The invention belongs to the technical field of high ferro non-fragment orbit maintenance, to solve the problems, such as that existing high ferro non-fragment orbit circuit there is no a whole set of, effective, quick, system method for maintaining at present, there is provided…
Fu Chongyang
A rapid construction structure and method for a secondary lining of multiple variable-cross-section bored tunnels. The rapid construction structure comprises a formwork moving support used for supporting and fixing a secondary lining formwork (4), wherein an arch frame (1)…
The invention relates to a method and a device for positioning and controlling a mobile terminal and an unmanned aerial vehicle, wherein the method for positioning the mobile terminal comprises the following steps: acquiring image information from image acquisition equipment of…
The invention belongs to gutter technical field of construction, specifically a kind of gutter disposal molding construction equipment and construction method, described construction equipment includes placed side by side in the walking track on the side slope top of gutter two,…
The network-building method of embodiment of the present invention offer and device, belong to unmanned plane field.Multiple flying unit in flight group are divided into wing plane and the first lead aircraft, the first lead aircraft replace earth station's central control…
The present invention relates to roadbed side slope construction of prevention work field, specifically a kind of roadbed side slope combination protection mechanization efficient construction method.Arched framework foundation trench uses mechanical excavation, by increasing…
The invention belongs to the technical field of high ferro non-fragment orbit maintenance, to solve the technical problem that existing high ferro non-fragment orbit maintenance is present, there is provided a kind of high ferro non-fragment orbit maintenance solid concrete…
The invention discloses a construction method for rebuilding and moving a beam of a high-speed rail elevated station, and relates to the technical field of constructional engineering. Comprises preparation work; judging the position relation between the beam moving operation and…
The embodiment of the present application provides a kind of flying vehicles control method, Apparatus and system, and described method includes: receive discernible external signal;Determine the control command corresponding to the described external signal of reception…
The invention discloses a data interaction method, a data interaction device, electronic equipment and a data interaction medium based on a virtual camera, wherein the method comprises the following steps: opening a pre-created virtual camera equipment node, and applying for a…
The invention relates to an automatic production line and production process of a steel arch, and relates to the technical field of welding production of steel arches. The device comprises a connecting plate production conveying line, a section steel feeding device, a rotary…
The invention provides a pretreatment method for a subway shield to penetrate through an extra-large-diameter boulder, which belongs to the technical field of pretreatment construction of boulders in subway shield tunnels, utilizes multiple geophysical detection methods to…
The invention belongs to the technical field of high ferro non-fragment orbit maintenance, in order to solve the technical problem that existing high ferro non-fragment orbit maintenance is present, there is provided a kind of high ferro non-fragment orbit repairs roadbed…
The present invention relates to foundation pit enclosure technical field of construction, specifically a kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure, shift to an earlier date pre-buried side wall connection…
This application provides a kind of aircraft, the flight system and control method of flight are followed, is related to aircraft field.In the aircraft, the flight system for following flight and control method, alignment system acquisition follow object motion track information…
The invention discloses an intelligent paving method and system for an asphalt water-stable subbase layer and an asphalt lower surface layer, which relate to the technical field of pavement paving and comprise the following steps: constructing a 3D intelligent paving control…
Hollow six ribs brick laying field is the utility model is related to, is specifically that one kind is used for the quick accurate positioning device of hollow six ribs brick laying.Include the cover plate being placed in the edge of arch water-blocking bank two relative…
The invention belongs to the field of tunnel concrete pouring construction, and particularly relates to a tunnel two-lining concrete left-right synchronous window-by-window pouring system and a pouring method thereof, which solve the defects of the traditional construction. The…
The invention belongs to the technical field of reinforced concrete central ditch construction, and particularly relates to a tunnel reinforced concrete central ditch construction device and a construction method thereof, which solve the defects of the traditional construction…
The invention belongs to the technical field of tunnel lining maintenance construction, and particularly relates to a telescopic rail type movable spraying maintenance rack and a maintenance method thereof. The track-type spraying maintenance platform comprises a telescopic…
The invention belongs to the field of tunnel engineering construction, and particularly relates to a tunnel excavation blasting optimization method based on drilling energy dissipation monitoring. S100, installing a dynamic pressure gauge on a drill rod clamp of a drilling…
The invention discloses a construction process temperature control method and device of an asphalt mixture and a storable medium, and relates to the technical field of temperature control, wherein the method comprises the following steps: establishing a transportation…
The invention belongs to the technical field of high-speed railway bridge repair, and particularly relates to a construction method for leveling and shifting a high-speed railway inclined box girder; righting the inclined box girder by using a jacking jack, and horizontally…
The invention relates to the technical field of materials for road engineering, in particular to a high-performance asphalt warm-mixing agent and a preparation method and application thereof. The high-performance asphalt warm-mixing agent is prepared from the following raw…
The invention discloses a comprehensive evaluation system for technician capability, which relates to the technical field of computers and comprises the following components: the self-evaluation terminal, the background cloud server and the correction evaluation terminal; the…