A man-machine system connected to a plant has a storage device for storing data of an ideal operator model and recognizing section for inputting voice information generated by the operator and information about the operator's line of sight. When information about a failure…
Fukuda Mitsuko
PROBLEM TO BE SOLVED: To provide an energy charge unit cost setting method capable of load leveling of electric power. SOLUTION: When a power consumption measured value and a power consumption forecast value are large, the energy charge unit cost is set to be high, thereby…
<P>PROBLEM TO BE SOLVED: To visualize the three-dimensional distribution of radiation dose rates which vary in accordance with the dislocation of a radiation source at a job site in a radioactive environment. <P>SOLUTION: A device is equipped with a memory 3 that…
<P>PROBLEM TO BE SOLVED: To enable high-speed identification of the existence of a device for maintenance and the position and the direction thereof with a reduced image processing load, from a visual field image which varies every moment with the variation of the position…
<P>PROBLEM TO BE SOLVED: To provide a device which can estimate the amount of radiation exposure dose for each operation with high accuracy based on records of a personal dosimeter weared by an operator who works in radiation controlled areas and helps to make operation…
<P>PROBLEM TO BE SOLVED: To provide an instrument calibration support system suitable for supporting the calibration of instruments of which the periods of calibration should be secured and supporting the calibration of the instruments even when past calibration data is…
PURPOSE:To realize information presentation, which can be easily understood, with being matched to the process or form of information processing for an operator by grasping the active condition of the brain in a human, selecting a display method corresponding to the process or…
PROBLEM TO BE SOLVED: To provide a thermal power plant achieved in high reliability, low material cost, and low construction cost by devising the arrangement and structure of a boiler, steam turbines, and an exhaust gas treatment apparatus to reduce a usage amount of a…
PROBLEM TO BE SOLVED: To provide a supply service of a power generating facility capable of reducing load of a city water company in installing the power generating facility to a city water facility. SOLUTION: The hydraulic power generating facility for generating power using…
<P>PROBLEM TO BE SOLVED: To predict temporal changes in the dose rate of radiation handling facilities, on the basis of schedule data. <P>SOLUTION: This managing system of the radiation handling facilities is provided with a layout data storage part 12 for storing…
A thermal power plant is proposed for achieving high reliability, low material cost, and low construction cost by devising the arrangement and structures of a boiler, steam turbines, and a flue gas treatment apparatus to reduce a usage amount of high-temperature resistance…
<P>PROBLEM TO BE SOLVED: To obtain the propriety of the contents of inspection work, in real time without imposing a burden on a worker. <P>SOLUTION: An inspection work management system for equipment can obtain the contents of inspection work in real time using…
PROBLEM TO BE SOLVED: To automatically generate a program for inspection for easily executing the inspection of a control program. SOLUTION: The program for inspecting the control program of an inspection object is automatically generated by changing the state of signals at…
PURPOSE:To provide a method by which a part necessary to change is selected out of a control program for carrying out change of equipment constitution of a plant by means of a control device and the control program is automatically produced or corrected. CONSTITUTION:The…
PURPOSE:To estimate a notice focus required by an operator with high accuracy despite the use of the abstract voice information by securing a constitution where an operator estimate the notice focus based on the produced voice information and visual line information.…
A man-machine system (14) connected to a plant (1, 18) has a storage device (12) for storing data of an ideal operator model and recognizing section (7, 9) for inputting voice information generated by the operator and information about the operator's line of sight. When…
PURPOSE:To always estimate an exact psychological state by eliminating the influence of a factor which exerts no influence on an operator's deciding capacity such as various physiological conditions, etc., from the correlation of plural biological information, and also,…
PROBLEM TO BE SOLVED: To additionally print only the added and corrected parts on a printed form by printing the management number added to the book information at a prescribed part of the print form and therefore making a processor to automatically recognize the hitherto…
PROBLEM TO BE SOLVED: To verify whether the desired control can be executed based on intermediate result of design of a control program by controlling the exchange of both actuation operation and detector signals between the control software and the operation display of a…
PROBLEM TO BE SOLVED: To provide a design example retrieval system which accurately and also simply retrieves a control examples in which time sequential changes of a control operation by a control program are similar. SOLUTION: This control program design example retrieving…
PURPOSE:To obtain information, which can be easily comprehended, coincident with the characteristic of an operator and the condition of a plant by storing a mental model provided for the human-being in respect to an objective system and presenting the required information in a…
A thermal power plant is proposed for achieving high reliability, low material cost, and low construction cost by devising the arrangement and structures of a boiler (B), steam turbines (2, 3), and a flue gas treatment apparatus (101, 102, 103) to reduce a usage amount of…
<P>PROBLEM TO BE SOLVED: To provide an operation training system equipped with a human system simulator which enables a single trainee to have a training of operation that a plurality of operators cooperate to do. <P>SOLUTION: The system is equipped with a simulating…
<P>PROBLEM TO BE SOLVED: To provide a swimming counter 1km for use in when confirming how many times a person swims back and forth in a pool. <P>SOLUTION: Fifteen strings 3 on which balls 4 and 5 with a number printed thereon are threaded, are attached to a…