EP 2,339,094 A1#1923124 Most Cited · 33 citations2.2/yr · PR 6.21PendingEP · Application
Tower having a pre-stressed concrete column and construction method
Inventors: Huynh Tong Alain, Melen BenoitAssignee: Soletanche FreyssinetFiled 2009-12-23

A hollow column (10) having a wall surrounding an inner space is erected. Pre-stressing cables (15) comprising tendons (1) and two cable terminations (20) are pre-assembled. Each tendon is contained in a respective jacket with a protective substance. Each cable termination…

US 2011239584 A1#3270733 Most Cited · 24 citations1.6/yr · PR 3.06PendingUS · Application
Method of building a hybrid tower for a wind generator
Inventors: Tuong Alain Huynh, Melen BenoitAssignee: Soletanche FreyssinetFiled 2011-04-04

In the method of building a hybrid tower, a metal mast is erected and connected to a foundation and a concrete structure having a plurality of superimposed concrete segments is built around the metal mast by using the metal mast as a support. Afterwards, the metal mast is…

US 2012266552 A1#3294430 Most Cited · 24 citations1.7/yr · PR 2.58PendingUS · Application
Tower having a pre-stressed concrete column and construction method
Inventors: Huynh Tong Alain, Melen BenoitAssignee: Huynh Tong Alain, Melen BenoitFiled 2010-12-22

A hollow column having a wall surrounding an inner space is erected. Pre-stressing cables comprising tendons and two cable terminations are pre-assembled. Each tendon is contained in a respective jacket with a protective substance. Each cable termination comprises a block for…

US 2019257292 A1#7768430 Most Cited · 13 citations1.9/yr · PR 2.02PendingUS · Application
Method for handling a wind turbine blade
Inventors: Melen Benoit, Fabry Nicolas, Laurent EricAssignee: Soletanche FreyssinetFiled 2016-12-09

In order to handle a wind turbine blade between the ground and a rotor of an electric generator mounted on a nacelle ( 15 ) at the top of a tower ( 10 ), the blade ( 25 ) is retained in a support ( 40 ) that is mounted on a trolley ( 30 ) arranged against the tower. The trolley…

US 8,297,025 B2#8472016 Most Cited · 12 citations0.9/yr · PR 2.20ActiveUS · Utility
Method of building a hybrid tower for a wind generator
Inventors: Huynh Tuong Alain, Melen BenoitAssignee: Huynh Tuong Alain, Melen BenoitFiled 2011-04-04 · Granted 2012-10-30

In the method of building a hybrid tower, a metal mast is erected and connected to a foundation and a concrete structure having a plurality of superimposed concrete segments is built around the metal mast by using the metal mast as a support. Afterwards, the metal mast is…

CN 102,859,098 A#15556500 Most Cited · 7 citations0.5/yr · PR 1.64ActiveCN · Utility
Tower with prestressed concrete column and construction method thereof
Inventors: Huynh Tong Alain, Melen BenoitAssignee: Soletanche FreyssinetFiled 2010-12-22

A hollow column (10) with a wall surrounding an upright interior space. The pre-stressing cable (15) comprises a tendon (1) and two pre-assembled cable terminations (20). Each tendon is contained in a respective jacket (4) with a shield (3). Each cable termination comprises a…

US 2016160491 A1#15908427 Most Cited · 7 citations0.7/yr · PR 1.48PendingUS · Application
Method for erecting a structure made of prefabricated concrete elements and associated structure

The invention relates to a method for erecting a structure 0 comprising at least two prefabricated concrete elements 1, 2, the method comprising: installing a first concrete element 1; placing a second concrete element 2 with at least one spacer 4 maintaining a gap between…

FR 2,850,984 A1#16996250 Most Cited · 6 citations0.3/yr · PR 1.92PendingFR · Application
New traffic lane creating process for roadway or railway track, involves interrupting existing lane and eliminating embankment to displace pre-fabricated structure horizontally and vertically to bring structure in service position
Inventors: Souply Jean Yves, Melen Benoit, Simonin PierreAssignee: Quille EntrepriseFiled 2003-02-06

