Patents
Inventor / Author Profile

Guo junya

167Total Forward Citations
42Indexed Patents
7Patent H-Index
CN 106,013,192 A#2836105 Most Cited · 26 citations2.6/yr · PR 4.49ActiveCN · Utility
Method of constructing cofferdam after integrally lowering multiple layers of inner bracings of steel sheet pile cofferdam

The invention discloses a method of constructing a cofferdam after integrally lowering multiple layers of inner bracings of a steel sheet pile cofferdam. The method is applied to the technical field of cofferdam construction and comprises the following steps of: heightening and…

CN 104,631,333 A#4210432 Most Cited · 20 citations1.8/yr · PR 3.55ActiveCN · Utility
Moving hanger frame and method for small cross beam, small longitudinal beam and bridge deck slab cast-in-situ construction of arch bridge

The invention discloses a moving hanger frame and method for small cross beam, small longitudinal beam and bridge deck slab cast-in-situ construction of an arch bridge. The moving hanger frame comprises slide ways formed in cast side main beams installed on two sides and a…

CN 110,924,307 A#7496490 Most Cited · 13 citations2.2/yr · PR 2.74ActiveCN · Utility
Trestle construction method for bare rock geology

The invention discloses a trestle construction method for bare rock geology, which mainly comprises the following steps: construction preparation, abutment construction, onshore first pier expansion foundation construction, first pier steel pipe pile construction, first…

CN 205,917,702 U#9031707 Most Cited · 11 citations1.2/yr · PR 2.82ActiveCN · Utility
Whole system of transferring of bridge deep basal pit steel sheet piling cofferdam internal stay

The utility model discloses a whole system of transferring of bridge deep basal pit steel sheet piling cofferdam internal stay for cofferdam construction technical field, including internal stay, a plurality of section of thick bamboo and suspension system of protecting, the…

CN 207,919,363 U#9267351 Most Cited · 11 citations1.4/yr · PR 2.32ActiveCN · Utility
A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system

The utility model discloses a kind of Filled Steel Tubular Arch Bridge low level assembly lifting systems,Including temporary trestle bridge,Arch rib mounting bracket in temporary trestle bridge both sides is set,And the arch rib lifting bracket above temporary trestle bridge,It…

CN 104,343,086 A#10571484 Most Cited · 10 citations0.9/yr · PR 1.95ActiveCN · Utility
Small-spatial construction method for steel anchor beam anchoring zone of cable-stayed bridge upper pylon

The invention relates to a small-spatial construction method for a steel anchor beam anchoring zone of a cable-stayed bridge upper pylon. The small-spatial construction method comprises the following steps: pre-casting a scaffold all-in-one device in a steel inner formwork;…

CN 110,965,474 A#13391529 Most Cited · 8 citations1.3/yr · PR 1.84ActiveCN · Utility
Construction method of cable tower cross beam

The invention discloses a construction method of a cable tower beam, which mainly optimizes the construction scheme of setting, using and pouring of a cast-in-place support and correspondingly sets a plurality of components in a matched manner. The construction method of the…

CN 111,691,298 A#15241963 Most Cited · 7 citations1.2/yr · PR 1.77ActiveCN · Utility
Construction method for wide section of half-through arch bridge

The invention discloses a construction method for a widened section of a half-through arch bridge, which is characterized in that a prefabricated cast-in-place hanging bracket is lifted by a lifting device, so that the top surface of the cast-in-place hanging bracket is flush…

CN 205,576,744 U#18265657 Most Cited · 6 citations0.6/yr · PR 1.47ActiveCN · Utility
Special jack -up hoist is erect to cable -stay bridge cordless district large -tonnage steel case girder segment section

The utility model discloses a special jack -up hoist is erect to cable -stay bridge cordless district large -tonnage steel case girder segment section, catch hold of with a hook and be located the frame that lifts by crane that the crane barge board caught hold of the below with…

CN 105,780,659 A#21608146 Most Cited · 5 citations0.5/yr · PR 1.36ActiveCN · Utility
Lifting appliance special for erection of large-tonnage steel box beam segment in non-stayed cable area of cable-stayed bridge

The invention discloses a lifting appliance special for erection of a large-tonnage steel box beam segment in a non-stayed cable area of a cable-stayed bridge. The lifting appliance comprises floating crane plate hooks and a lifting frame located below the floating crane plate…

CN 205,917,751 U#21400409 Most Cited · 5 citations0.6/yr · PR 1.39ActiveCN · Utility
Thick clay layer device that fetches earth

The utility model discloses a thick clay layer device that fetches earth for the bridge construction practice field, include the dowel steel and establish dowel steel bottom drag for a sediment section of thick bamboo, the bottom nozzle inboard of dragging for a sediment section…

CN 209,923,186 U#19540064 Most Cited · 5 citations0.8/yr · PR 1.99ActiveCN · Utility
Hot bending die
Inventors: Wang Xiaoping, Zhou Xianglei, Wang Yan, Wei Meng, Guo junyaAssignee: Qingyuan Nanbo Energy Saving New Mat Co LtdFiled 2019-01-28 · Granted 2020-01-10

The utility model relates to a hot bending die. The hot bending die comprises: the female die comprises a first substrate, the first substrate comprises a first hot bending surface with a first joint surface opposite to the first joint surface, and the first joint surface is…

