<P>PROBLEM TO BE SOLVED: To provide a dry ice blasting device which is provided with a simple, inexpensive structure, and stably supplies dry ice grains while uniforming the size of dry ice grains supplied on a jet. <P>SOLUTION: The dry ice blasting device is…
Inoue Ryosuke
PROBLEM TO BE SOLVED: To facilitate the work to mount markers to wires as the markers for wire identification to be mounted on the bundled wire for the purpose of individual identification of the wires. SOLUTION: This marker consists of two members and each marker has a smooth…
PURPOSE:To limit the kind of resin material contained in the seluage of a sheet and a consequently usefully reuse the seluage by a method wherein the ratio of melt viscosities of adjoining resins consisting of the layers of the sheet in the manufacture of co-extruded sheet by…
PROBLEM TO BE SOLVED: To provide a PDI(point diffraction interferometry)-type interference measuring instrument etc., allowing the alignment of a tested surface with the interference measuring instrument by using a simple procedure. SOLUTION: This aligning method is used in a…
<P>PROBLEM TO BE SOLVED: To provide a nickel-plated electrode appropriate as an object for aluminum wire bonding, in which strength of wire bonding is enhanced while variation in strength is reduced. <P>SOLUTION: An electrode matrix is plated with nickel to provide a…
<P>PROBLEM TO BE SOLVED: To reduce the circumferential and radial bending moments accompanying sloshing (disturbance on a liquid surface) which occurs in a floating roof type storage tank owing to the vibration as of an earthquake. <P>SOLUTION: The floating roof type…
PROBLEM TO BE SOLVED: To allow for employment of a trough system underground electric line, regardless of presence or absence of the existing infrastructure equipment in a sidewalk.SOLUTION: A block set 1 for building a trough system underground electric line 10 includes a…
To provide a protective tube fixture in a wire accommodating facility capable of drawing electric wires obliquely from a side wall of a wire accommodating facility by using a general protective pipe.SOLUTION: A fixture 30 is provided which is attached to an opening 26 formed in…
PURPOSE:To make handling properties of a cushioning material for molding of a laminated sheet favorable, prevent resin from adhering to the cushioning material and also make the cushioning material superior in durability. CONSTITUTION:Fluorine resin impregnated cloth is used as…
PURPOSE:To permit to switch the resin flow path by only turning a selector plug into the circumferential direction thereof by a method wherein a starting point and a terminal point of a resin flow path are provided at positions, which are displaced from respective starting and…
PROBLEM TO BE SOLVED: To provide a wire common trench capable of forming a space for housing a connection device of wire as wide as possible, by forming a housing box constituting a special part as low as possible.SOLUTION: A wire common trench includes a cable trough 11…
PURPOSE:To simultaneously form an outermost layer to protect a base resin layer under the condition that the outermost layer can be peeled off on occasion, by a method wherein both the outermost layer and the base resin layer, which is stick to but does not bonded to the…
(57)【要約】本公報は電子出願前の出願データであるた め要約のデータは記録されません。
(57)【要約】本公報は電子出願前の出願データであるた め要約のデータは記録されません。
<P>PROBLEM TO BE SOLVED: To provide a rainwater storage system which is easily installable, having superior durability, enabling discharging of discharging of rainwater with a pump and is readily maintainable. <P>SOLUTION: This rainwater storage system comprises…
<P>PROBLEM TO BE SOLVED: To accurately and efficiently cut a fixing bolt for fixing a lid receiving frame 12 of a manhole 11. <P>SOLUTION: A drill 27 of a cutter 23 is positioned in accordance with an anchor bolt 13 in the manhole in a state in which the axis X of…
<P>PROBLEM TO BE SOLVED: To provide a road facility in which lane separating members for separating a passing zone can be easily removed from a road if necessary. <P>SOLUTION: The road facility includes side-ditch blocks 2 installed in the exposed state of upper…
PROBLEM TO BE SOLVED: To provide a wire lead-out method in a duct formation, capable of securing an enough space in which a wiring is curved for leading out the wiring housed in an inner part.SOLUTION: In a method for leading out a wiring Ka from an inner part of a duct…
<P>PROBLEM TO BE SOLVED: To provide an inspection apparatus capable of performing highly accurate inspection by preventing deterioration of optical performance of a projection optical system to be used for immersion exposure. <P>SOLUTION: The inspection apparatus INS…
<P>PROBLEM TO BE SOLVED: To provide a drain structure of a road capable of effectively preventing clogging of a drain layer, by efficiently draining moisture inside of the drain layer in a wide range of the road. <P>SOLUTION: This drain structure of the road is…
PROBLEM TO BE SOLVED: To provide a construction method of a utility tunnel from an existing side ditch for drainage, without requiring complicated maintenance work for the drainage after construction.SOLUTION: A construction method of a utility tunnel from an existing side ditch…
PROBLEM TO BE SOLVED: To provide drainage equipment that allows a catch basin and a cable pit to be disposed in a side-ditch block for water drainage that also functions as a common ditch for electric wires, at an appropriate position where cables are easily laid.SOLUTION:…
PURPOSE:To obtain a comparatively inexpensive composite sheet superior in physical properties such as high hardness, high glossiness, weather resistance and shock resistance, by a method wherein a first and third layers are acrylic resin and a second layer is constituted of a…
PURPOSE:To obtain a sheet with high impact resistance capable of maintaining a matte state imparted thereto in sheet molding by blending specific polypropylene with high-density polyethylene, elastomer and inorganic filler. CONSTITUTION:A sheet obtained by blending (A) 50-70…
<P>PROBLEM TO BE SOLVED: To suppress sloshing occurring when earthquake motion works to a floating roof type storage tank. <P>SOLUTION: The floating roof type storage tank has a tank body with an upper part opened and a floating roof 5 with its periphery in slide…