The invention discloses a kind of concrete filling pile construction methods of hydraulic vibration hammer hidden pipe.The construction method is the following steps are included: 1) surveying setting-out;2) casing is sunk to;3) rotary drilling device drills;4) steel…
Inventor / Author Profile
Lyu Dawei
0Total Forward Citations
2Indexed Patents
0Patent H-Index
Frequent Co-Inventors: Fang Shengbin Huang Chao Lyu Qiujie Ran jie Wu Miao Xia Shouming Xiao Yucheng Yu Ping Zhan Yin'an Zhang Haijun Zhang Hongwu Zhu Shucheng
The utility model discloses a climbing device that hydraulic turbine electrical overhaul used, the on-line screen storage device comprises a base, the both sides of base all are provided with the auxiliary stay subassembly, the auxiliary stay subassembly is including adjusting…