CN 111,021,245 A#23912611 Most Cited · 4 citations0.7/yr · PR 1.53ActiveCN · Utility
Lower tower column linear adjusting structure and method for rhombic cable tower

The invention discloses a linear adjusting structure and method for a lower tower column of a rhombic cable tower, which comprises the lower tower column, a transverse stay rod, a plurality of steel strands and the like, wherein the lower tower column comprises a left pier body…

CN 113,846,561 A#24331850 Most Cited · 4 citations0.8/yr · PR 1.44ActiveCN · Utility
Method for erecting 0# steel beam of cable-stayed bridge by adopting temporary stay cable and auxiliary bracket

The invention discloses a method for erecting 0# steel beams of a cable-stayed bridge by adopting temporary inhaul cables and an auxiliary bracket, relating to the technical field of bridge construction, wherein the erecting method comprises the following steps: when the main…

CN 205,529,887 U#25299436 Most Cited · 4 citations0.4/yr · PR 1.32ActiveCN · Utility
Bridge concrete anticollision barrier vertical expansion joint construction system

The utility model discloses a bridge concrete anticollision barrier vertical expansion joint construction system, including guardrail template and breaking joint template, the guardrail template includes inner formword and exterior sheathing, and inner formword, exterior…

CN 208,055,878 U#26805795 Most Cited · 4 citations0.5/yr · PR 1.16ActiveCN · Utility
A kind of Pass line adjustment and stripper apparatus for bent cap cast-in-place support

The utility model discloses a kind of Pass line adjustments and stripper apparatus for bent cap cast-in-place support, including pedestal and footstock, and the adjusting part that the footstock can be made to rise or fall is disposed between the pedestal and footstock.By the…

CN 209,906,222 U#24723420 Most Cited · 4 citations0.7/yr · PR 1.39ActiveCN · Utility
A loop wheel machine that descends river for large-span steel pipe encircles segment lift shipment

The utility model discloses a river loop wheel machine down for large-span steel pipe arch section promotes shipment, its load-carrying members who includes two sets of parallel arrangement, load-carrying members include main truss and a plurality of stand that are used for…

CN 105,672,140 A#32713493 Most Cited · 3 citations0.3/yr · PR 1.08ActiveCN · Utility
Erecting, constructing and wind preventing method for long-span cable-stayed bridge steel box girder long cantilever in violent typhoon region

The invention discloses an erecting, constructing and wind preventing method for a long-span cable-stayed bridge steel box girder long cantilever in a violent typhoon region. The method includes the steps that a bearing platform and a cable bent tower are constructed, and…

CN 110,339,989 A#31545129 Most Cited · 3 citations0.4/yr · PR 1.15ActiveCN · Utility
Ultraviolet irradiation method, ultraviolet irradiation device and ultraviolet irradiation system

The present invention relates to a kind of ultraviolet irradiation method, ultraviolet irradiation device and ultraviolet irradiation systems.A kind of ultraviolet irradiation method includes the following steps: to provide component to be irradiated, and component to be…

CN 204,551,267 U#29076652 Most Cited · 3 citations0.3/yr · PR 1.36ActiveCN · Utility
Arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge

The utility model discloses a kind of arch bridge needle beam, stringer and bridge deck cast-in-place construction travelling bridge, the edge-beam comprising slideway on the edge-beam that is contained in and watered both sides and watered across both sides and two ends are…

CN 205,576,758 U#33784401 Most Cited · 3 citations0.3/yr · PR 1.00ActiveCN · Utility
System is prevent wind in regional large -span cable -stay bridge steel case beam length cantilevered erection construction of strong typhoon

The utility model discloses a system is prevent wind in regional large -span cable -stay bridge steel case beam length cantilevered erection construction of strong typhoon, including cable tower, cable tower's bottom has the cushion cap, is equipped with anti -wind cable…

CN 109,592,569 A#36683721 Most Cited · 2 citations0.3/yr · PR 1.15ActiveCN · Utility
A kind of loop wheel machine of going to river promoting shipment for long-span Steel Arch segment

The invention discloses include two groups of load-carrying members disposed in parallel, the load-carrying members include main couple and multiple columns for being used to support the main couple, each column is fixed in stable rock stratum by upright post basic, the top that…

CN 111,042,003 A#38470410 Most Cited · 2 citations0.3/yr · PR 1.06ActiveCN · Utility
Construction method of cable-stayed bridge concrete beam combined hanging basket

The invention discloses a combined hanging basket construction method for concrete beams of a cable-stayed bridge, wherein the construction of a stay cable is divided into two times of tensioning, and the two times of tensioning are respectively carried out after segment pouring…

CN 115,387,207 A#42205944 Most Cited · 2 citations0.5/yr · PR 0.96ActiveCN · Utility
Shallow covering layer steel-concrete composite pile pier structure and construction method

The utility model relates to a shallow overburden steel reinforced concrete composite pile pier structure, including the pier, be provided with the truck-mounted platform of assembling by a plurality of flotation tank on the surface of water for build the large-scale mechanical…

CN 204,212,063 U#44059753 Most Cited · 2 citations0.2/yr · PR 0.92ActiveCN · Utility
Steel internal mold pin hand integrative-structure

The utility model relates to a kind of steel internal mold pin hand integrative-structure, comprise two relative steel internal molds, be provided with perpendicular to steel internal mold between described two steel internal molds and be barricaded as the mobile tibial bearing…