Patents
US 2011064079 A1#1631597 Most Cited · 37 citations2.5/yr · PR 2.96PendingUS · Application
Communication channel building device and n-tree building method

Disclosed is a communication channel building device which can guarantee a fair bandwidth allocation and exhibit a preferable perception AV quality in an ALM application. A transfer table building controller ( 316 ) controls building of a distribution type optimal channel table…

US 2011002333 A1#3393820 Most Cited · 23 citations1.5/yr · PR 4.65PendingUS · Application
Terminal and n-tree constructing method

A terminal apparatus is provided that minimizes traffic congestion by reducing end-to-end delay and maximizes the bandwidth available in shared N-tree ALM nodes. In this terminal apparatus, an optimal stream path information table ( 204 ) stores N-tree session information for…

US 2017003043 A1#3746639 Most Cited · 22 citations2.4/yr · PR 2.67PendingUS · Application
Controlling operation of energy-consuming devices

There is provided a computer-implemented method for controlling operation of a plurality of devices of a facility that consume energy. The method comprises obtaining parameters of an energy model representing the energy consumed by the plurality of devices of the facility, the…

WO 2014/073949 A1#4558473 Most Cited · 19 citations1.6/yr · PR 3.19PendingWO · Application
A system and method for virtual machine reservation for delay sensitive service applications

The invention provides a system (100) including a servicing module (110) that is adapted to receive and manage a service request (120) from a client network. A scheduling module (130) is in communication with the servicing module (110) and facilitates the provision and…

US 2013215789 A1#5384753 Most Cited · 17 citations1.3/yr · PR 2.63PendingUS · Application
Communication terminal and cluster monitoring method

It is an object to provide a communication terminal capable of determining a cluster formation so as to promptly perform addition of a participant terminal, while maintaining the quality of a stream relay path. Cluster monitoring terminal ( 430 ) is an apparatus to determine a…

US 8,520,556 B2#10689320 Most Cited · 10 citations0.8/yr · PR 1.81ActiveUS · Utility
Terminal and N-tree constructing method

A terminal apparatus minimizes traffic congestion by reducing end-to-end delay and maximizes the bandwidth available in shared N-tree ALM nodes. In this terminal apparatus, an optimal stream path information table stores N-tree session information for all nodes. A server…

WO 2009/098748 A1#13467406 Most Cited · 8 citations0.5/yr · PR 1.79PendingWO · Application
Terminal and n-tree constructing method

A terminal enables reduction of the traffic congestion to a minimum by reducing the end-to-end node delay and maximization of the bandwidth which a shared N-tree ALM node can use. The terminal is as follows. An optimum stream path information table (204) stores information about…

JP 2012085115 A#16179523 Most Cited · 7 citations0.5/yr · PR 1.23ActiveJP · Utility
Communication terminal and cluster monitoring method

PROBLEM TO BE SOLVED: To provide a communication terminal which can determine a cluster organization so that addition of a subscriber terminal is performed quickly while ensuring the quality of a stream relay route.SOLUTION: A cluster monitoring terminal 430 is a device which…

WO 2009/153945 A1#20152975 Most Cited · 5 citations0.3/yr · PR 1.66PendingWO · Application
Communication channel building device and n-tree building method

Disclosed is a communication channel building device which can guarantee a fair bandwidth allocation and exhibit a preferable perception AV quality in an ALM application. A transfer table building controller (316) controls building of a distribution type optimal channel table…

JP 2009213120 A#22696370 Most Cited · 4 citations0.2/yr · PR 2.59ActiveJP · Utility
Terminal and n-tree constructing method

<P>PROBLEM TO BE SOLVED: To enable reduction of the traffic congestion to a minimum by reducing the end-to-end node delay and maximization of the bandwidth which a shared N-tree ALM node can use. <P>SOLUTION: An optimum stream path information table (204) stores…

US 8,416,776 B2#26795069 Most Cited · 4 citations0.3/yr · PR 1.16ActiveUS · Utility
Communication channel building device and N-tree building method

Disclosed is a communication channel building device which can guarantee a fair bandwidth allocation and exhibit a preferable perception AV quality in an ALM application. A transfer table building controller controls building of a distribution type optimal channel table over a…

WO 2012/049788 A1#32550248 Most Cited · 3 citations0.2/yr · PR 1.09PendingWO · Application
Communication terminal and cluster observation method

Provided is a communication terminal that can determine cluster organization so that a subscriber terminal can be promptly added while maintaining the quality of a stream relay path. A cluster observation terminal (430), which determines cluster organization in a network that…

US 2012198060 A1#45043615 Most Cited · 2 citations0.1/yr · PR 0.88PendingUS · Application
network delay estimation apparatus and a network delay estimation method