The process involves prefabricating a self-supporting mono-block structure near the embankment. An existing lane is interrupted and the embankment is eliminated to set the structure in service, to create a space to receive the structure that is displaced horizontally and…

US 2017241407 A1#17774939 Most Cited · 6 citations0.7/yr · PR 1.61PendingUS · Application
Assembly system and method for assembling a tower for a wind generator
Inventors: Joss Beat, FABRY Ncolas, Melen BenoÎtAssignee: Soletanche FreyssinetFiled 2014-05-19

The invention has for object a system for assembling a tower for a wind generator consisting of a plurality of blocks, comprising: a structure for lifting each one of said blocks, and a structure for supporting said lifting structure, the lifting structure being moveable in…

WO 2017/046624 A1#22042673 Most Cited · 5 citations0.6/yr · PR 1.27PendingWO · Application
Circumferential segment of a concrete ring for forming a support mast
Inventors: Melen BenoÎt, Fabry NicolasAssignee: Soletanche FreyssinetFiled 2015-09-17

Circumferential segment of a concrete ring for forming a support mast A circumferential segment of a concrete ring for forming a mast comprising a plurality of superimposed concrete rings (6), said segment (8, 10) comprising a circumferential end (8 1 , 10 1 ) destined to…

EP 1,596,010 A1#24407963 Most Cited · 4 citations0.2/yr · PR 1.43PendingEP · Application
Method, device and bridge structure for making an underpass
Inventors: Souply Jean-yves, Melen Benoit, Simonin PierreAssignee: Quille EntrepriseFiled 2004-05-13

The method involves prefabricating a structural work comprising a main structure (S1) with portal shape and installing a carrier (20) between lateral shells. An existing lane is interrupted, and a slope is eliminated to create a space for receiving the prefabricated work. The…

KR 20110112228 A#24889958 Most Cited · 4 citations0.3/yr · PR 1.37ActiveKR · Utility
Method of building a hybrid tower for a wind generator
Inventors: Huynh Tuong Alain, Melen BenoitAssignee: Soletanche FreyssinetFiled 2011-04-06

본 발명에 따른 하이브리드 타워 건설방법으로, 금속 마스트(4)가 세워지고 기반(11)에 연결되며 지지물로서 금속 마스트를 이용해 상기 금속 마스트 주위로 콘크리트 구조물(3)이 건설된다. 그런 후, 금속 마스트는 기반으로부터 분리되고 콘크리트 구조물을 따라 금속 마스트를 텔레스코핑하고 가이드함으로써 들어올려진다. 마지막으로, 들어올려진 금속 마스트는 콘크리트 구조물에 연결된다.

WO 2015/015103 A1#24040413 Most Cited · 4 citations0.4/yr · PR 1.50PendingWO · Application
Method for erecting a structure made of prefabricated concrete elements and associated structure

The invention relates to a method of erecting a structure 0 comprising at least two prefabricated concrete elements 1, 2, the method comprising: • installing a first concrete element 1; • installing a second concrete element 2 with at least one spacer piece 4 maintaining a gap…

CN 106,662,075 A#29595333 Most Cited · 3 citations0.3/yr · PR 1.29ActiveCN · Utility
Assembly system and method for assembling a tower for a wind generator
Inventors: Joss Beat, Fabry Nicolas, Melen BenoitAssignee: Soletanche FreyssinetFiled 2014-05-19

The invention relates to a system for assembling a tower (2) for a wind generator, consisting of a plurality of blocks (6), said system comprising: a structure (11) for lifting each of said blocks (6), and a structure (12) for supporting said lifting structure (11), the lifting…

US 9,951,513 B2#34118233 Most Cited · 3 citations0.4/yr · PR 0.94ActiveUS · Utility
Method for erecting a structure made of prefabricated concrete elements and associated structure
Inventors: Ladret Patrick, Buchin-roulie Vanessa, Melen BenoÎtAssignee: Soletanche FreyssinetFiled 2014-07-28 · Granted 2018-04-24

