Construction Activity Summary Generator with Integrated Solutions Engine
Inventors: Matt Man, Elijah El-Haddad, Gagik Hacobian, Julian Clayton, David BordenAssignee: Filed 2023-08-29

A computing platform is configured to: (i) train a large language model (LLM) by carrying out a first machine learning process on a first training data set that includes first construction-based data associated with one or more of a user, a plurality of reference construction…

US 12,493,856 B2#3373543 Most Cited · 0 citations0.0/yr · PR 0.00ActiveUS · Utility
Computing system and method for generating predictive heat maps for target status dimensions with data-driven recommendations
Inventors: Farid Mirahadi, Matt Man, Mohammad Mostafa Soltani, William GainesAssignee: Procore Technologies, Inc.Filed 2024-05-22 · Granted 2025-12-09

An example computing platform is configured to: determine, via a first machine-learning model, a relationship between a data asset associated with a construction project and a first location entity associated with the construction project; update the data asset to include an…

US 12,499,135 B2#3368576 Most Cited · 0 citations0.0/yr · PR 0.00ActiveUS · Utility
Computer systems and methods for identifying location entities and generating a location entity data taxonomy
Inventors: Azadeh Yazdan Panah Gohar Rizi, Matt Man, Taylor Wasser, Julian ClaytonAssignee: Procore Technologies, Inc.Filed 2022-09-30 · Granted 2025-12-16

An example computing platform is configured to: obtain a two-dimensional drawing of a portion of a construction project; perform an image processing analysis of the two-dimensional drawing to identify one or more location entities within the two-dimensional drawing; derive…

US 12,591,825 B2#3279999 Most Cited · 0 citations0.0/yr · PR 0.00ActiveUS · Utility
Computing system and method for progress tracking using a large language model

A computing platform is configured to (i) load source data comprising (a) a set of log entries of a construction project and (b) a schedule of the construction project, (ii) preprocess the source data, (iii) provide the preprocessed source data as input to a large-language model…

US 12,626,312 B2#3246358 Most Cited · 0 citations0.0/yr · PR 0.00ActiveUS · Utility
Construction project risk assessment and mitigation
Inventors: Matt Man, David Starr, Joshua Nguyen, Hesham Younes, Andrew DunnAssignee: Procore Technologies, Inc.Filed 2022-06-06 · Granted 2026-05-12

A computing platform is configured to (i) receive data objects related to a construction project, (ii) add the data objects to a construction knowledge graph as nodes that are connected to other nodes representing other data objects, (iii) determine, via a machine-learning model…

US 12,646,279 B2#3226727 Most Cited · 0 citations0.0/yr · PR 0.00ActiveUS · Utility
Verification of progression of construction-related activity at given location
Inventors: Mohammad Mostafa Soltani, Dan Park, Kevin McKee, Matt ManAssignee: Procore Technologies, Inc.Filed 2024-11-04 · Granted 2026-06-02

A computing platform is configured to: (i) receive, from a first client station, (a) data related to the first client station and (b) a first image associated with a target location; (ii) based on the received data related to the first client station, determine a location…

US 12,724,783 B2#3149063 Most Cited · 0 citations0.0/yr · PR 0.00ActiveUS · Utility
Artificial intelligence architecture for identifying relationships between data objects of different types within a construction management software application

An example computing platform is configured to: (i) receive an incoming request to identify relationships between data objects within a construction management software application; (ii) identify an AI agent to handle the incoming request; (iii) generate, via the AI agent, a…

US 2025/0086733 A1#2983657 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Computer Systems and Methods for Dynamic Pull Planning
Inventors: Julian Clayton, Navin Kaminoulu, Mohammad Mostafa Soltani, Matt ManAssignee: Filed 2024-09-16

Techniques for dynamic pull planning involve (i) determining an update to a master schedule for a construction project that comprises tasks having respective scheduled start dates, (ii) executing a machine learning model that has been trained with historical construction project…

US 2025/0117687 A1#2957468 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Automatic Content Generator for Construction-Based Data Objects

A computing platform is configured to: (i) train a machine-learning model by carrying out a machine learning process on a training data set that includes historical construction-based data objects, (ii) receive a request to generate a construction-based data object associated…

US 2025/0131350 A1#2945837 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Verification of Progression of Construction-Related Activity at Given Location
Inventors: Mohammad Mostafa Soltani, Dan Park, Kevin McKee, Matt ManAssignee: Filed 2024-11-04

A computing platform is configured to: (i) receive, from a first client station, (a) data related to the first client station and (b) a first image associated with a target location; (ii) based on the received data related to the first client station, determine a location…

