Disclosed in the present invention is a method for analyzing the stability of a geotechnical engineering structure in bedded rock in a seasonally frozen ground region, comprising: S1, defining a bedding-freezing-thawing coupling damage variable of a rock mass; S2, establishing a…
Hou Laping
The utility model discloses a long-span subway station main structure constructed based on a column and arch method. The long-span subway station main structure comprises a station internal main structure formed through excavation, a plurality of middle columns, middle plates…
The utility model discloses a long-span tunnel arch portion secondary lining rebar colligation structure based on skeleton beams. The long-span tunnel arch portion secondary lining rebar colligation structure based on the skeleton beams comprises an outer-layer reinforcing steel…
The invention discloses a dynamic regulation and control method for rocky foundation pit blasting parameters, which is characterized in that a nonlinear mapping relation between an input vector and an output vector is established by utilizing a GP machine learning method, an…
A method for constructing and calculating a rock creep damage constitutive model under a freeze-thaw cycle action, comprising: S1, setting a freeze-thaw rock non-constant creep parameter; S2, introducing a freeze-thaw damage viscous element into a freeze-thaw cycle rock creep…
The invention discloses a stability analysis method of a rock engineering structure in bedding rock in a season freezing region, which comprises the following steps of S1: defining a bedding-freeze thawing coupling damage variable of a rock mass; s2: establishing a nonlinear…
The invention discloses a method for constructing and calculating a rock creep damage constitutive model after freeze-thaw cycling, which comprises the following steps: s1, setting the unsteady creep parameters of the freeze-thaw rock; s2, introducing a freeze-thaw damage…
A personnel positioning system and a risk assessment method in foundation pit construction. The system comprises: a plurality of ground surface settlement detection units (1) provided on the ground surface (6) of a foundation pit and a plurality of personnel positioning units…
The invention discloses a kind of vibration velocity prediction technique for the foundation pit static blasting closing on structures, this method predicts the vibration velocity in static blasting coverage using genetic neural network, specifically, with geological strength…
The invention discloses a kind of borehole perpendicularity automatic monitoring method based on BIM, comprising steps of one, building borehole perpendicularity testing agency;Two, the unit dropping distance of obliquity sensor is set;Three, the decline of obliquity…
The invention discloses an anti-floating waterproof system and an anti-floating waterproof method applied to a deep foundation pit in a karst water-rich area, wherein the system comprises the following components: foundation ditch main part and precipitation well, the foundation…
The invention discloses a method for determining the safe thickness of a side wall of a karst area of a foundation pit, which comprises the steps of determining the length m of the side wall of the foundation pit, influenced by the karst area, the length n of the karst area and…
The utility model discloses a kind of lattice column locator, including column, lattice cap is arranged at the top of column, the bottom of column is hinged with the plate pulling hook being detachably connected with lattice column;Column is made of the batten plate laid…
The utility model discloses a synthesize protective structure for facing sea environment subway station open cut deep basal pit, including the foundation ditch main part, the foundation ditch main part includes roof, bottom plate and sets up the side wall in the side, be…
The utility model discloses a joint anti structure of floating of karst area foundation ditch, including the foundation ditch main part, the foundation ditch main part includes roof, bottom plate and the side wall of setting in the side, bottom plate department is equipped with…
The invention discloses a kind of lattice column locator and its localization method, lattice column locator includes column, is arranged with lattice cap at the top of column, the bottom of column is hinged with the plate pulling hook being detachably connected with lattice…
The invention provides a personnel positioning system and a risk assessment method in foundation pit construction, which comprise the following steps: the system comprises a plurality of ground surface settlement detection units arranged on the ground surface of the foundation…
The invention discloses a statistical damage calculation method for rocks after high-temperature-water cooling circulation; 1) defining damage variables of the rock after the high-temperature-water cooling circulation; 2) establishing a first constitutive relation model of the…
The invention discloses a device and a method for monitoring stability of a foundation pit and controlling axial force of a steel support, comprising the following steps: the main body box is used as a supporting body to support the solar energy power storage module, the…
The utility model provides a reinforced (rfd) envelope of foundation ditch excavation soil body for closing on pile foundation, be in including pile foundation and setting near the pile foundation if dry concrete interlock stake, the interlock width has between the concrete…
The utility model discloses an anti waterproof system that floats for deep basal pit in karst rich water district, this system includes: foundation ditch main part and precipitation well, the foundation ditch main part includes: a top plate, a bottom plate and side walls; the…
The utility model discloses a slip casting device for foundation ditch karst district includes: the device comprises a metal net, a water stop plate, a grouting pipe, a water pumping pipe and a one-way communication device; the metal net covers the water outlet of the karst…
Disclosed in the present invention is a method for determining the safe thickness of a side wall in a karst area of a foundation pit, comprising: determining the length m of the side wall, affected by the karst area, of the foundation pit, the length n of the karst area, and…
The invention belongs to the technical field of supporting structures, and particularly relates to a tunnel supporting structure close to the side wall of a covered and excavated foundation pit. This tunnel supporting construction of foundation ditch lateral wall is dug to…
The invention discloses a parallel evaluation method for predicting the water inrush probability of geotechnical engineering, which comprises the following steps: sampling geotechnical engineering comprehensive data to establish a water inrush prediction sample; establishing a…