The invention discloses stratum grouting reinforcement equipment for a broken belt of a shield tunnel, which comprises a stratum tunnel main body and a grouting device main body, wherein a stirring mechanism is arranged in the middle of one side of the grouting device main body,…
Long Genwang
The invention discloses a dewatering and drainage system for a foundation pit of an open cut interval of a subway station, which comprises a plurality of dewatering wells and a plurality of water collecting pits which are distributed at the bottom of the foundation pit at…
The invention discloses a grouting type leakage stopping method for a foundation pit support structure of an open cut area of a subway station, which comprises the steps of stacking a plugging object on one side of the support structure corresponding to the interior of a…
The invention discloses a waterproof structure of a side wall and a tunnel in a main body structure of a subway, which comprises a tunnel pipe body and a side wall body, wherein the side wall body is provided with a butt joint hole, a post-cast concrete ring beam is arranged…
The invention discloses a site assembling method for an inverted triangular truss of a roof canopy of a station platform at a traffic junction, which comprises the following steps of: s1: measuring and paying off, and arranging an assembling jig frame; s2: hoisting the lower…
The invention discloses a construction method of a movable protective shed during construction of a steel structure main body of a platform at a traffic junction, which comprises the following steps: s1: installing and correcting tracks on two sides of the existing canopy; s2:…
The utility model discloses a waterproof structure of a side wall and a tunnel in a main body structure of a subway, which comprises a tunnel pipe body and a side wall body, wherein the side wall body is provided with a butt joint hole, a post-cast concrete ring beam is arranged…
The invention discloses a punching and grouting type leakage stopping method for a foundation pit support structure in an open cut area of a subway station, which comprises the steps of drilling grouting holes penetrating through the foundation pit support structure at…
The invention discloses a floor drain waterproof structure in a subway main body structure, which comprises a floor drain main body and a structural plate with a mounting hole, wherein the floor drain main body is hermetically mounted in the mounting hole through a concrete…
The invention discloses a construction method of a steel structure canopy roof curtain wall of a transportation junction station platform, which comprises the following steps: s1: measuring and paying off; s2: checking whether the structure and the embedded part meet the…
The invention discloses a shield machine installation construction method under a narrow environment, which comprises the steps of constructing an originating well with a tunnel portal; hoisting and assembling the cutter head, the front shield, the middle shield and the segment…
The invention discloses a construction method of a water fire-fighting system of a transportation junction station platform, which comprises the following steps: s1: prefabricating and paying off an indoor pipeline and a bracket; s2: hot galvanizing is carried out on the indoor…
The invention discloses a long-term automatic monitoring device and a monitoring method for horizontal displacement of a double-layer sleeve type fender post. According to the invention, the outer wall pipe is sleeved outside the inner wall pipe, so that the inner wall pipe is…
The utility model discloses a floor drain waterproof construction among subway major structure, including the floor drain main part with have the structural slab of mounting hole, the floor drain main part passes through concrete casting body sealing installation in the mounting…
A hollow anchor rod for tunnel construction in a karst cave and underground river environment is characterized in that the environment comprises a karst cave and an underground river positioned at the bottom of the karst cave, the tunnel penetrates through the karst cave, the…
A karst cave section excavation supporting construction method based on karst cave underground river environment tunnel construction comprises the following steps of S1: excavating the tunnel A section to a communicated karst cave; s2: the underground river is diverted so that…
The invention discloses a bar planting method in pile foundation underpinning construction, which is characterized in that a plurality of bar planting height layers which are sequentially arranged from top to bottom at intervals are preset on a pile foundation to be bar planted;…
The invention discloses a method for plugging a foundation pit support structure in an open cut area of a subway station, which comprises the steps of chiseling a leakage part of the foundation pit support structure into a reinforcement hole with the cross section area gradually…
The invention discloses a station layer for a transportation junction and a hoisting method of the following steel columns, which comprises the following steps: s1: dividing the steel column into different sections, and arranging hoisting holes on connecting lug plates of the…
The invention discloses a construction method of a platform steel structure main body of a transportation junction, which comprises the following steps: s1: constructing a west station and an extension platform; s2: constructing an east platform and an extension platform; s3:…
The invention discloses a karst treatment construction method for a river channel area in shield construction of a subway tunnel, which comprises the steps of constructing a first cofferdam positioned on one side of a river channel in the river channel to enclose a first…
The invention discloses a shield construction method of a subway underground construction structure, which comprises the steps of setting a rock-soil layer below the construction structure and within a range of 6-10 m around the construction structure as a reinforcing layer, and…
The invention discloses a shield construction method for a subway underpass expressway, which comprises the steps of adopting a shield machine to tunnel in a rock-soil layer to reach a section which is not less than 12-15 meters away from the expressway, rectifying the posture…
The invention relates to the field of tunnel construction equipment, in particular to a ventilation device for urban rail transit tunnel construction. This kind of ventilation unit is used in urban rail transit tunnel construction, can carry out height control according to the…
The invention relates to the field of tunnel construction, in particular to a shield segment wall back deep hole grouting device which comprises a trolley plate, a first cylinder, a supporting table, a supporting mechanism and a propelling mechanism, wherein the first cylinder…