A method of connecting a first threaded tubular to a second threaded tubular includes engaging the threads of the tubulars and rotating the first tubular relative to the second tubular to makeup a threaded connection. The method further includes, during makeup of the threaded…
Sachtleben Benjamin
Methods and systems for connecting threaded tubulars are presented. One example method generally includes monitoring relative rotation between a backup tong and a tubular clamped in the backup tong to determine slippage of the backup tong.
A method of connecting a first threaded tubular to a second threaded tubular includes engaging the threads of the tubulars and rotating the first tubular relative to the second tubular to makeup a threaded connection. The method further includes, during makeup of the threaded…
A method of making-up tubular string components can include inputting to an image processor image data output from at least one camera, the image processor in response detecting positions of a tubular and a mark on another tubular, threading the tubulars with each other while…
A method of connecting a first threaded tubular to a second threaded tubular includes engaging the threads of the tubulars and rotating the first tubular relative to the second tubular to makeup a threaded connection. The method further includes, during makeup of the threaded…
A method of connecting a first threaded tubular to a second threaded tubular includes engaging the threads of the tubulars and rotating the first tubular relative to the second tubular to makeup a threaded connection. The method further includes, during makeup of the threaded…
A method of connecting a first threaded tubular to a second threaded tubular includes engaging the threads of the tubulars and rotating the first tubular relative to the second tubular to makeup a threaded connection. The method further includes, during makeup of the threaded…
A method of making-up or breaking-out tubular string components can include threading tubulars with each other while a camera obtains images of the tubulars, outputting image data from the camera to an image processor that detects optical flow vector fields from the image data,…
A method of making-up a threaded connection can include rotating a tubular, measuring torque applied to the tubular during the rotating, thereby generating data including measured torque values, detecting an anomalous occurrence in the data during the rotating, and ceasing…
A method of connecting a first threaded tubular to a second threaded tubular includes engaging the threads of the tubulars and rotating the first tubular relative to the second tubular to makeup a threaded connection. The method further includes, during makeup of the threaded…
Methods and systems for connecting threaded tubulars are presented. One example method generally includes engaging threads of the tubulars; engaging the first tubular with a clamp of a makeup tool; rotating the clamp of the makeup tool, thereby rotating the first tubular…
A method of making-up tubular string components can include inputting to an image processor image data output from at least one camera, the image processor in response detecting positions of a tubular and a mark on another tubular, threading the tubulars with each other while…
Methods and systems for connecting threaded tubulars are presented. One example method generally includes monitoring relative rotation between a backup tong and a tubular clamped in the backup tong to determine slippage of the backup tong.
A method of connecting a first threaded tubular to a second threaded tubular includes engaging the threads of the tubulars and rotating the first tubular relative to the second tubular to makeup a threaded connection. The method further includes, during makeup of the threaded…
A method of connecting a first threaded tubular to a second threaded tubular includes engaging the threads of the tubulars and rotating the first tubular relative to the second tubular to makeup a threaded connection. The method further includes, during makeup of the threaded…
Methods and systems for connecting threaded tubulars are presented. One example method generally includes monitoring relative rotation between a backup tong and a tubular clamped in the backup tong to determine slippage of the backup tong.
A method of connecting a first threaded tubular to a second threaded tubular includes engaging the threads of the tubulars and rotating the first tubular relative to the second tubular to makeup a threaded connection. The method further includes, during makeup of the threaded…
A method of connecting a first threaded tubular to a second threaded tubular includes engaging the threads of the tubulars and rotating the first tubular relative to the second tubular to makeup a threaded connection. The method further includes, during makeup of the threaded…
A method of making-up or breaking-out tubular string components can include threading tubulars with each other while a camera obtains images of the tubulars, outputting image data from the camera to an image processor that detects optical flow vector fields from the image data,…
A method of making-up tubular string components can include inputting to an image processor image data output from at least one camera (28), the image processor in response detecting positions of a tubular (14) and a mark (30) on another tubular (20), threading the tubulars with…
A method and system are provided to evaluate acceptable or unacceptable connections during tubular makeup. A first threaded tubular is connected to a second threaded tubular by engaging the threads of the tubulars, and rotating the first tubular relative to the second tubular.…
A method and system are provided to evaluate acceptable or unacceptable connections during tubular makeup. A first threaded tubular is connected to a second threaded tubular by engaging the threads of the tubulars, and rotating the first tubular relative to the second tubular.…
A method (80) of making-up a threaded connection can include rotating a tubular (12), measuring torque (44) applied to the tubular during the rotating, thereby generating data (82) including measured torque values, detecting (84) an anomalous occurrence (70) in the data during…
A method for use with a subterranean well can include positioning an x-ray unit so that x-rays emitted by the x-ray unit scan a tubular string, displacing the tubular string relative to the x-ray unit, and identifying a threaded connection in the tubular string. A system can…
A method of controlling make-up of a threaded connection can include training an artificial intelligence, inputting data to the artificial intelligence during the threaded connection make-up, the artificial intelligence thereby determining a shoulder point during the threaded…