PROBLEM TO BE SOLVED: To decrease the area required for assembling a crane in a site of construction by folding a luffing jib along the main boom under the main boom. SOLUTION: A lufing jib 18 is folded under a boom 16 in a folding position to be placed on the ground. The…
Robert J Walker
<P>PROBLEM TO BE SOLVED: To provide a crane in which the number of parts that must be removed when disassembled for transportation is reduced and a method of automatically assembling the crane. <P>SOLUTION: The boom hoist cylinder crane (10) in which an upper work…
PROBLEM TO BE SOLVED: To easily add supplementarily an insert boom to a boom under assembling both in a condition laid horizontally and in a vertical condition suspended. SOLUTION: An insert boom is provided with the first end part and the second end part, and a male type…
<P>PROBLEM TO BE SOLVED: To provide a crane reduced in the number of parts required for removal in disassembling for transport, and its automatic assembling method. <P>SOLUTION: The boom hoist cylinder crane (10) is formed by rotatably installing upper works (12) on…
método de conectar primeira e segunda seções juntas de uma montagem de suspensão de guindaste, método de mover um conector e combinação de conjunto de suspensão para um guindaste e conjunto de guincho montado em estrutura. a presente invenção refere-se a um método de conectar…
A connector for a column segment, such as a boom segment, of a crane includes n extensions, where n is a positive integer. Each extension has a first base and an aperture extends through the extension from a first side to a second side. The first connector also includes at least…
<P>PROBLEM TO BE SOLVED: To provide a crane having a reduced number of components which is required to be removed during disassembly for transportation, and to provide its automatic assembling method. <P>SOLUTION: The boom hoist cylinder crane 10 consists of an upper…