<P>PROBLEM TO BE SOLVED: To compatibly achieve both of plant efficiency and quick load variation. <P>SOLUTION: A reheat steam temperature is controlled by setting an opening of a water injection valve 3 of a spray temperature reducer 2 on the basis of a load command…
Itami Tetsuo
<P>PROBLEM TO BE SOLVED: To provide a boiler controller concurrently improving control followability of power generation output, a main steam pressure, and enthalpy of steam. <P>SOLUTION: The boiler controller includes a first control loop adjusting an opening of a…
PURPOSE: To obtain a high denitration capacity not only at higher temperatures but also at low temperatures by changing a proper reaction temperature in accordance with the temperature change in the reaction space in a non catalytic denitration apparatus by a method in which the…
<P>PROBLEM TO BE SOLVED: To provide a transformable toy which enables the enjoyment of a transformation process which has not been seen in a conventional toy. <P>SOLUTION: A movable toy contains an assembly component constituted of a plurality of parts which is…
PURPOSE:To provide a device for controlling the circulating flow rate of a liquid absorbent for a wet flue gas desulfurizer where the circulating flow rate of the liquid absorbent is controlled to keep the desulfurization efficiency at the desired value without measuring the…
PURPOSE: To improve the controllability of steam temperature control by adjusting parameters such as flame repletion rate, combustion rate and the like by using a neural network, which employs on-line instrumentation quantum, in computing temperature at an outside of a secondary…
<P>PROBLEM TO BE SOLVED: To provide a game system configured to make players cooperate with each other in executing a block falling game. <P>SOLUTION: Block requesting means 521 transmits a block request for requesting a block BR composed of a plurality of balls A to…
<P>PROBLEM TO BE SOLVED: To provide a game machine configured so that a player's operation also affects components of an opponent in a game of obtaining scores in accordance with the state of a plurality of components ball piled up. <P>SOLUTION: The game machine…
PROBLEM TO BE SOLVED: To most suitably control a non-linear chemical reaction system such as a denitration or desulfurization control device by minimizing the sum of a time integral value from the control start to the termination of a Lagrange's function being the function…
PURPOSE:To improve control performance of a fuel flow rate by enhancing a predicting accuracy of an outlet steam temperature of a superheater even by using a furnace physical model parameter which is difficult to be previously set. CONSTITUTION:In order to compensate a delay of…
PROBLEM TO BE SOLVED: To provide a control method for recovering a good satisfactory state by detecting faulty fluidity of a medium caused by a low melting point compound produced through reaction of ash in fuel and limestone as a fluidity medium, in the early stage. SOLUTION:…
PURPOSE:To permit following to the quick change of a load by a method wherein a PI regulating signal for a difference between the set value of gas temperature of a furnace and the operated value of gas temperature of the furnace is added as the feedback signal to the flow rate…
PROBLEM TO BE SOLVED: To provide a method and a device for the nonlinear optimum adaptive control, where computing speed is quickened by improving a calculation of a basic equation for calculating a manipulated variable of a control parameter to a controlled object, and capable…
PROBLEM TO BE SOLVED: To provide a volatile organic compound (VOC) containing exhaust gas treatment device and method securing VOC removal efficiency when VOC concentration rises after a process change-over while minimizing consumption of stabilizing burner fuel when the VOC…
PROBLEM TO BE SOLVED: To prevent the over-rise of a fluidized bed temperature and remaining of unburnt fuel by a method wherein process control is effected, preventing the hunting of reheat steam temperature or a layer temperature and controlling the temperatures so as to meet…
PROBLEM TO BE SOLVED: To prevent over-denitration and to avoid the deviation of outlet NOx concn. from a lower limit by controlling denitration on the basis of adsorbed NH3 quantity necessary after the elapse of (n) hr from the present point of time. SOLUTION: In a denitration…
PROBLEM TO BE SOLVED: To permit fluctuation in the load of a plant depending on a required fluctuation rate of load by regulating transportation of BM from a medium container to a furnace, even if the transportated quantity is very small and the horizontal distance between the…
PROBLEM TO BE SOLVED: To provide a control method for a volatile organic compound processing apparatus including a procedure of securely protecting a combustion catalyst even when a rapid increase of the amount of heat produced from VOC containing gas in a catalyst…
<P>PROBLEM TO BE SOLVED: To provide an apparatus for treating exhaust gas, in which the NOx concentration at an outlet is kept within the preset range by compensating the fuzzy correction being an advance control correction so that the amount of NH<SB>3</SB>to…
<P>PROBLEM TO BE SOLVED: To fair dynamic characteristic of a boiler by independently optimally controlling power generation output by a governor, a main vapor pressure by fuel, and primary superheater inlet enthalpy by a flow rate in water supply without affected by each…
PROBLEM TO BE SOLVED: To provide the starting method of a fuel fluidized bed boiler, capable of setting the temperature of a fluidized bed upon charging fuel into the fluidized bed by operation depending on the kind of the fuel. SOLUTION: In the starting method of a fluidized…
<P>PROBLEM TO BE SOLVED: To promptly obtain an optimum value by speeding up the operation of a global optimization apparatus used for optimum control for various plants and devices. <P>SOLUTION: In a method for operating the global optimization apparatus, a global…
PROBLEM TO BE SOLVED: To suitably discharge powder from a first reservoir to a second reservoir for various charging state by measuring a differential pressure between the first reservoir and the second reservoir for storing the powder discharged from the first reservoir, and…
PROBLEM TO BE SOLVED: To operate refuse fuel supply previously based on the simultaneously predicted properties of fluctuation in the low heating value and the moisture content of refuse fuel. SOLUTION: The low heating value and the moisture content of refuse 1 currently burning…
PROBLEM TO BE SOLVED: To obtain a fluidized bed height trend which can promptly follow a set fluidized bed height value by controlling pneumatic conveyance for discharging powder in a first storage portion so that an estimated value of the fluidized bed height of the first…