Patents
US 3,885,423 A#9744353 Most Cited · 10 citations0.2/yr · PR 8.21ExpiredUS · Utility
Method of measuring changes in the area surrounding a mining cavity
Inventors: Schuermann Fritz, Muller Herbert, Boddicker Horst, Heusinger Peter-paulAssignee: Bergwerksverband GmbhFiled 1974-02-20 · Granted 1975-05-27

A method of measuring changes in the area surrounding a mining cavity in which a rod-like anchor is rigidly embedded in a bore hole of such cavity. The changes in the strata are measured in several planes distributed over the length of the anchor by sensors, which are mounted on…

US 3,894,427 A#10029484 Most Cited · 10 citations0.2/yr · PR 2.77ExpiredUS · Utility
Device for measuring changes in converging rock formations in a mining cavity
Inventors: Schuermann Fritz, Muller Herbert, Boddicker Horst, Heusinger Peter-paulAssignee: Bergwerksverband GmbhFiled 1974-02-20 · Granted 1975-07-15

A device for measuring changes in rock formations in a mining cavity employing elongate tubes fixed by adhesive in bore holes in opposite walls so that they align axially. The tubes are measuring anchors and each contains a series of axially spaced sensors in the form of strain…

US 3,894,428 A#10040439 Most Cited · 10 citations0.2/yr · PR 2.74ExpiredUS · Utility
Measuring anchors for use in mining
Inventors: Schuermann Fritz, Muller Herbert, Boddicker Horst, Heusinger Peter-paulAssignee: Bergwerksverband GmbhFiled 1974-02-20 · Granted 1975-07-15

A measuring anchor for measuring changes in the area surrounding a mining cavity constitutes an elongate rod-like member rigidly embedded by adhesive in a bore hole of such cavity. On the external surface of the rod-like member are diametrically opposed external recessed…

DE 2,920,420 A1#14695802 Most Cited · 7 citations0.1/yr · PR 2.10PendingDE · Application
Monitoring critical stress conditions in mines and tunnels - using geophones and staggered frequency-time signal distribution evaluation
Inventors: Heusinger Peter-paul Dipl PhysAssignee: Bergwerksverband GmbhFiled 1979-05-19

The method is for monitoring critical stress conditions, esp. in large geological layers of mining and tunneling constructions, enables the accuracy of measurement to be increased w.r.t. conventional methods in combination with equivalent or reduced cost of measurement…

DE 2,133,529 B2#101309769 Most Cited · 0 citations0.0/yr · PR 0.56ExpiredDE · Utility
Piezoelectric borehole microphone for seismic signals - has twin piezoceramic discs locked in borehole by wedge contact pieces

The piezoelectric microphone for measuring mechanical vibrations consists of a twin assembly of piezoceramic discs with rounded contact pieces bonded to them on both sides. One of the contact pieces is split to form two wedges. The microphone can be wedged diametrally at a…