The invention relates to an intelligent agent track prediction method, a system, equipment and a storage medium, wherein the method comprises the following steps: acquiring historical track information of an agent and agents around the agent as a data set and preprocessing the…
Gui Ning
The invention discloses a photovoltaic power generation equipment radiation analysis method based on a building information model. The photovoltaic power generation equipment radiation analysis method comprises the following steps: establishing a building model comprising…
An enterprise integrated energy management and control system, comprising: the system comprises a data acquisition module, a data processing module and a system application module, wherein the data acquisition device is connected with the intelligent terminal equipment to…
The invention discloses an intelligent assisting monitoring system for a substation internet of things. The intelligent assisting monitoring system comprises a centralized management and control computer, a substation control computer, detection equipment, control equipment and…
The invention discloses a constant capacity distributed power generation optimal site selection and capacity allocation method based on a genetic algorithm. The method comprises the following steps: 1, establishing a mathematical model according to a grid topology structure and…
The invention discloses a roof type photovoltaic array pitch optimizing method based on shadow radiation analysis.The roof type photovoltaic array pitch optimizing method based on shadow radiation analysis comprises the steps that firstly, a building model and geographic…
The present invention provides a kind of complicated archival image Slant Rectify method based on convolutional neural networks, a large amount of archives samples are chosen first to be trained, construct line of text location model, it is split by line of text of the model to…
The present invention relates to a building information model based automatic laying method for photovoltaic devices. The method comprises the following steps of: establishing a building information model, and acquiring the attributes of the architecture information model;…
The invention discloses a kind of multi-source data multidimensional reconstructing method of service-oriented market access demand, belong to electricity consumption behavioural analysis electric powder prediction, including shows and big data application including data pick-up…
The present invention provides a kind of optimization corded arrangement of the roof type photovoltaic system based on Building Information Model BIM:By being digitized modeling to building, sun whole year motion model is established, obtains the irradiation of fixed…
The invention belongs to the field of building information technologies and discloses a sub-model generation method based on IFC (Industry Foundation Classes) model entity data extraction. The method comprises the following steps of reading a data source based on an IFC standard…
The invention discloses a multi-factor photovoltaic equipment optimized laying method based on shadow radiation analysis. The multi-factor photovoltaic equipment optimized laying method based on shadow radiation analysis comprise the following steps of: acquiring building…
The invention discloses an active and passive component detection method for different current components in the distorted and asymmetric voltage state of electrical network. The method comprises the following steps that the angular frequency of voltage fundamental wave is…
The invention discloses an industrial system time delay determination method based on time correlation, which comprises the steps of collecting sensor characteristics and data from an industrial system, carrying out characteristic selection on massive characteristics by…
The adaptive fining harmonic compensation method based on photovoltaic parallel in system that the invention discloses a kind of, includes the following steps:Detection photovoltaic combining inverter is operated in the output current and output voltage of photovoltaic combining…
According to the optimal installation point selection method for the active filter in the power distribution network, a plurality of basic buses are selected primarily as alternative installation points according to experience; installing APFs with active and reactive separated…
The invention discloses an energy data monitoring and comprehensive analysis device, belonging to the technical field of energy management; an energy data monitoring and comprehensive analysis device comprises a device body, wherein a WEB interaction system, an energy monitoring…
The invention discloses a power grid load early warning method and a system thereof. The power grid load early warning method comprises the following steps: the method comprises the steps of monitoring a power grid in real time, obtaining parameter data, calculating according to…
The present invention is a method for determining during run-time an adaptation to a software architecture comprising a plurality of components. The method includes the steps of—evaluating constraints for the adaptation relating to a functional dependence of components of the…
The invention relates to an S waveband segment-based multi-ary chirp modulated wireless communication system. The system comprises a transmitter and a receiver; the receiver receives transmitting signals from the transmitter; the transmitter comprises an FPGA, a system clock, a…
The invention relates to a method and a system for predicting a pedestrian track, which comprise the following steps: interpolating the coordinates in the pedestrian data set, and calculating the speed of the pedestrian at the moment; constructing a scene graph based on the…
The invention relates to the technical field of power grid load management, and particularly discloses a power grid-based multi-level load management system and a method thereof, wherein the system comprises the following components: the power grid load analysis module, the…
The utility model discloses a data comprehensive management system for an intelligent power supply system, comprising peripheral data resources and an application service system, wherein the peripheral data resources comprise a regional power grid SCADA system, an electric…
The invention discloses a prediction method and a system based on power grid load, and relates to the technical field of power grid load prediction. According to the method, the load data and the meteorological data of the power grid are analyzed to obtain the power supply…
The invention discloses a method for establishing a grounding grid based on BIM (building information modeling), which comprises the steps of building a power system model based on BIM, and acquiring electrical characteristic parameters of each electrical device in the power…