A new combination of means and method steps is used in a method of constructing long tunnels with a lining, wherein excavation is effected with a tunnel boring machine (1) with a yielding shield mantle (4), building is effected continuously under the protection of the shield…
Pfeil Helmut
In a method of making long tunnels using tubbing as lining, a novel combination of means and steps of the method is used, in which the tunnel is excavated with a tunnel-boring machine (1) with yielding shield casing (4) and is lined continuously in the protection of the shield…
In a method of making long tunnels using tubbing as lining, a novel combination of means and steps of the method is used, in which the tunnel is excavated with a tunnel-boring machine (1) with yielding shield casing (4) and is lined continuously in the protection of the shield…
In a method of making long tunnels using tubbing as lining, a novel combination of means and steps of the method is used, in which the tunnel is excavated with a tunnel-boring machine (1) with yielding shield casing (4) and is lined continuously in the protection of the shield…
PURPOSE: To construct a long tunnel at high excavation speed and operational safety by absorbing a bedrock deformation that follows excavation with a shield mantle and tubbing ring component. CONSTITUTION: Excavation is performed with a tunnel boring machine, with an elastic…