To solve the problem in which: boundaries of building regions are likely to be unclear when applying a learned model configured with neural networks using extended convolution operation to building region extraction.SOLUTION: A building determination model is a learned model…
Hamaguchi Ryuhei
To provide a building change identification device and a program capable of more easily and surely identifying a temporal change of a building.SOLUTION: A building change identification device includes: a calculation unit configured to calculate, for each unit area of images…
To prevent oversight during building extraction.SOLUTION: An architectural structure extraction system includes a first building detection device that has learned a plurality of buildings whose area belongs to a first range using a first input image for learning with a first…
PROBLEM TO BE SOLVED: To improve the performance for shielding noise caused by a heavy object hitting the floor. SOLUTION: In a floor construction where the floor is installed by keeping a predetermined height by a support leg 2 from the top of a floor base 1 such as a concrete…
To provide a premises change estimation apparatus capable of improving estimation accuracy of premises change on the basis of images of a land, premises change learning apparatus, premises change estimation method, parameter generation method of a discriminator, and…
To provide a building extraction processor and a program capable of easily and accurately extracting a building from a photographed image.SOLUTION: A building extraction processor includes: a detection part PR3 having a plurality of learned models 122 which, in a manner such…
To provide a learned model generation device and program for generating a learned model which can identify a solar panel with a higher accuracy.SOLUTION: A learned model generation device includes generation means for generating a learned model that detects a solar panel from an…
PROBLEM TO BE SOLVED: To provide a floor finish material which improves the workability, is not displaced after construction of a floor, and facilitates exchange and rearrangement thereof, whereby recycling thereof is achieved and resources are saved. SOLUTION: The plurality of…
To prevent oversight during building extraction.SOLUTION: An architectural structure extraction system includes a first building detection device that has learned a plurality of buildings belonging to a first group using an input image for learning and teacher data of…
PURPOSE:To enhance sound insulation characteristics by preventing an interior ceiling material from being vibrated by a compressed air layer. CONSTITUTION:In an interior ceiling structure wherein an interior ceiling material 3 is provided under a ceiling slab 1 comprising a…
PROBLEM TO BE SOLVED: To arrange a partition of a space in an optional position without requiring special skill and tool by allowing a slip preventive plate to abut to the ceiling or a floor surface, and arranging a compressed spring material between this plate and either one of…
To solve the problem that deviation occurs in contents in automatically extracting learning data to be used for machine learning for recognizing a building in an aerial photographic image.SOLUTION: Window image extraction means 20 arranges an extraction window of a prescribed…
To provide a building shape setting device and a program that can define an appropriate building shape more easily.SOLUTION: A building shape setting device includes: initial shape setting means for setting a rectangle according to a building region extracted from an image taken…
(57)【要約】本公報は電子出願前の出願データであるた め要約のデータは記録されません。
To provide a building geometric correction device, a method for performing a geometric correction of a building, and a program which can relate buildings according to positions or shapes more properly.SOLUTION: A building geometric correction device includes: a calculation unit…
To provide a road network generation device and others, which enable simple and highly accurate detection of an area indicating a road network using shapes of road network candidate areas.SOLUTION: A road network generation device is provided, comprising a generation unit…
(57)【要約】本公報は電子出願前の出願データであるた め要約のデータは記録されません。
(57)【要約】本公報は電子出願前の出願データであるた め要約のデータは記録されません。