An apparatus is provided for removing the severed end-portions of boiler tubes installed and retained in a boiler header without consequential boiler header metal damage and in a manner whereby a compression gap of uniform width is machined throughout the length and thickness of…
Ingram Gary E
A suspension work platform hoist system for raising and lowering a work platform is provided. The system incorporates at least one hoist attached to the work platform and in electrical communication with a hoist control system that may have a data transmitter to transmit data to…
A powered controlled acceleration suspension work platform hoist system for raising and lowering a work platform at a predetermined acceleration. The system incorporates several hoists attached to the work platform and in electrical communication with the motor control system.…
A method and apparatus is provided for removing the severed end-portions of boiler tubes installed and retained in a boiler header without consequential boiler header metal damage and in a manner whereby a compression gap of uniform width is machined throughout the length and…
The hoist control cooling system for preferentially cooling components of a variable frequency drive that is controlling a hoist motor. The cooling system includes an inverter temperature sensor, an ambient temperature sensor, a cooling system controller, an inverter cooler, and…
The hoist control cooling system for preferentially cooling components of a variable frequency drive that is controlling a hoist motor. The cooling system includes an inverter temperature sensor, an ambient temperature sensor, a cooling system controller, an inverter cooler, and…
A powered controlled acceleration suspension work platform hoist system for raising and lowering a work platform at a predetermined acceleration. The system incorporates several hoists attached to the work platform and in electrical communication with the motor control system.…
A suspension work platform hoist system for raising and lowering a work platform is provided. The system incorporates at least one hoist attached to the work platform and in electrical communication with a hoist control system that may have a data transmitter to transmit data to…
A powered controlled acceleration suspension work platform hoist system for raising and lowering a work platform at a predetermined acceleration. The system incorporates several hoists attached to the work platform and in electrical communication with the motor control system.…
A method and apparatus is provided for removing the severed end-portions (20, 24, 26) of boiler tubes installed and retained in a boiler header(28) without consequential boiler header metal damage and in a manner whereby a compression gap of uniform width is machined throughout…
A powered controlled acceleration suspension work platform hoist system (10) for raising and lowering a work platform (100) at a predetermined acceleration. The system (10) incorporates several hoists (200, 300) attached to the work platform (100) and in electrical communication…
A powered controlled acceleration suspension work platform hoist system for raising and lowering a work platform at a predetermined acceleration. The system incorporates several hoists attached to the work platform and in electrical communication with the motor control system.…
A suspension work platform hoist system for raising and lowering a work platform is provided. The system incorporates at least one hoist attached to the work platform and in electrical communication with a hoist control system has a data transmitter to transmit data to a remote…
A suspension work platform hoist system for raising and lowering a work platform is provided. The system incorporates at least one hoist attached to the work platform and in electrical communication with a hoist control system having a monitoring and diagnostic system to monitor…
A powered controlled acceleration suspension work platform hoist system (10) for raising and lowering a work platform (100) at a predetermined acceleration. The system (10) incorporates several hoists (200, 300) attached to the work platform (100) and in electrical communication…
A powered controlled acceleration suspension work platform hoist system for raising and lowering a work platform at a predetermined acceleration. The system incorporates several hoists attached to the work platform and in electrical communication with the motor control system.…
A method and apparatus is provided for removing the severed end-portions of boiler tubes installed and retained in a boiler header without consequential boiler header metal damage and in a manner whereby a compression gap of uniform width is machined throughout the length and…
A method and apparatus is provided for removing the severed end-portions of boiler tubes installed and retained in a boiler header without consequential boiler header metal damage and in a manner whereby a compression gap of uniform width is machined throughout the length and…
A powered controlled acceleration suspension work platform hoist system (10) for raising and lowering a work platform (100) at a predetermined acceleration. The system (10) includes a plurality of elevators (200, 300) connected to the work platform (100) and in electrical…
A powered controlled acceleration suspension work platform hoist system (10) for raising and lowering a work platform (100) at a predetermined acceleration. The system (10) incorporates several hoists (200, 300) attached to the work platform (100) and in electrical communication…
A method and apparatus is provided for removing the severed end-portions (20, 24, 26) of boiler tubes installed and retained in a boiler header(28) without consequential boiler header metal damage and in a manner whereby a compression gap of uniform width is machined throughout…