PURPOSE: An arch precast concrete segment structure and a tunnel construction method using the same are provided to correspond to shear force moment and tensile force. CONSTITUTION: An arch precast concrete segment structure comprises a first segment(110), a second segment(130),…
Inventor / Author Profile
Park E Tae
21Total Forward Citations
4Indexed Patents
2Patent H-Index
PURPOSE: A messer shield excavator using divided messer plates and an underground tunnel excavation method thereby are provided to reduce the construction period by adjusting the gap between supports and connecting messer plates in the straight tunnel range. CONSTITUTION: A…
PURPOSE: A method for lining an underground vertical structure using a ring segment connection method with T-bolts is provided to prevent a bolt and a nut from being corroded and to improve tensile strength. CONSTITUTION: A method for lining an underground vertical structure…
본 발명은 유압잭을 갖춘 플레이트와 이를 이용한 굴착공법에 관한 것으로, 이는 소정의 길이를 갖고서, 선단은 뾰족한 지중굴착용 플레이트(21)에서, 그 밑면에 부착된 적어도 한쌍의 앵글(22) 사이에 유압실린더로 이루어진 유압잭(31)이 고정설치되어 있어서, 자동화 및 동시추진이 이루어져 공기단축과 비용절감을 도모할 수 있게 된다.