Es wird ein Verfahren vorgeschlagen zum Projektieren eines Projektes, welches eine Automatisierungseinrichtung (4) zum Steuern einer technischen Anlage repräsentiert, wobei in einem auf einem Server (11) hinterlegten Root-Projekt (14) die für die Projektierung der…
Kohl Frederic
The method involves providing a controlling program (24), and determining and storing data (28) using a logging tool (30) during transmission of the data at run-time. Telegrams (32) exchanged between a programming device (26) and an automation device (14) are monitored by the…
The method involves releasing a system status information (44) with reference to a control program (24) or a process image (40) representing a technical process by an automation device (14). The system status information is transmitted to an operating unit (26). A note (36) is…
The method involves detecting and storing telegrams (36) transmitted in connection with communication processes between a transmitter (28) and receiver (30) by a logging tool (34) during the communication process. A combination of transmitted telegrams is provided as notes (40)…
The method involves releasing a system status information (44) with reference to a control program (24) or a process image (40) representing a technical process by an automation device (14). The system status information is transmitted to an operating unit (26). A note (36) is…
The method involves releasing a system status information (44) with reference to a control program (24) or a process image (40) representing a technical process by an automation device (14). The system status information is transmitted to an operating unit (26). A note (36) is…