The brightness and the contrast are optimized in a video image which is used for controlling a manipulator unit. For this purpose, the gain/offset control means of a video camera producing the video image, is controlled using an image control unit in a manner such that the image…
Gebauer Werner
The transmission shaft (100) has a plug-in toothing (50) for connecting the transmission shaft with a counter piece with another plug-in toothing. The plug-in toothing is provided in one or both end areas of the transmission shaft. The transmission shaft is a carbon fiber…
The invention relates to a device and a method for optimising the brightness and the contrast of a video image, which is used for controlling a manipulating device (2). The gain/offset control of the video camera (1) is determined by the picture control unit (3) in such a manner…
The invention relates to a method for renovating underground pipelines, in particular in the sector of waste disposal sites, roads and sewage. A starting and/or target opening (2, 3) is at least partially constructed, pipelines (1) to be renovated preset at least one path (8)…
The invention relates to a device and a method for optimising the brightness and the contrast of a video image, which is used for controlling a manipulating device (2). The gain/offset control of the video camera (1) is determined by the picture control unit (3) in such a manner…
Attorney's Docket No. 8015 CAN INVENTORS: ALBIN VUICHARD, WERNER GEBAUER and BRUNO B?HLER INVENTION: AUTOMATIC BRIGHTNESS AND CONTRAST CONTROL OF A VIDEO CAMERA FOR INDUSTRIAL AND MILITARY PURPOSES ABSTRACT OF THE DISCLOSURE The brightness and the contrast are optimized in a…
The invention relates to a device and a method for optimising the brightness and the contrast of a video image, which is used for controlling a manipulating device (2). The gain/offset control of the video camera (1) is determined by the picture control unit (3) in such a manner…
The invention relates to a method for renovating underground pipelines, in particular in the sector of waste disposal sites, roads and sewage. A starting and/or target opening (2, 3) is at least partially constructed, pipelines (1) to be renovated preset at least one path (8)…