US 2006200795 A1#2577947 Most Cited · 28 citations1.4/yr · PR 3.13PendingUS · Application
Execution and real-time implementation of a temporary overrun scheduler
Inventors: Maclay DavidAssignee: Mathworks IncFiled 2005-03-01

The automatic generation of a real-time scheduler for scheduling the execution of tasks on a real-time system is disclosed. The scheduler may allow task overruns in the execution of the tasks on the real-time system. The task overruns may occur when the execution of a task for a…

US 9,952,837 B1#4936715 Most Cited · 18 citations2.2/yr · PR 2.96ActiveUS · Utility
Reusable component in a modeling environment
Inventors: Maclay David, Fielder Jonathan JAssignee: Mathworks IncFiled 2015-04-01 · Granted 2018-04-24

A system and method supports reusing model components or component artifacts in a first modeling environment where the model components or artifacts were created in a second environment. An interface to the model components or artifacts from the first modeling environment is…

US 2014089889 A1#7708288 Most Cited · 13 citations1.1/yr · PR 2.20PendingUS · Application
Behavior invariant optimization of maximum execution times for model simulation
Inventors: Maclay David, Urbas MatejAssignee: Mathworks IncFiled 2012-09-26

A device receives a model that includes model elements scheduled to execute in time slots on a hardware device. The device identifies time slots, of the time slots, that are unoccupied or underutilized by the model elements, and identifies a set of model elements that can be…

US 8,209,158 B1#7527648 Most Cited · 13 citations0.9/yr · PR 2.65ActiveUS · Utility
Processor-in-the-loop co-simulation of a model
Inventors: Fielder Jonathan, Maclay DavidAssignee: Fielder Jonathan, Maclay DavidFiled 2008-07-03 · Granted 2012-06-26

A model may be constructed and simulated using processor-in-the-loop co-simulation at a target device. In one implementation, a host environment may provide a graphical environment that facilitates construction of the model defined as a plurality of functional blocks. The host…

US 8,457,945 B1#10530497 Most Cited · 10 citations0.8/yr · PR 2.00ActiveUS · Utility
Processor-in-the-loop co-simulation of a model
Inventors: Fielder Jonathan, Maclay DavidAssignee: Fielder Jonathan, Maclay DavidFiled 2012-05-23 · Granted 2013-06-04

A model may be constructed and simulated using processor-in-the-loop co-simulation at a target device. In one implementation, a host environment may provide a graphical environment that facilitates construction of the model defined as a plurality of functional blocks. The host…

US 2004195040 A1#13666612 Most Cited · 8 citations0.4/yr · PR 1.67PendingUS · Application
Powerful sound for powerful engines

An air induction system includes a duct that defines a passage for airflow to the engine. The duct is substantially clear of obstructions to improve airflow that in turn provides improved engine performance. A speaker generates sounds to provide a desirable engine sound. A…

US 7,613,595 B2#15771659 Most Cited · 7 citations0.4/yr · PR 1.55ExpiredUS · Utility
Execution and real-time implementation of a temporary overrun scheduler
Inventors: Maclay DavidAssignee: Mathworks IncFiled 2005-03-01 · Granted 2009-11-03

The automatic generation of a real-time scheduler for scheduling the execution of tasks on a real-time system is disclosed. The scheduler may allow task overruns in the execution of the tasks on the real-time system. The task overruns may occur when the execution of a task for a…

US 2009013322 A1#18481292 Most Cited · 6 citations0.3/yr · PR 1.41PendingUS · Application
Execution and real-time implementation of a temporary overrun scheduler
Inventors: Maclay DavidAssignee: Maclay DavidFiled 2008-09-17

The automatic generation of a real-time scheduler for scheduling the execution of tasks on a real-time system is disclosed. The scheduler may allow task overruns in the execution of the tasks on the real-time system. The task overruns may occur when the execution of a task for a…

US 9,697,020 B2#16892454 Most Cited · 6 citations0.7/yr · PR 1.99ActiveUS · Utility
Execution and real-time implementation of a temporary overrun scheduler
Inventors: Maclay DavidAssignee: Mathworks IncFiled 2014-06-30 · Granted 2017-07-04

The automatic generation of a real-time scheduler for scheduling the execution of tasks on a real-time system is disclosed. The scheduler may allow task overruns in the execution of the tasks on the real-time system. The task overruns may occur when the execution of a task for a…

