The gas turbine consists of a compressor (1), first and second combustion chambers (4, 8) with corresponding high and low pressure turbines (6, 10) and at least one generator (13). Part load operation of the gas turbine is achieved by adjusting the compressor lead vanes to reach…
Lindvall Anders
In a method of operating a gas-turbine group having sequential combustion, action is taken first of all on the inlet temperatures (A, B) at the two turbines (6, 10) in order to provide a partial-load operation. The subsequent lowering of the load takes place by adjustment of the…
The invention proposes a method for providing partial load operation in a turbine plant. This gas turbine plant essentially comprises a compressor unit (1), an HP combustion chamber (4) arranged downstream of the compressor unit (1), an HP turbine (5) arranged downstream of this…
In a method of operating a gas turbine group (34) with or without integrated steam process (20) and with or without an air reservoir installation (20), a series connection with one and the same air mass flow (16, 17) is used for cooling one or more structures (15, 18, 19) which…
A method of establishing part-load operation is proposed for a turbine group. This gas turbine group consists essentially of a compressor unit (1), of an HP combustion chamber (4) downstream of the compressor unit (1), of an HP turbine (5) downstream of this HP combustion…
In a method for the operation of a gas turbine assembly (34) with or without integrated steam process (20) and with or without an air storage system (33) a series connection with one and the same mass air flow (16,17) is used for cooling one or more structures (15,18,19)…
ABSTRACT OF THE DISCLOSURE In a method of operating a gas turbine group (34) with or without integrated steam process (20) and with or without an air reservoir installation (20), a series connection with one and the same air mass flow (16, 17) is used for cooling one or more…
ABSTRACT OF THE DISCLOSURE A method of establishing part-load operation is proposed for a turbine group. This gas turbine group consists essentially of a compressor unit (1), of an HP combustion chamber (4) downstream of the compressor unit (1), of an HP turbine (5) downstream…
In a method of operating a gas-turbine group having sequential combustion, action is taken first of all on the inlet temperatures (A, B) at the two turbines (6, 10) in order to provide a partial-load operation. The subsequent lowering of the load takes place by adjustment of the…
The invention proposes a method for providing partial load operation in a turbine plant. This gas turbine plant essentially comprises a compressor unit (1), an HP combustion chamber (4) arranged downstream of the compressor unit (1), an HP turbine (5) arranged downstream of this…