<P>PROBLEM TO BE SOLVED: To obtain an optimal product mix in a manufacturing process in which changeover is required by the property of a product, etc. when a plurality of orders are processed in a plurality of parallel facilities. <P>SOLUTION: A production plan…
Imoto Kosuke
An ignition apparatus for an internal combustion engine includes means for generating signals indicating when the crankshaft and camshaft of the engine have respectively reached predetermined angular positions, a command circuit for initiating and terminating ignition operation…
<P>PROBLEM TO BE SOLVED: To prepare a high-quality schedule for a production line including a process for lot sizing by preparing a schedule for respective processes and an overall schedule. <P>SOLUTION: This production schedule preparation method has: process…
<P>PROBLEM TO BE SOLVED: To provide a production schedule creation device for creating an efficient production schedule while reducing an amount of calculation. <P>SOLUTION: The production schedule creation device for determining order of processing of a plurality of…
PROBLEM TO BE SOLVED: To provide a method for extension of a mooring cable by which efficiency of a mooring work can be achieved, a method for mooring a floating body structure and a method for construction of a floating body type offshore wind power generation…
PROBLEM TO BE SOLVED: To much more quickly create a schedule in the case of producing a plurality of types of products than a conventional manner, and to create a much more optimal schedule.SOLUTION: A production schedule creation device is configured to create a schedule of a…
<P>PROBLEM TO BE SOLVED: To provide a production plan creation device and method for properly creating a production plan even when a sudden event occurs. <P>SOLUTION: This production plan creation device S for creating a production plan in plurality of types of…
PROBLEM TO BE SOLVED: To include an evaluation index of a delivery time when preparing a slab batch heat treatment schedule.SOLUTION: In planning a schedule for collecting many types of slabs having different treatment temperatures at the same temperature to each other to…
An ignition timing control system for an internal combustion engine cuts the ignition when the engine rotational speed is below a threshhold speed indicative of stall. On starting, the threshhold speed is set low. The engine speed is monitored, and a higher threshhold is set…
<P>PROBLEM TO BE SOLVED: To take advantage of facility capacity at maximum. <P>SOLUTION: The facility load plan creation device comprises an operation date and time determination part for determining an operation date and time based on a delivery date and a…
<P>PROBLEM TO BE SOLVED: To determine an optimum product production configuration within a range of equipment capability even when fluctuation of an equipment load or fluctuation of demand occurs. <P>SOLUTION: In an arithmetic part of a computer, the following…
PROBLEM TO BE SOLVED: To facilitate planning of a production schedule for implementing a prescribed production program with the capacity of a factory and possible substantial fluctuations in operation being taken into account.SOLUTION: A production schedule planning device…
PROBLEM TO BE SOLVED: To determine the optimum production configuration within a range of facility capacity even when fluctuation of facility loads and fluctuation of demands occur.SOLUTION: Pieces of basic information regarding periods, passed process routes, raw material…
<P>PROBLEM TO BE SOLVED: To provide a production plan preparation apparatus and a production plan preparation method, for preparing a production plan in consideration of setup change by simple processing even in a case of various types of products, addition of a product…
<P>PROBLEM TO BE SOLVED: To prepare a production plan for maximizing a production amount by performing batch processing not only in a first process but also in a middle process and also considering the processing ability of each equipment. <P>SOLUTION: A load…
PROBLEM TO BE SOLVED: To provide a method for mooring a floating body structure by which a lifted mooring chain can be easily tied to a floating body structure, and a method for construction of a floating body type offshore wind power generation facility.SOLUTION: A method for…
PROBLEM TO BE SOLVED: To provide a water bottom mound structure and a storage method of a floating body structure for an offshore facility capable of having a floating body structure anchored stably in a water area.SOLUTION: A water bottom mound structure 10 of the present…
<P>PROBLEM TO BE SOLVED: To provide an equipment load plan preparation device, a method therefor, a program therefor and a recording medium, for finding a defect in an equipment load plan as a result of load calculation. <P>SOLUTION: The equipment load plan…
PROBLEM TO BE SOLVED: To quickly prepare a schedule that takes a schedule as a whole into account and is excellent in production efficiency of each piece of equipment in respective processes when producing a product through a plurality of processes including a process using a…
PROBLEM TO BE SOLVED: To provide a production schedule planning device for planning a satisfactory production schedule in a short time with respect to even a production line in which batch processing exists in an arbitrary process following a first process, especially a…
PROBLEM TO BE SOLVED: To provide a production plan creation device, a production plan creation method, and a production plan creation program capable of creating a production plan satisfying restrictions of making preparation (including preparation changing) within…
PROBLEM TO BE SOLVED: To provide a methane hydrate mining apparatus capable of suitably mining methane hydrate present at the bottom of an ocean or lake.SOLUTION: A methane hydrate excavation/recovery robot B is for digging and recovering methane hydrate 1 at water bottom W1.…
To provide a floating body, a floating body mooring device and a floating body mooring method capable of suppressing the prolonged mooring work of the floating body.SOLUTION: A floating body 1 comprises: a floating main body 10 on which a wind power generator 2 is installed; a…
To create a further accurate inventory possession plan between a first process and a second process.SOLUTION: An inventory possession plan creating device includes a process schedule creation unit for creating a process schedule, an inventory volume processing unit for acquiring…