Patents
Inventor / Author Profile

Han Changling

342Total Forward Citations
90Indexed Patents
12Patent H-Index
CN 110,847,930 A#1957576 Most Cited · 33 citations5.5/yr · PR 4.15ActiveCN · Utility
Multistage yielding-resisting supporting structure of extremely-high ground stress soft rock large-deformation tunnel and construction method

The invention relates to a multistage yielding-resisting support structure and a construction method for a tunnel with extremely high ground stress and large deformation of soft rock, wherein after a tunnel with a nearly circular section is excavated, long anchor cables and…

CN 202,690,082 U#3850856 Most Cited · 21 citations1.6/yr · PR 5.01ActiveCN · Utility
Combined steel frame structure for preventing deformation and subsidence of tunnel
Inventors: Shi Yanwen, Han Changling, Ding Xiaojun, Zhang Wuxiang, Yang YanminAssignee: Cccc First Highway ConsultantsFiled 2012-05-28 · Granted 2013-01-23

The utility model relates to a combined steel frame structure for preventing deformation and subsidence of a tunnel. The main methods for controlling larger subsidence and deformation of the tunnel are as follows: addition of temporary inverted arches and adoption of the…

CN 206,205,908 U#3975625 Most Cited · 21 citations2.3/yr · PR 3.07ActiveCN · Utility
A kind of channel-section steel bow member joist for preventing tunnel subsidence to deform
Inventors: Shi Yanwen, Han Changling, Xu Zhi, Yang Shaozhan, Sun HaidongAssignee: Cccc First Highway ConsultantsFiled 2016-06-22 · Granted 2017-05-31

The utility model is related to a kind of channel-section steel bow member joist for preventing tunnel subsidence to deform., there is the drawbacks such as working procedure is numerous and diverse, progress is slow, construction costs is high in the tunnel deformation…

CN 103,147,453 A#4177152 Most Cited · 20 citations1.5/yr · PR 3.96ActiveCN · Utility
Cutoff and drainage system for permafrost tunnel edge and heading slope and cutting slope and construction method thereof

The invention relates to a cutoff and drainage system for a permafrost tunnel edge and heading slope and a cutting slope and a construction method thereof. The most important work in the engineering construction of the permafrost area edge and heading slope is the prevention of…

CN 113,570,226 A#4190962 Most Cited · 20 citations4.0/yr · PR 3.78ActiveCN · Utility
Method for evaluating occurrence probability grade of tunnel water inrush disaster in fault fracture zone

The invention relates to a method for evaluating the occurrence probability grade of a tunnel inrush water disaster in a fault fracture zone, which comprises the following steps: designing index system constituent elements; establishing an inrush water disaster occurrence…

CN 202,755,980 U#4174687 Most Cited · 20 citations1.5/yr · PR 3.99ActiveCN · Utility
Tunnel supporting structure suitable for warm permafrost region
Inventors: Han Changling, Shi Yanwen, Na Qicai, Wang Zhangjun, Chen HongweiAssignee: Cccc First Highway ConsultantsFiled 2012-08-08 · Granted 2013-02-27

The utility model relates to a tunnel supporting structure suitable for a warm permafrost region. In a tunnel construction process of warm permafrost, machinery excavation or blasting excavation can cause disturbance of original state frozen oil and aggravate destruction of the…

CN 107,780,951 A#4947241 Most Cited · 18 citations2.2/yr · PR 2.88ActiveCN · Utility
High ground stress soft rock stress large deformation preliminary bracing system

The present invention relates to a kind of high ground stress soft rock stress large deformation preliminary bracing system, polycyclic H profile steel steel arch-shelf including parallel longitudinal arrangement, connected between two Pin steel arch-shelfs of longitudinal…

CN 204,703,956 U#4937311 Most Cited · 18 citations1.6/yr · PR 2.95ActiveCN · Utility
A kind of can the waterproof and water drainage system of comprehensive maintenance tunneling drain
Inventors: Han Changling, Shi Yanwen, Kou BaowenAssignee: Cccc First Highway ConsultantsFiled 2015-06-15 · Granted 2015-10-14

The utility model relate to a kind of can the waterproof and water drainage system of comprehensive maintenance tunneling drain.The leakage problem that a large amount of tunnel occurs, can bring high risks to tunnel safety operation.The utility model longitudinally arranges the…

CN 203,239,357 U#5646982 Most Cited · 16 citations1.2/yr · PR 3.70ActiveCN · Utility
Adjacent tunnel supporting structure suitable for collapsible loess
Inventors: Han Changling, Sun Huping, Shi Yanwen, Du Kun, Liu JingAssignee: Cccc First Highway ConsultantsFiled 2013-05-14 · Granted 2013-10-16

