Disclosed are a method and apparatus for laying down, abandoning and/or recovering a pipe on the sea floor. During lay-down and abandonment, the pipe is lowered by a high capacity winch to an intermediate depth, at which the loading exerted by the pipe has dropped to within the…
Olson Mark K
Disclosed are a method and apparatus for laying down, abandoning and/or recovering a pipe (15) on the sea floor. During lay-down and abandonment, the pipe (15) is lowered by a high capacity winch (3) to an intermediate depth, at which the loading exerted by the pipe has dropped…
Disclosed are a method and apparatus for laying down, abandoning and/or recovering a pipe on the sea floor. During lay-down and abandonment, the pipe is lowered by a high capacity winch to an intermediate depth, at which the loading exerted by the pipe has dropped to within the…
Apparatus and Method for Laying Down, Abandoning and Recovering a Pipe on the Sea Floor Disclosed are a method and apparatus for laying down, abandoning and/or recovering a pipe (15) on the sea floor. During lay-down and abandonment, the pipe (15) is lowered by a high capacity…
Det beskrives en fremgangsmåte og anordning for legging, forlating og/eller innhenting av et rør (15) på havbunnen. Under nedlegging og forlating blir røret (15) senket ved hjelp av en høykapasitetsvinsj (3) til et mellomdyp, hvor lasten som utøves av røret har sunket til…