A network delay estimation apparatus capable of creating a metric tree with high accuracy and in a short time. Network delay estimation apparatus ( 302 ) includes first-round measurement target node selection section ( 306 ) that selects one pair or a plurality of pairs of nodes…

AU 2015203702 A1#61569283 Most Cited · 1 citations0.1/yr · PR 0.75PendingAU · Application
Controlling operation of energy-consuming devices

There is provided a computer-implemented method for controlling operation of a plurality of devices of a facility that consume energy. The method comprises obtaining parameters of an energy model representing the energy consumed by the plurality of devices of the facility, the…

AU 2021201112 A1#96045432 Most Cited · 0 citations0.0/yr · PR 0.56PendingAU · Application
Controlling operation of energy-consuming devices

There is provided a computer-implemented method for controlling operation of a plurality of devices of a facility that consume energy. The method comprises obtaining parameters of an energy model representing the energy consumed by the plurality of devices of the facility, the…

AU 2021201112 B2#76195516 Most Cited · 0 citations0.0/yr · PR 0.56ActiveAU · Utility
Controlling operation of energy-consuming devices
Inventors: ThiÉbaux Sylvie, Lim Boon-Ping, Van Hentenryck Pascal, Van Den Briel MenkesAssignee: Commw Scient Ind Res OrgFiled 2021-02-19 · Granted 2022-08-04

There is provided a computer-implemented method for controlling operation of a plurality of devices of a facility that consume energy. The method comprises obtaining parameters of an energy model representing the energy consumed by the plurality of devices of the facility, the…

CN 101,939,954 B#79764809 Most Cited · 0 citations0.0/yr · PR 0.56ActiveCN · Utility
Terminal and N-tree constructing method

A terminal enables reduction of the traffic congestion to a minimum by reducing the end-to-end node delay and maximization of the bandwidth which a shared N-tree ALM node can use. The terminal is as follows. An optimum stream path information table (204) stores information about…

EP 2,538,622 A1#152375412 Most Cited · 0 citations0.0/yr · PR 0.56PendingEP · Application
Network delay estimation apparatus and network delay estimation method

A network delay estimation apparatus capable of creating a metric tree with high accuracy and in a short time. Network delay estimation apparatus (302) includes first-round measurement target node selection section (306) that selects one pair or a plurality of pairs of nodes…

EP 2,629,461 A1#152455234 Most Cited · 0 citations0.0/yr · PR 0.56PendingEP · Application
Communication terminal and cluster observation method

It is an object to provide a communication terminal capable of determining a cluster formation so as to promptly perform addition of a participant terminal, while maintaining the quality of a stream relay path. Cluster monitoring terminal (430) is an apparatus to determine a…

JP 2012044522 A#90940908 Most Cited · 0 citations0.0/yr · PR 0.56ActiveJP · Utility
Network delay estimation device and network delay estimation method

PROBLEM TO BE SOLVED: To provide a network delay estimation device capable of accurately forming a metric tree in a short time.SOLUTION: A network delay estimation device 302 that is a device forming a metric tree to describe delay between respective nodes of network including a…

JP 2012200014 A#98553206 Most Cited · 0 citations0.0/yr · PR 0.56ActiveJP · Utility
N-tree constructing method

PROBLEM TO BE SOLVED: To minimize traffic congestion by reducing end-to-end delay, and maximize the bandwidth available in shared N-tree ALM nodes.SOLUTION: Compared to an MST-based method of constructing source-based trees and applying bias towards the shortest delay path, the…

MY 165,662 A#112550814 Most Cited · 0 citations0.0/yr · PR 0.56ActiveMY · Utility
A system and method for virtual machine reservation for delay sensitive services applications

THE INVENTION PROVIDES A SYSTEM (100) INCLUDING A SERVICING MODULE (110) THAT IS ADAPTED TO RECEIVE AND MANAGE A SERVICE REQUEST (120) FROM A CLIENT NETWORK. A SCHEDULING MODULE (130) IS IN COMMUNICATION WITH THE SERVICING MODULE (110) AND FACILITATES THE PROVISION AND…

US 10,837,666 B2#101871338 Most Cited · 0 citations0.0/yr · PR 0.56ActiveUS · Utility
Controlling operation of energy-consuming devices
Inventors: ThiÉbaux Sylvie, Lim Boon-Ping, Van Hentenryck Pascal, Van Den Briel MenkesAssignee: Nat Ict Australia LtdFiled 2015-07-28 · Granted 2020-11-17

There is provided a computer-implemented method for controlling operation of a plurality of devices of a facility that consume energy. The method comprises obtaining parameters of an energy model representing the energy consumed by the plurality of devices of the facility, the…