The invention relates to a method for erecting a structure 0 comprising at least two prefabricated concrete elements 1, 2 , the method comprising: installing a first concrete element 1; placing a second concrete element 2 with at least one spacer 4 maintaining a gap between…

WO 2016/066907 A1#31612670 Most Cited · 3 citations0.3/yr · PR 1.14PendingWO · Application
Method for manufacturing concrete construction blocks for a wind-turbine tower and associated system
Inventors: Fabry Nicolas, Melen Benoit, Mellier ErikAssignee: Soletanche FreyssinetFiled 2014-10-31

The invention relates to a method for manufacturing concrete construction blocks (6) for a wind-generator tower, made up of at least two consecutive blocks secured to one another by a contact surface of each of the two blocks, the manufacturing method comprising the following…

CN 105,612,297 A#38189440 Most Cited · 2 citations0.2/yr · PR 1.07ActiveCN · Utility
Method for erecting a structure made of prefabricated concrete elements and associated structure

The invention relates to a method of erecting a structure 0 comprising at least two prefabricated concrete elements 1, 2, the method comprising: -installing a first concrete element 1; -installing a second concrete element 2 with at least one spacer piece 4 maintaining a gap…

EP 2,374,966 A1#41303446 Most Cited · 2 citations0.1/yr · PR 0.98PendingEP · Application
Method of building a hybrid tower for a wind generator
Inventors: Huynh Tuong Alain, Melen BenoitAssignee: Soletanche FreyssinetFiled 2010-04-06

In the method of building a hybrid tower, a metal mast (4) is erected and connected to a foundation (11) and a concrete structure (3) is built around the metal mast by using the metal mast as a support. Afterwards, the metal mast is disconnected from the foundation and lifted by…

EP 3,146,131 A1#42803099 Most Cited · 2 citations0.2/yr · PR 0.95PendingEP · Application
Assembly system and method for assembling a tower for a wind generator
Inventors: Joss Beat, Fabry Nicolas, Melen BenoÎtAssignee: Soletanche FreyssinetFiled 2014-05-19

The invention relates to a system for assembling a tower (2) for a wind generator, consisting of a plurality of blocks (6), said system comprising: a structure (11) for lifting each of said blocks (6), and a structure (12) for supporting said lifting structure (11), the lifting…

EP 4,183,672 A1#42915972 Most Cited · 2 citations0.7/yr · PR 0.94PendingEP · Application
Installation for the load-out into the water of a heavy load
Inventors: Melen BenoitAssignee: Soletanche FreyssinetFiled 2022-11-10

Installation (1) for the load-out into the water of a heavy load (10) located onshore,in particular a load constituted by a tripod- or tetrapod-type float, having:- at least two support structures (20) that are independent of one another and can be moved on the respective paths,…

US 10,364,800 B2#40224672 Most Cited · 2 citations0.3/yr · PR 1.00ActiveUS · Utility
Assembly system and method for assembling a tower for a wind generator
Inventors: Joss Beat, Fabry Nicolas, Melen BenoÎtAssignee: Soletanche FreyssinetFiled 2014-05-19 · Granted 2019-07-30

The invention has for object a system for assembling a tower for a wind generator consisting of a plurality of blocks, comprising: a structure for lifting each one of said blocks, and a structure for supporting said lifting structure, the lifting structure being moveable in…

US 2017314284 A1#44964456 Most Cited · 2 citations0.2/yr · PR 0.88PendingUS · Application
Method for manufacturing concrete construction blocks for a wind-turbine tower and associated system
Inventors: Fabry Nicolas, Melen Benoit, Mellier ErikAssignee: Soletanche FreyssinetFiled 2014-10-31

The invention has for object a method for manufacturing concrete construction blocks ( 6 ) for a wind-generator tower made up of at least two consecutive blocks secured to one another by a contact surface of each of the two blocks, the manufacturing method comprising the…