The utility model relates to an adjacent tunnel supporting structure suitable for collapsible loess. A primary support in a mid-board of an arcade tunnel does not extend into skewbacks and is connected with the mid-board, so that differential settlement happens easily. According…

CN 203,420,715 U#7680796 Most Cited · 13 citations1.1/yr · PR 2.26ActiveCN · Utility
Cold region tunnel grid-shaped thermal insulation structure separated from wall
Inventors: Han Changling, Xia Caichu, Na Qicai, Zhang Pingyang, Yang YongAssignee: Cccc First Highway ConsultantsFiled 2013-08-06 · Granted 2014-02-05

The utility model discloses a cold region tunnel grid-shaped thermal insulation structure separated from a wall. If a thermal insulation structure with an air medium layer and polyurethane combined is adopted in a tunnel, convective heat exchange can exist in an air thermal…

CN 202,690,109 U#8233156 Most Cited · 12 citations0.9/yr · PR 2.70ActiveCN · Utility
Fireproof fan system at cross aisle of tunnel
Inventors: Han Changling, Ding Xiaojun, Shi Yanwen, Wang Zuo, Hu ManningAssignee: Cccc First Highway ConsultantsFiled 2012-05-28 · Granted 2013-01-23

The utility model relates to a fireproof fan system at a cross aisle of a tunnel. Once a fire occurs in the tunnel, smoke and toxic gas in the tunnel can spread towards the other side along the cross aisle, and although a fireproof door is arranged, a large pressure difference…

CN 203,145,030 U#8107114 Most Cited · 12 citations0.9/yr · PR 3.14ActiveCN · Utility
Water cut-off and drainage system for permafrost tunnel side upward slope and cutting slope
Inventors: Han Changling, Xia Caichu, Wang Zhangjun, Na Qicai, Lu MengAssignee: Cccc First Highway ConsultantsFiled 2013-03-22 · Granted 2013-08-21

The utility model relates to a water cut-off and drainage system for a permafrost tunnel side upward slope and a cutting slope. The most important process of permafrost region side upward slope engineering construction is to prevent a phenomenon of freeze thawing from happening,…

CN 105,604,599 A#9359505 Most Cited · 11 citations1.1/yr · PR 2.18ActiveCN · Utility
System and method for independently carrying out natural ventilation of tunnel through solar air pump

The invention discloses a system and a method for independently carrying out natural ventilation of a tunnel through a solar air pump. The system comprises a ventilation shaft arranged on a mountain above the tunnel in a penetration manner, wherein a sola air pump system is…

CN 110,397,453 A#9606749 Most Cited · 11 citations1.6/yr · PR 1.77ActiveCN · Utility
The advanced stress release pilot tunnel supporting construction of the assembled of recycling and construction method

The present invention relates to the advanced stress release pilot tunnel supporting construction of the assembled of recycling and its construction methods, in being arranged circumferentially corrugated steel ring in pilot heading, set long glass fibres anchor pole from its…

CN 205,895,256 U#9297666 Most Cited · 11 citations1.2/yr · PR 2.28ActiveCN · Utility
Working trolley suitable for construction of big section loess tunnel subsection
Inventors: Han Changling, Shi Yanwen, Kou BaowenAssignee: Cccc First Highway ConsultantsFiled 2016-07-22 · Granted 2017-01-18

The utility model relates to a working trolley suitable for construction of big section loess tunnel subsection. At the big section tunnel of loess stratum construction, face that exposes and core soil lateral wall are along with incidents such as piece, face landslide appear…

CN 106,595,103 A#10237551 Most Cited · 10 citations1.1/yr · PR 2.36ActiveCN · Utility
Construction method of energy tunnel layer burned geothermal heat exchange system

The invention discloses a construction method of an energy tunnel layer burned geothermal heat exchange system. The construction method comprises the steps of: (1) construction of a tunnel inverted arch; (2) construction of a heat exchange layer below a pavement; (3)…

CN 202,690,131 U#9894029 Most Cited · 10 citations0.8/yr · PR 3.36ActiveCN · Utility
Tunnel water discharging system penetrating through long-lasting frozen soil areas and non-frozen soil areas
Inventors: Han Changling, Xia Caichu, Na Qicai, Wang Zhangjun, Wang YushunAssignee: Cccc First Highway ConsultantsFiled 2012-05-28 · Granted 2013-01-23

