEM TO BE SOLVED: To provide a compact repellent device, by using only a supersonic band as a repellent effect band, without using a low frequency.SOLUTION: Supersonic of a frequency band included in a band of 20 KHz-300 KHz is transmitted in water, and a continuous…
PURPOSE:To work efficiently either on a soft or hard stratum by setting a slide drum for supporting a cutter head rotatably, slidably in the axial direction, on the front end opening section of a shield main-body. CONSTITUTION:The font end opening section 10 of a shield…
PURPOSE:To stop a drilling machine from retreating so as to enable smooth drilling by fixing a segment by means of a lock bolt to the inner face of a pit wall behind the drilling machine, and also interposing a spacer member between the segment and a drilling propulsion jack.…
PURPOSE:To smoothly drill the periphery of an existing tunnel for the expansion or the like of the cross section thereof, using a rotary mechanical cutter and according to a sealed shield driving method. CONSTITUTION:This shield machine has a rotary cutter 10 laid so as to…
PURPOSE: To efficiently carry out excavated debris from the foremost end section without leaving it when the whole cross section of a large-diameter steep inclined shaft is excavated downward. CONSTITUTION: Multiple debris recovering buckets 8 for collecting excavated debris are…
A warmth calculation apparatus capable of indicating warmth during a transition is provided. This warmth calculation apparatus includes: a calculator that, on the basis of a human body heat model simulating a human body, calculates a basic index indicating the warm sensation of…
<P>PROBLEM TO BE SOLVED: To provide a explosion-proof operation box, having a switch capable of cutting-off a circuit in case of emergency, and making its shape uncomplicated. <P>SOLUTION: A switch part 9, a stopping mechanism 31 having a stop lever 10, and a…
<P>PROBLEM TO BE SOLVED: To provide an image forming system allowing efficient retrieval of an image forming apparatus. <P>SOLUTION: The image forming system includes at least: one or more information processors (clients PC1-PC4); a plurality of image forming…
<P>PROBLEM TO BE SOLVED: To provide an image forming system and an image forming program for easily selecting an image forming apparatus suitable for a user. <P>SOLUTION: The image forming apparatus includes at least: one or more information processing apparatuses…
PURPOSE:To prevent the damage of a cutter head by measuring the quantity of deformation in the reverse direction of propulsion of the central section of the cutter head at the time of the excavation operation of a tunnel and controlling propulsion by a shield jack on the basis…
PURPOSE:To prevent the destruction of a pit wall due to a cutting pressure and shorten the construction period in excavation by installing a shield plate, etc., under a cutter head for excavation and commonly using an excavating machine in the excavation of a pilot pit and a…
PURPOSE: To excavate a tunnel having a rectangular coss section having few irregularities. CONSTITUTION: A plurality of main cutter heads 1A, 1B are displaced in the axial direction at fixed distances, where the main cutter heads 1A, 1B do not interfere mutually, and a plurality…
PROBLEM TO BE SOLVED: To solve a problem of being unable to excavate in the intersecting direction of an axis from a narrow place such as the inside of an adit limited in the size of working space because of a conventional tunnel excavator being long in the whole machine length.…
(57)【要約】本公報は電子出願前の出願データであるた め要約のデータは記録されません。
A tunnel boring machine having an improved muck transportation means. The muck is discharged from the boring machine by means of a jet pump (28). The jet pump (28) has an outlet communicating with the atmospheric tank (38), while the outlet of the tank (38) is connected to a…
PROBLEM TO BE SOLVED: To provide a color printer system and a banding method in a color printer system whereby necessary memory resources can be reduced, the number of times of memory accessing can be reduced, and a processing time can be shortened by handling bands separately…
<P>PROBLEM TO BE SOLVED: To provide a device control system and a device controller capable of properly and easily restricting particular operations of a device. <P>SOLUTION: In a printer control system 11, if the current time is in a time zone during which color…
<P>PROBLEM TO BE SOLVED: To provide an image forming system for efficiently introducing an image forming apparatus. <P>SOLUTION: The image forming system includes at least: an acquisition means (information acquisition part 203) for, when an image forming apparatus…
<P>PROBLEM TO BE SOLVED: To provide an image processing system for improving convenience related with the selection and setting of an image processor. <P>SOLUTION: This image processing system includes: a plurality of image processors connected to an information…