Inventor / Author Profile
Hirsch Karsten
3Total Forward Citations
6Indexed Patents
1Patent H-Index
A prefabricated frame is placed on the levelled floor of esp. an excavation, is adjusted to a preselected horizontal level, and is then filled with concrete to form a sole plate. The frame is constructed with holders (8) for columns for the building. On laying out the frame, the…
A prefabricated frame is placed on the levelled floor of esp. an excavation, is adjusted to a preselected horizontal level, and is then filled with concrete to form a sole plate. The frame is constructed with holders (8) for columns for the building. On laying out the frame, the…