US 2025/0148170 A1#2931366 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Systems and Methods for Automatic Generation of Building Elements Graph
Inventors: Matt Man, Mohammad Mostafa SoltaniAssignee: Filed 2023-11-03

A computing platform is configured to: (i) train a machine-learning model by carrying out a machine learning process on a training data set that includes that includes construction-based data objects including indications of a plurality of building elements and indications of…

US 2025/0285047 A1#2810272 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Computing System and Method for Progress Tracking Using a Large Language Model

A computing platform is configured to (i) load source data comprising (a) a set of log entries of a construction project and (b) a schedule of the construction project, (ii) preprocess the source data, (iii) provide the preprocessed source data as input to a large-language model…

US 2025/0356558 A1#2744308 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Computing Systems and Methods for Generating Media Content Using a Multi-Agent Architecture

A computing platform configured to perform functionality that involves (i) receiving an indication of a request for media content related to a given construction project, (ii) utilizing a planner agent to generate a sequence of tasks to be performed by other agents to generate…

US 2025/0363456 A1#2737813 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Computing System and Method for Generating Predictive Heat Maps for Target Status Dimensions with Data-Driven Recommendations
Inventors: Farid Mirahadi, Matt Man, Mohammad Mostafa Soltani, William GainesAssignee: Filed 2024-05-22

An example computing platform is configured to: determine, via a first machine-learning model, a relationship between a data asset associated with a construction project and a first location entity associated with the construction project; update the data asset to include an…

US 2026/0064440 A1#2648198 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Computing System And Method For Generating Personalized Versions Of GUI Views
Inventors: Aaron Kettl, Matt Man, Nicholas Tilden, Tim Doherty, Michael SinaiAssignee: Filed 2024-08-29

An example computing platform is configured to: (i) receive, from a client device associated with a given user, a request to access a given GUI view of a construction management software application; (ii) obtain a set of baseline GUI data for the given GUI view; (iii) obtain a…

US 2026/0073331 A1#2639640 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Computing System and Method for Automatically Generating Construction Activity Logs
Inventors: Farid Mirahadi, Matt Man, Mohammad Mostafa SoltaniAssignee: Filed 2024-09-06

A computing system is configured to: (i) generating a first prompt for input to a generative AI model, wherein the first prompt comprises input data and a request to determine a type of log to be generated, (ii) inputting the first prompt to the generative AI model, causing the…

US 2026/0133675 A1#2580877 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Computing System and Method for Generating Construction-Based Data Objects Utilizing a Unified User Interface
Inventors: Madison Williams, Matt ManAssignee: Filed 2024-11-14

A computing system is configured to: (i) cause a user to be presented with a unified user interface for creating data objects of multiple different types, (ii) cause the unified user interface to include a first set of input-control elements for a first set of data fields…

US 2026/0140955 A1#2573749 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Artificial Intelligence Architecture for Identifying Relationships Between Data Objects of Different Types Within a Construction Management Software Application

An example computing platform is configured to: (i) receive an incoming request to identify relationships between data objects within a construction management software application; (ii) identify an AI agent to handle the incoming request; (iii) generate, via the AI agent, a…

US 2026/0141324 A1#2573395 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Intelligent Linking of Submittal and Schedule Objects Within a Construction Management Software Application

A computing platform is configured to (i) receive a request to identify schedule-item data objects within a construction management software application that are related to a submittal data object, (ii) identify one or more schedule-item data objects related to the submittal…

US 2026/0161671 A1#2553339 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Computer Systems and Methods for Identifying Location Entities and Generating a Location Entity Data Taxonomy

An example computing platform is configured to: obtain a two-dimensional drawing of a portion of a construction project; perform an image processing analysis of the two-dimensional drawing to identify one or more location entities within the two-dimensional drawing; derive…

US 2026/0236886 A1#2478704 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Computing System and Method for Generating Predictive Heat Maps for Target Status Dimensions with Data-Driven Recommendations
Inventors: Farid Mirahadi, Matt Man, Mohammad Mostafa Soltani, William GainesAssignee: Filed 2025-12-05

An example computing platform is configured to: determine, via a first machine-learning model, a relationship between a data asset associated with a construction project and a first location entity associated with the construction project; update the data asset to include an…

US 2026/0360100 A1#2356868 Most Cited · 0 citations0.0/yr · PR 0.00PendingUS · Application
Verification of Progression of Construction-Related Activity at Given Location
Inventors: Mohammad Mostafa Soltani, Dan Park, Kevin McKee, Matt ManAssignee: Filed 2026-05-29

A computing platform is configured to: (i) receive, from a first client station, (a) data related to the first client station and (b) a first image associated with a target location; (ii) based on the received data related to the first client station, determine a location…