A crane apparatus and method are described for lifting a heavy load such as a wind-turbine generator unit 46 on to a wind-turbine tower 1 . The crane is designed to climb up cables 3 attached to the top of the tower, carrying with it the cables 45 and lifting gear 31 which will…
Meyer Max Ernst
An apparatus and method are proposed for incremental casting of concrete cantilever bridge sections. The main trusses which form the load-bearing frames of the apparatus are angularly splayed so that they are positioned outwards of the main load bearing webs of the…
A crane apparatus and method are described for lifting a heavy load such as a wind-turbine generator unit 46 on to a wind-turbine tower 1. The crane is designed to climb up cables 3 attached to the top of the tower, carrying with it the cables 45 and lifting gear 31 which will…
A crane apparatus and method are described for lifting a heavy load such as a wind-turbine generator unit 46 on to a wind-turbine tower 1 . The crane is designed to climb up cables 3 attached to the top of the tower, carrying with it the cables 45 and lifting gear 31 which will…
A crane apparatus and method are described for lifting a heavy load such as a wind-turbine generator unit 46 on to a wind-turbine tower 1. The crane is designed to climb up cables 3 attached to the top of the tower, carrying with it the cables 45 and lifting gear 31 which will…
풍력 터빈의 발전기 유니트(46)와 같은 고중량 중량물을 풍력 터빈 타워(1) 상으로 승강시키기 위한 크레인 장치 및 방법이 설명된다. 상기 크레인은 상기 타워의 상부에 부착된 케이블(3)들을 따라 상승되도록 설계되고, 상기 크레인에는 주된 승강 작업에 필요한 승강 기어(31) 및 케이블(45)들이 구비된다. 상기 크레인은 한 쌍의 집-프레임(20)들 및 붐 아암들(26, 27)을 포함하는데, 상기 붐 아암들은 승강 동안에는 위축되되, 상기 크레인이 타워(1)의 상부에 장착된 다음에 피봇가능한…
A crane apparatus and method are described for lifting a heavy load such as a wind-turbine generator unit 46 on to a wind-turbine tower 1. The crane is designed to climb up cables 3 attached to the top of the tower, carrying with it the cables 45 and lifting gear 31 which will…
A crane apparatus and method are described for lifting a heavy load such as a wind-turbine generator unit 46 on to a wind-turbine tower 1. The crane is designed to climb up cables 3 attached to the top of the tower, carrying with it the cables 45 and lifting gear 31 which will…