US 2014365992 A1#26368092 Most Cited · 4 citations0.3/yr · PR 1.21PendingUS · Application
Behavior invariant optimization of maximum execution times for model simulation
Inventors: Maclay David, Urbas MatejAssignee: Mathworks IncFiled 2014-08-25

A device receives a model that includes model elements scheduled to execute in time slots on a hardware device. The device identifies time slots, of the time slots, that are unoccupied or underutilized by the model elements, and identifies a set of model elements that can be…

WO 2006/094047 A2#23846549 Most Cited · 4 citations0.2/yr · PR 1.54PendingWO · Application
Execution and real-time implementation of a temporary overrun scheduler
Inventors: Maclay DavidAssignee: Mathworks Inc, Maclay DavidFiled 2006-03-01

The automatic generation of a real-time scheduler for scheduling the execution o tasks on a real-time system is disclosed. The scheduler may allow task overruns in the execution of the tasks on the real-time system. The task overruns may occur when the execution of a task for a…

US 2014309980 A1#61168823 Most Cited · 1 citations0.1/yr · PR 0.75PendingUS · Application
Execution and real-time implementation of a temporary overrun scheduler
Inventors: Maclay DavidAssignee: Mathworks IncFiled 2014-06-30

The automatic generation of a real-time scheduler for scheduling the execution of tasks on a real-time system is disclosed. The scheduler may allow task overruns in the execution of the tasks on the real-time system. The task overruns may occur when the execution of a task for a…

US 8,819,618 B2#61488900 Most Cited · 1 citations0.1/yr · PR 0.75ActiveUS · Utility
Behavior invariant optimization of maximum execution times for model simulation
Inventors: Maclay David, Urbas MatejAssignee: Mathworks IncFiled 2012-09-26 · Granted 2014-08-26

A device receives a model that includes model elements scheduled to execute in time slots on a hardware device. The device identifies time slots, of the time slots, that are unoccupied or underutilized by the model elements, and identifies a set of model elements that can be…

WO 2006/094047 A3#56034309 Most Cited · 1 citations0.1/yr · PR 0.80ActiveWO · Utility
Execution and real-time implementation of a temporary overrun scheduler
Inventors: Maclay DavidAssignee: Mathworks Inc, Maclay DavidFiled 2006-03-01

The automatic generation of a real-time scheduler for scheduling the execution o tasks on a real-time system is disclosed. The scheduler may allow task overruns in the execution of the tasks on the real-time system. The task overruns may occur when the execution of a task for a…

EP 1,859,349 A2#86175865 Most Cited · 0 citations0.0/yr · PR 0.56PendingEP · Application
Execution and real-time implementation of a temporary overrun scheduler
Inventors: Maclay DavidAssignee: Mathworks IncFiled 2006-03-01

The automatic generation of a real-time scheduler for scheduling the execution o tasks on a real-time system is disclosed. The scheduler may allow task overruns in the execution of the tasks on the real-time system. The task overruns may occur when the execution of a task for a…

EP 2,901,278 A1#121607810 Most Cited · 0 citations0.0/yr · PR 0.56PendingEP · Application
Behavior invariant optimization of maximum execution times for model simulation
Inventors: Maclay David, Urbas MatejAssignee: Mathworks IncFiled 2013-08-30

A device receives a model that includes model elements scheduled to execute in time slots on a hardware device. The device identifies time slots, of the time slots, that are unoccupied or underutilized by the model elements, and identifies a set of model elements that can be…

US 9,268,536 B2#135546532 Most Cited · 0 citations0.0/yr · PR 0.56ActiveUS · Utility
Behavior invariant optimization of maximum execution times for model simulation
Inventors: Maclay David, Urbas MatejAssignee: Mathworks IncFiled 2014-08-25 · Granted 2016-02-23

A device receives a model that includes model elements scheduled to execute in time slots on a hardware device. The device identifies time slots, of the time slots, that are unoccupied or underutilized by the model elements, and identifies a set of model elements that can be…

WO 2014/051932 A1#84979807 Most Cited · 0 citations0.0/yr · PR 0.56PendingWO · Application
Behavior invariant optimization of maximum execution times for model simulation
Inventors: Maclay David, Urbas MatejAssignee: Mathworks IncFiled 2013-08-30

A device receives a model that includes model elements scheduled to execute in time slots on a hardware device. The device identifies time slots, of the time slots, that are unoccupied or underutilized by the model elements, and identifies a set of model elements that can be…