Failure of one or more battery cells, for example of an inverter battery bank, is detected by monitoring the second derivative of the curve U(t) representative of the voltage U at the terminals of the battery in the course of discharge. If the second derivative is positive, this…
Lailler Patrick
The backup time of the battery is obtained by estimation, in iterative manner, of discharging of the battery during successive estimated time intervals. During each of the estimated time intervals, an estimated discharging current in terms of the actual discharge power, an…
The preparation time of battery (T) is simulated battery discharge in (Δ T) at interval in continuous simulated time in repeatedly mode and is obtained.In each simulated time interval,, utilize actual discharge power (P), aanalogvoltage (E) and analog charge state (S) to…
The backup time of the battery is obtained by estimation, in iterative manner, of discharging of the battery during successive estimated time intervals. During each of the estimated time intervals, an estimated discharging current in terms of the actual discharge power, an…
The fault in one or more battery cells, for example in an invertor battery, is detected by monitoring the second derivative (D) of the curve U(t) representing the voltage U at the terminals of the battery in the course of a discharge. If the second derivative is positive (F7),…
The process involves subjecting the battery to a succession of periods of alternate charging and rest. The transition from one to the other is effected when the voltage (U) between the battery terminals attains an upper limit (U2). The battery is then allowed to rest until the…
A supercapacitor (20) electrode (11) comprises a current collector (15) with a porous three-dimensional metal foam, textile or felt structure. Independent claims are also included for the following: (i) a supercapacitor (20) containing the above electrode (11); and (ii) a…
Lead acid battery electrolyte comprises (in weight %): colloidal silica 1-5; orthophosphoric acid 1.5-3; sulfuric acid 35-45; and water the remainder. Preferred Features: The amount of colloidal silica is preferably 2-4 weight % of the electrolyte. The average size of the silica…
When one or more battery units (such as, inverter battery group) when damaging, can detect this damage by the second derivative (D) of monitoring the curve U (t) that in discharge process, represent battery terminal voltage U.If second derivative is on the occasion of (F1), then…
The endurance (T) of the battery is obtained by iteratively simulating the discharge of the battery during successive simulated time intervals ( DELTA T). During each of the simulated time intervals, a simulated discharge current (i) is calculated as a function of the actual…
Procédé de détermination d’un itinéraire routier L’invention porte sur un procédé de détermination d’un itinéraire routier adapté à un véhicule (10) et un conducteur comprenant : - une première étape (110) de collecte de données sur la conduite du véhicule par le conducteur sur…
PROCESS FOR DETERMINING THE BACKUP TIME OF A BATTERY The backup time (T) of the battery is obtained lay simulation, in iterative manner, of discharging of the battery during successive simulated time intervals (.DELTA.T). During each of the simulated time intervals, a simulated…
PROCESS FOR DETERMINING THE BACKUP TIME OF A BATTERY The backup time (T) of the battery is obtained lay simulation, in iterative manner, of discharging of the battery during successive simulated time intervals (.DELTA.T). During each of the simulated time intervals, a simulated…
Failure of one or more battery cells, for example of an inverter battery bank, is detected by monitoring the second derivative (D) of the curve U(t) representative of the voltage U at the terminals of the battery in the course of discharge. If the second derivative is positive…
Failure of one or more battery cells, for example of an inverter battery bank, is detected by monitoring the second derivative (D) of the curve U(t) representative of the voltage U at the terminals of the battery in the course of discharge. If the second derivative is positive…
Failure of one or more battery cells, for example of an inverter battery bank, is detected by monitoring the second derivative of the curve U(t) representative of the voltage U at the terminals of the battery in the course of discharge. If the second derivative is positive, this…
LA DURACION DE AUTONOMIA (T) DE LA BATERIA ES OBTENIDA POR SIMULACION, DE MODO REITERATIVO, DE LA DESCARGA DE LA BATERIA DURANTE LOS INTERVALOS DE TIEMPOS ( T) SIMULADOS SUCESIVOS. DURANTE CADA UNO DE LOS INTERVALOS DE TIEMPOS SIMULADOS, SE CALCULA UNA CORRIENTE DE DESCARGA…
EL FALLO DE UNO O VARIOS ELEMENTOS DE BATERIA, POR EJEMPLO DE UNA BATERIA DE ONDULADOR, ES DETECTADO POR LA VIGILANCIA DE LA DERIVADA SEGUNDA (D) DE LA CURVA U (T) REPRESENTATIVA DE LA TENSION U EN LOS BORNES DE LA BATERIA EN EL CURSO DE UNA DESCARGA. SI LA DERIVADA SEGUNDA ES…