A hollow column (10) having a wall surrounding an inner space is erected. Pre-stressing cables (15) comprising tendons (1) and two cable terminations (20) are pre-assembled. Each tendon is contained in a respective jacket with a protective substance. Each cable termination…
Melen Benoit
In the method of building a hybrid tower, a metal mast is erected and connected to a foundation and a concrete structure having a plurality of superimposed concrete segments is built around the metal mast by using the metal mast as a support. Afterwards, the metal mast is…
A hollow column having a wall surrounding an inner space is erected. Pre-stressing cables comprising tendons and two cable terminations are pre-assembled. Each tendon is contained in a respective jacket with a protective substance. Each cable termination comprises a block for…
In order to handle a wind turbine blade between the ground and a rotor of an electric generator mounted on a nacelle ( 15 ) at the top of a tower ( 10 ), the blade ( 25 ) is retained in a support ( 40 ) that is mounted on a trolley ( 30 ) arranged against the tower. The trolley…
In the method of building a hybrid tower, a metal mast is erected and connected to a foundation and a concrete structure having a plurality of superimposed concrete segments is built around the metal mast by using the metal mast as a support. Afterwards, the metal mast is…
A hollow column (10) with a wall surrounding an upright interior space. The pre-stressing cable (15) comprises a tendon (1) and two pre-assembled cable terminations (20). Each tendon is contained in a respective jacket (4) with a shield (3). Each cable termination comprises a…
The invention relates to a method for erecting a structure 0 comprising at least two prefabricated concrete elements 1, 2, the method comprising: installing a first concrete element 1; placing a second concrete element 2 with at least one spacer 4 maintaining a gap between…
The process involves prefabricating a self-supporting mono-block structure near the embankment. An existing lane is interrupted and the embankment is eliminated to set the structure in service, to create a space to receive the structure that is displaced horizontally and…
The invention has for object a system for assembling a tower for a wind generator consisting of a plurality of blocks, comprising: a structure for lifting each one of said blocks, and a structure for supporting said lifting structure, the lifting structure being moveable in…
Circumferential segment of a concrete ring for forming a support mast A circumferential segment of a concrete ring for forming a mast comprising a plurality of superimposed concrete rings (6), said segment (8, 10) comprising a circumferential end (8 1 , 10 1 ) destined to…
The method involves prefabricating a structural work comprising a main structure (S1) with portal shape and installing a carrier (20) between lateral shells. An existing lane is interrupted, and a slope is eliminated to create a space for receiving the prefabricated work. The…
본 발명에 따른 하이브리드 타워 건설방법으로, 금속 마스트(4)가 세워지고 기반(11)에 연결되며 지지물로서 금속 마스트를 이용해 상기 금속 마스트 주위로 콘크리트 구조물(3)이 건설된다. 그런 후, 금속 마스트는 기반으로부터 분리되고 콘크리트 구조물을 따라 금속 마스트를 텔레스코핑하고 가이드함으로써 들어올려진다. 마지막으로, 들어올려진 금속 마스트는 콘크리트 구조물에 연결된다.
The invention relates to a method of erecting a structure 0 comprising at least two prefabricated concrete elements 1, 2, the method comprising: • installing a first concrete element 1; • installing a second concrete element 2 with at least one spacer piece 4 maintaining a gap…
The invention relates to a system for assembling a tower (2) for a wind generator, consisting of a plurality of blocks (6), said system comprising: a structure (11) for lifting each of said blocks (6), and a structure (12) for supporting said lifting structure (11), the lifting…
The invention relates to a method for erecting a structure 0 comprising at least two prefabricated concrete elements 1, 2 , the method comprising: installing a first concrete element 1; placing a second concrete element 2 with at least one spacer 4 maintaining a gap between…
The invention relates to a method for manufacturing concrete construction blocks (6) for a wind-generator tower, made up of at least two consecutive blocks secured to one another by a contact surface of each of the two blocks, the manufacturing method comprising the following…
The invention relates to a method of erecting a structure 0 comprising at least two prefabricated concrete elements 1, 2, the method comprising: -installing a first concrete element 1; -installing a second concrete element 2 with at least one spacer piece 4 maintaining a gap…
In the method of building a hybrid tower, a metal mast (4) is erected and connected to a foundation (11) and a concrete structure (3) is built around the metal mast by using the metal mast as a support. Afterwards, the metal mast is disconnected from the foundation and lifted by…
The invention relates to a system for assembling a tower (2) for a wind generator, consisting of a plurality of blocks (6), said system comprising: a structure (11) for lifting each of said blocks (6), and a structure (12) for supporting said lifting structure (11), the lifting…
Installation (1) for the load-out into the water of a heavy load (10) located onshore,in particular a load constituted by a tripod- or tetrapod-type float, having:- at least two support structures (20) that are independent of one another and can be moved on the respective paths,…
The invention has for object a system for assembling a tower for a wind generator consisting of a plurality of blocks, comprising: a structure for lifting each one of said blocks, and a structure for supporting said lifting structure, the lifting structure being moveable in…
The invention has for object a method for manufacturing concrete construction blocks ( 6 ) for a wind-generator tower made up of at least two consecutive blocks secured to one another by a contact surface of each of the two blocks, the manufacturing method comprising the…