The utility model relates to a tunnel water discharging system penetrating through long-lasting frozen soil areas and non-frozen soil areas. A cold-proof water discharging hole is arranged under a long-lasting frozen soil section tunnel, the construction disturbance of the…

CN 206,429,272 U#10688378 Most Cited · 10 citations1.1/yr · PR 1.81ActiveCN · Utility
A kind of tunnel in cold area Intelligent anti-freezing drainage system
Inventors: Han Changling, Shi Baotong, Zhang Xiang, Dong Changsong, Zheng WankunAssignee: Cccc First Highway ConsultantsFiled 2017-01-22 · Granted 2017-08-22

The utility model is related to a kind of tunnel in cold area Intelligent anti-freezing drainage system.Because Insulation is improper, tunnel trunk part paragraph pumping equipment easily freezes, and has a strong impact on traffic safety, threatens tunnel structure stable,…

CN 112,727,502 A#12005238 Most Cited · 9 citations1.8/yr · PR 1.78ActiveCN · Utility
Anti-fault-breakage connecting device for tunnel across fault-fracture zone and construction method of anti-fault-breakage connecting device

The invention provides a fault-fracture-resistant connecting device for a tunnel across a fault fracture zone and a construction method thereof, wherein the connecting device comprises a primary support, a waterproof layer and a secondary lining which are sequentially arranged…

CN 207,647,522 U#11828566 Most Cited · 9 citations1.1/yr · PR 1.92ActiveCN · Utility
A kind of reusable telescopic interim steelframe inverted arch structure
Inventors: Han Changling, Li Zongping, Xia Caichu, Xu Chen, Dong ChangsongAssignee: Cccc First Highway ConsultantsFiled 2017-12-13 · Granted 2018-07-24

The utility model is related to a kind of reusable telescopic interim steelframe inverted arch structures, including laterally recessed interim inverted arch steel arch-shelf;It is disconnected in the middle part of interim inverted arch steel arch-shelf and is fixedly installed…

CN 208,310,824 U#12040995 Most Cited · 9 citations1.3/yr · PR 1.74ActiveCN · Utility
It is a kind of to increase the resistance long anchor structure of Extensible type suitable for the multistage of large deformation tunnel
Inventors: Han Changling, Xu Chen, Dong ChangsongAssignee: Cccc First Highway ConsultantsFiled 2018-05-17 · Granted 2019-01-01

Increase the resistance long anchor structure of Extensible type, including more piece Extensible type component suitable for the multistage of large deformation tunnel the utility model relates to a kind of;Every section Extensible type component includes two section spirals,…

CN 111,561,332 A#13522460 Most Cited · 8 citations1.3/yr · PR 1.76ActiveCN · Utility
Construction method of mountain tunnel shock-insulation waterproof heat-insulation high polymer

The invention relates to a construction method of a mountain tunnel shock-insulation waterproof heat-insulation high polymer, which comprises the following steps: leveling the base layer; coating a polyurethane base coat; spraying high polymer; trimming the foamed polyurethane;…

CN 106,150,529 A#16036938 Most Cited · 7 citations0.7/yr · PR 1.39ActiveCN · Utility
A kind of heat insulation preliminary bracing structure in tunnel, Permafrost Area

The invention discloses the heat insulation preliminary bracing structure in tunnel, a kind of Permafrost Area, belonging to building field, the heat insulation preliminary bracing structure in this tunnel, Permafrost Area includes the thermal insulation layer being tightly…

CN 208,718,047 U#15842993 Most Cited · 7 citations1.0/yr · PR 1.51ActiveCN · Utility
A kind of inspection shaft for Quick dredging tunnel Central drain
Inventors: Han Changling, Cao Xiaoyong, Shi Yanwen, Kou Baowen, Sun HaidongAssignee: Cccc First Highway ConsultantsFiled 2018-07-18 · Granted 2019-04-09

The utility model relates to a kind of inspection shaft for Quick dredging tunnel Central drain, vertical inspection shaft main body is arranged in the Central drain in tunnel, and inspection shaft main body is located in tunnel below road surface;Inspection hole, the downward…

CN 203,685,223 U#18299855 Most Cited · 6 citations0.5/yr · PR 1.46ActiveCN · Utility
Tunnel water drainage structure beneficial to tunnel surrounding rock rapid water drainage
Inventors: Han Changling, Shi YanwenAssignee: Cccc First Highway ConsultantsFiled 2014-01-13 · Granted 2014-07-02

The utility model relates to a tunnel water drainage structure beneficial to tunnel surrounding rock rapid water drainage. The problem of tunnel water drainage is mainly solved through an annular water drainage pipe arranged in an initial supporting piece, but water drainage…